I SAGAR S. SHAH B.E.(Givil) M.l.E.,F.l.V. F -27433 Cell : 9422247125 E-mail : er.sagarshah@gmail.com o Approved Valuer o Consulting Engineer 54, Sahajeevan Colony, Visemala, College Road, Nashik - 422 OO5 FORM 2 ENGINEER'S CERTIFICATE Date: L4.t2.2024 To, SHYAM CONSTRUCTION 3, Vaishnavi Row House, Lane No.4, Kala Nagar, Opposite Reliance Petrol Pump, Dindori Road, Panchavati, Nashik - 422003 Subiect: Certificate of Cost Incurred for Development of SHYAM VRINDAVAN having MahaRERA Registration Number P51600023205 being developed SHYAM CONSTRUCTION. Sir, I, Er. Sagar S. Shah have undertaken assignment of certiffing Estimated Cost for SHYAM VRINDAVAN having MahaRERA Registration Number P51600023205 being develofied by SHYAM CONSTRUCTION. t. We have estimated the cost of Civil, MEP and Allied works required for completion of the apartments and proportionate completion of internal & external work of the project as per specifications mentioned in agreement of sale. Our estimated cost calculations are based on the Drawings/plani made available to us for the project under reference by the Developer / Consultants. The Schedule of items and quantity required for the entire work as calculated by Er. Sagar S. Shah Quantity Surveyorx appointed by Developer/Engineer, the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us tb ascertain / confirm the above analysis given to us. 2. We estimate Total Estimated Cost of completion of the aforesaid project under reference as Rs. 15,83,50,900/- (In words Rupees Fifteen Crores Eighty Three Lakhs Fifty Thousand Nine Hundred Only) (Total of Table A and B) at the time of Registration. The estimated Total Cost of project is with reference to the Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal & external worh as per specifications mentioned in agreement of sale and for the purpose of obtaining occupation certificate / completion certificate for the Building(s) / Wing(s) / Layout / Plotted Development from the Nashik Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. ineei * Approved r!. !'aiuer t.27 433 sHl a 3 The Estimated Cost Incurred till date is calculated at Rs. g,ZZ,4g,4SO/- Table A and B). The amount of Estimated Cost Incurred is calculated fTotal of on the basis of input materials / services used and unit cost of these items. 4 The Balance cost of Completion of the Civil, MEP and Allied works for completion of apartments and proportionate completion of internal & externat work as per specifications mentioned in agreement of sale, of the project is estimated at Rs. 7,61,01,450/- (Total of Table A and B). 5. I certiff that the Cost of the Civil, MEP and Allied works for apartments and proportionate internal & external work as per specifications mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: TABLE A SHYAMVRINDAVAN-AWING S. No. Particulars Amounts Total Estimated cost of the Building 1 as on date of Rs. 9,83,68,000/- ts 2 Cost incurred as on date of certificate Rs.2,45,92,000/- Work done in Percentage 3 as Pe rcen of the esti mated cost 25o/o Balance Cost to be Incurred 4 Rs.7,37,76,000/- on Estimated C ost Cost I ncurred on Extra Items not included in the 5 Estimated Cost able NIL TABLE A SHYAM VRINDAVAN - B & C WING S. No. Particulars Amounts Total Estimated cost of the Building 1. as on date of Rs. 5,53,32,000/- stration is 2 Cost incurred as on date of certificate Rs. 5,53,32,000/- Work done in Percentage 3 l00o/o as Percen of the estimated cost Balance Cost to be Incurred 4 NIL sed on Estimated C ost Cost Incurred on Extra Items not included in the 5 NIL Estimated Cost # TABLE B SHYAM VRINDAVAN Internal & External Development Works in Respect of the Registered Phase S. No. Particulars Amounts Total Estimated cost of Internal & External L Development Works including amenities and Rs.46,50,900/- Facilities in the layout as on date of Registration is 2 Cost incurred as on date of certificate Rs.23,25,450/- Work done in Percentage 3 50o/o (as Percentage of the estimated cost) Balance Cost to be Incurred 4 Rs.23,25,450/- fBased on Estimated Cost) Cost Incurred on Additional /Extra Items 5 NIL not included in the Estimated Cost fTable CJ Yours Faithfully r , 7 O:,' ', (iri; ,., ' llI * l,/ ER. SAGAR S. SHAH Signature of Engineer Agreed and Accepted by: Signature of Promoter Name: SHYAM CONSTRUCTION Partner: MR. DILIPKUMAR RAJURAM SAINI Date: L4.t2.2024 * Notes: 1. The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in igreement of sale. 2. All components of work with specifications are indicative and not exhaustive. 3. Please speciff if there are any deviations / qualifications. Example: Any deviations in input material used from specifications in agreement of sale. TABTE C List of Extra / Additional / Deleted Items considered in cost [which were not part of the original Estimate of Total Cost) S. No. List of Extra Additional / Deleted Items Amount (In Rs.) NIL NIL ).