YogeshThatte STHUCTURAL CONSULTANT C-2, Anand Bhakti Sankul, Near Ruturang Bhavan, Nashik Road - 422101 Mob. 9822678396 Email : yogeshathatte@gmai!.com DATE:zLltllt9 FORM - 2 ENGIN EER'S CERTIFICATE To: ASHOKBHAT BATUKBHAT ADROJA (HUF), Subject: Certificate of Cost lncurred for Development of Residential one building of the project "NAVSHYA HIGHTS" building situated on PLOT NO.1+2 SURVEY NO.774l775l2lL SHaWAR NASHIK demarcated by its boundaries (latitude and longitude of the end points) PLOT NO. 3 to the North 9.00 MT WIDE ROAD to the South S.NO.775lLB to the East,9.00 MT WIDE ROAD to the West of Division Nashik village Nashik taluka Nashik District Nashik admeasuring757.68 SQMT.Area being developed ASHOKBHAI BATUKBHAT ADROJA (HUF). Ref. RERA Registration Number (applied for) Sir, I YOGESH THATTE have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under RERA, being one Building "NAVSHYA HIGHTS " Building situated on the plot bearing C. N. No/ CTS No. PLOT NO.1+2 SURVEY NO. 77417751211 of Division Nashik village Nashik taluka Nashik District Nashik admeasuring757.68 sq.mts. Area being developed by ASHOKBHAI BATUKBHAI ADROJA (HUF). 1. Following technical professionals are appointed by Owner / Promoter:- (i) RUSHIKESH K. PAWAR as Architect; (ii) Mr. Yogesh Thatte as Structural Consultant (iii) Mr. as Quantity Surveyor 2. We have estimated the cost of the completion to obtain Occupation Certificate / Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings / plans made available to us for the project under reference by the Developer and Consultant and the Schedule of times and quantity for the entire work as calculated by Mr. quantity Surveyor* appointed by Developer/ Engineer, and the assumption of YOGESH TI{ATTE STRUCTURAL CONSULTANT GWing, 2-Anand Bhakti Sankul, - 4?2 101 Datta Mandir Road, Nasik Road Ph.:- 2462230 inspection carried out by the cost of material, labour and other inputs made by developer, and the site US. project under 3. We estimate Total Estimated cost of completion of the building(s) of the aforesaid to the Civil, MEP, reference as Rs.3,5g,0t,O4gl-.The estimated Total Cost of project is with reference certificate / and allied works required to be completed for the purpose of obtaining occupation Nashik being the completion certificate for the building(s) from the Nashik Municipal Corporation, planning Authority under whose jurisdiction the aforesaid project is being implemented. A and B). The amount of 4. The Estimated Cost tncurred till date is calculated at Rs. 0/-(Total of table Cost. Estimated Cost lncurred is calculated on the base of amount of Total Estimated of the subject 5. The batance cost of Completion of the Civil, MEP and Allied works of the Building(s) project to obtain Occupation Certificate / Completion Certificate from Nashik Municipal Corporation, Nashik (planning Authority) is estimated at Rs3,58,01 ,O49 l' (Total of table A and B)' on the 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed date of this certificate is as given in Table A and B Below. TABLE - A Building : "NAVSHYA HIGHTS" Sr. No. Particulars Amounts L Total Estimated cost of the building/wing as Rs.3,52,51,049/- on24lttl19 date of Registration is 2 Cost incurred as on 24/1'1'/L9 (based on the Rs.0/- Estimated cost) 3 Work done in Percentage (as Percentage of the estimated cost) Oo/o 4 Balance Cost to be lncurred Rs . 3,52,51,0491- (Based on Estimated Cost) 5 Cost lncurred on Additional / Extra ltems as on 24/11./2019 not included in the Estimated Cost NIL (Annexure A) -.*e YOd,ESH TTIATfi!) STRUCTURAL CONSUI.ITANT Gwino. 2'Anand Bhakti Sankut' Road - 4?2 101 Datta Gndii Road, Nasik Ph.i 2462239 TABLE - B (To be prepared forthe entire registered phase ofthe Real Estate Project) Sr. No. Particulars Amounts 1 Total Estimated cost of the lnternal and External Development Works including amenities and Facilities Rs.5,50,000/- in the layout as on 24/1,7/20L9 date of Registration is 2 Cost incurred as on 24/tU2Ot9 (based on the Estimated cost) RS. o/- 3 Work done in Percentage (as Percentage of the estimated cost) 0% 4 Balance Cost to be lncurred (Based on Estimated Cost) Rs.5,50,000/- 5 Cost lncurred on Additional / Extra ltems as on 241t1.120t9 not included in the Estimated Cost NIL (Annexure A) STRUCTURAL CONSULTANT NAME: MT. YOGESH THATTE PAN CARD:ABSPT2479D YC#-ESH TT{ATTE AADHAR CARD : 92597 1529489 STRUCTU I1AL CONS UITA}IT C-Wing, 2-Anand Bhakti Sankul, CONTACT NO: 9822678396 Datta Mandir Road, Naik Road - 4U 191 Ph.i 2462239