Nashik Municipal Corporation OCCUPANCY CERTIFICATE Application No. NMC/TPD/Nashik/OC/0120/2021 Application Date: 11 November, 2020 Date : 01/06/2021 Permission No:/OC LND/OC/Nashik/DCR/0163/2021 Occupancy Issued Date: 01 June, 2021 Building Permit No: LND/BP/NASHIK/DCR/0502/2020 Building Permit Date: 10 November, 2020 Building Commencement Notice submitted by the Applicant 11 November, 2020 Ref: Building Completion Notice submitted by the Applicant 25 February, 2021 CSC Occupancy No. NMC/TPD/Nashik/OC/0120/2021 The Owners/Builder/Developer /Licensed Architect/Engineer / Structural Engineer have given the Building Completion Notice that the building has been completed as per the specifications of Sanctioned Plans and it is declared that the building conforms in all respects to the requirements of the building regulations contained under the statutory provisions in the respective Municipal Act and Building Bye Laws/Rules issued by the Govt. This is to certify that the building has been inspected and is declared fit for occupation. NAME OF THE CENTURY BUILDERS DEVELOPERS A OWNER/Developer B LOCATION OF THE PROPOSED SITE 1 Plot No. 18 2.Survey No. 163/2/22 3 District Nashik 4.Village Nashik 5 Division Panchwati 6.Town/ City NASHIK C DETAILS OF THE COMPLETED BUILDING 1 Building Permit / Permission No. LND/BP/NASHIK/DCR/0502/20 Building Permit / 10 November, 2020 20 Permission Date a Due date for completion of the building 10 March, 2021 b Date on which completion notice submitted 25 February, 2021 2 c Whether it is completed within the stipulated time YES d If No, to collect the Fine Rs(7200/-) for Revalidation /Revised Charges as per the NMC Act as per the rules in force As per Documents As per submitted Plan Road Widening Area Net Area 3 Site Area (m2) 0.00 0.00 0.00 708.22 D BUILDING WISE DATA Building Name Building Name CENTURY BUILDERS DEVELOPERS No. of Floors Cellar + Stilt Ground +Upper Floors 4 a As per Sanctioned Plan 0Celler+0 Stilt 0Ground Floor + 4Upper Floor b As per Completed Building Plan 0Celler+0 Stilt 0Ground Floor + 4Upper Floor Use of the Building 5 a As per Sanctioned Plan Residential b As per Completed Building Plan Residential Floor Area (m2) 6 a As per Sanctioned Plan 906.26 b As per Completed Building Plan 906.26 i) Parking Area (m2) ii)Tot -lot area (m2) 7 a As per Sanctioned Plan 0 0 b As per Completed Building Plan 0 0 Setbacks(m) Front Rear Side-1 Side-2 a As per Sanctioned Plan 5.00 4.50 4.00 5.00 b As per Completed Building Plan 5.00 4.50 4.00 5.00 8 c Extent of deviation in % 0.00 0.00 0.00 0.00 d Fine Paid Rs( ) as per the NMC Act, as per rules in force Height (m) 9 As per Sanctioned Plan 11.55 As per Completed Building Plan 11.55 RWH(Rain Water Harvesting ) 10 As per Sanctioned Plan 1 As per Completed Building Plan 1 Yours faithfully, Organization : Personal Designation : Executive Engineer Date : 01-Jun-2021 12: 20:47 Certificate : 4C06AA9674B13DFB Authority_Sign Executive Engineer Nashik Municipal Corporation Copy to: 1. The Addl. Commissioner (Fin.), NMC . 2. The Zonal Commissioner, NZ, NMC . 3. The Dy. Commissioner, Circle No.-, NMC with a request for assessment of PT / VLT upto date. 4. The Asst. City Planner, Circle No.-, NMC . 5. The Sub-Registrar, ______________ with a request to release the mortgaged area. 6. The Addl. Commissioner (Revenue), NMC with a request for assessment of property tax at once from the date of issue of O.C.