A Project By DSP Fortune Buildtech +91 8s3O is ggge | 8s3o 38 e8s8 qqcT zfrq {frt, qe qrR, qlQrs 1, 2 BHK 3[IOr caH qI rrd g.rta{r FORM-2 q. [See Regutation 3] ENGINEER'S CERTIFICATE Dale:30109t2021 To, The DSP FORTUNE BUILDTECH, 203, KAMALKANT ARCADE, THATTE NAGAR,NASHIK subiect : certificate of cost lncurred for Development prathamesh park of for Construction of 2Wing(s) C & D of the Second Phase ( MahaRERA Registration Number) situated on the prot bearing PNO 4+5+6, OF SNO 97 0 I 38 I (1 +2+ 3) +91 1 I 2At 2(1 +2+3) +97 1 I 28 I 2 OF NAS H I K S H |WAR, NASHIK demarcated by its boundaries ( ratitude and rongitude of the end points) sNo 971l2Bl1 to the North 1g M Dp ROAD to the south .:r" 1 uf to the East 7.5M road to the west of Division Nashik Viilage Nashik Taluka Nashik District Nashik PIN 422007 admeasuring 3105 3 sq.mts. area being deveroped by DSP Fortune Buildtech Ref : MahaRERA Registration Numberp51600023213 Sir, li we Hitesh Deo have undertaken assignment of certifying Estimated cost for the subject Real Estate Project proposed to be registered under MahaRERA, being 2 wing(s) of the First phase situated on the prot bearing pNo 4+5+6, oF sNo 97 0 I 38 I (1 +2+ 3) +97 1 I z\t 2(1 +2+3) +97 1 I 28 I Z. of Divi sion N ash k Vi ta ge Nashik Tatuka Nashik i I District Nashik PIN 422007 admeasuring 3105.3 sq.mts. area being deveroped by [owner/promoter] 1 Following technicar professionars are appointed by owner / promoter :_ (i) M/s /Shri/Smt : Ar.Sumit Kumat as L S. / Architect ; (ii) M/s /shri/smt Mirind Rathi as structurar consurtant (iii) M/s /Shri/Smt as MEP Consultant (iv) M/s /Shri/Smt Hitesh Deo as euantity Surveyor * 2' we have estimated the cost of the completion to obtain occupation certificate' of the civil, MEP and Allied works, certificate/ completion of the Building(s) of the project. our estimated calculations are based on the Drawings/plans cost made available to us for the project under reference the Developer and consultants and the schedule by of items and quantity for the entire work as calculated by Hitesh Deo quantity Surveyor. appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of comptetion of the building(s) of the aforesaid project under reference as Rs. 6,50,00,0001Tota1 of Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from the NASHIK MUNCIPAL CORPORATION being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. ,r 4. The Estimated Cost lncurred till date is calculated at Rs.90,00,000/-(Total of TableA and B) -Ihe amount of Estimated Cost lncurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate / Completion Certificate from NASHIK MUNCIPAL CORPORATION (planning Authority) is estimated at Rs. 5,60,00,000/-(Total of Table A and B). 6 I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below . TesLe A Building ANing bearing Numbe C & D or called (to be prepared separately for each Building A/Vlng of the Real Estate Project) Sr No Particulars Amounts (1) (2) (3) 1 Total Estimated cost of the building/wing Rs. 6,00,00,000/- as on 29/1112019 date of Registration is 2 Cost incurred as on 3OlO9l2O21 Rs. 72,00,0001 (based on the Estimated cost ) 3 Work done in Percentage 12 o/o (as Percentage of the estimated cost ) 4 Balance Cost to be lncurred Rs. 5,28,00,000/- (Based on Estimated Cost) 5 Cost lncurred on Additional /Extra ltems Rs.NlL as on not included in the Estimated Cost (Annexure A) TngL.e B (to be prepared for the entire registered phase of the Real Estate Project) Sr. No Pafiiculars Amounts (1) (2) (3) 1 Total Estimated cost of the lnternal and External Rs. 50,00,0001 Development Works including amenities and Facilities in the layout as on 2911112019 date of Registration is (1) (2) (3) Cost incurred as on 30/09/2021 Rs 18,00,0001 (based on the Estimated cost). Work done in Percentage 36 Yo (as Percentage of the estimated cost). Balance Cost to be lncurred Rs.32,00,0001 (Based on Estimated Cost). Cost lncurred on Additional /Extra ltems Rs. NIL as on _not included in the Estimated Cost (Annexure A). Yours Faithfully, Signature of Engineer. (Licence No. +y ) * Note : 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate/Completion Certificate. 2. (.) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer ln case of independent quantity surveyor being appointed by Developer, the hame has to be mentioned at the place marked (-) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (.). 3 The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. 4. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred / to be incurred. 5. All components of work with specifications are indicative and not exhaustive. Annexure A List of Extra/Additional ltems executed with Cost (which were not part of the original Estimate of Total Cost)