202, Second Floor, Roonglo Arcode, Opp. Kulkorni Gorden, Shoronpur Rood, Noshik-422001 Ar, Ponkoj Jodhov . Ph : 0253 - 2232575. e-moil : jodhovponkojO2@gmoil.com Annexure A FORM 1 [See Regulation 3] ARCHITECT'S CERTIFICATE Date: 14.12.2024 To, SHYAM CONSTRUCTION 03, Vaishnavi Row House, lane no.-04, Kala Naga Opp. Reliance petnrlpump, Near Data Mandir, Dindori Road, Panchvati, NASHIK-422003. Subject: - Certificate of Percentage of Completion of Construction Work of 'SHYAM VRINDAVAN" having Maha RERA Registration Number P51600023205 being developed by SHYAM CONSTRUCTION. Sir, I tvtr. Pankaj Jadhav have undertaken assignment as Architect / Licensed Surueyor of Certiffing percentageof Completion of Construction Work of "SHAM VRINDAVAN" having llaha RERA Registrati-on Number P51600023205 being developed by SHYAM CONSTRUCTION' of the aforesaid Based on the Site lnspection, with respect to the Layout / eachof the BuildingMing n""iirt t" project, I certify ihrt on date of this iertificate, the Percentage of Work done for each "r of the Buildingruing of the Real Estate Prcject under Maha RETA is as perTable-A herein below' ine p"r."nta!e of frork executed with resfect to each of the activity of entire Phase is detailed in Table-B. \ e$ Ar. Pankaj P. Jadhav B. Arch. cA!20L4164783 Office No. 202, ,iunqta Arcade APartment .t1:p. Kulkarni Garden, ;i,rrr,rnPut Road, Nashlk-422 005 TABLE-A ..SHYAM VRINDAVAN "WING A S. No. Tasks / Activity Percentage of Actual Work Done (1) 12) (3) 1 Excavation 1O0o/o 2. Basements lOOo/o 3. Podiums (if any) NA 4. Plinth 1O0o/o 5. Stilt Floor lOOo/o 6. l2Slabs of Super Structure 55o/o 7 lntemal Walls, lntemal Plaster, Floorings, Doors, windows O0o/o within Flats / Premises 8 Sanitary Fittings within Flats / Premises O0o/o I Staircases, Lift Wells & Lobbies at each Floor Level O0o/o Overhead and Underground Water Tanks 10 Extemal Plumbing & Extemal Plaster, Elevation, O0o/o Completion of Tenaces, with waterproofing of the Building I 11 lnstallation Water Pumps, Fire Fighting Fittings O0o/o and Equipment as per CFO NOC, ElectricalFittings, Mechanical Equipment, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenantto BuildingM/ing, Compound Walland all other requirements as may be required to complete P@ect as per specifications to of Sale, Any other Activity Ar. Pa kaj P. Jadhav B. Arch. cAt2ot4l64783 Office No. 202, tuno,o Arcade APartrnent Cpp. f,'rttarni Garden' ]r".i.uintt Road, Nashlk'422 005 TABLE-B *SHYAM VRINDAVAN" W|NG B&C (1) (2t (3) 1 Excavation 1O0o/o 2 Basements (if any) N.A 3. Podiums (if any) NA 4. Plinth lOOo/o 5. Stilt Floor lOOo/o 6. 08 Slabs of Super Structure lOOo/o 7 lntemal Walls, lntemal Plaster, Floorings, Doors, windows lOOo/o within Flats / Premises 8. Sanitary Fittings within Flats / Premises lOOo/o 9. Staircases, Lift Wells & Lobbies at each Floor Level lOOo/o Overhead and Underground Water Tanks 10. Extemal Plumbing & Extemal Plaster, Elevation, lOOo/o Completion of Tenaces, with waterproofing of the Building /Wins 11 lnstallation of Lifts, Water Pumps, Fire Fighting Fittings 100o/o and Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipment, Compliance to conditions of EnvironmenllCPZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to BuildingMing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any otherActivity t\\ Ar. Pankaj P. Jadhav B, Arch. cAl?ot4l6478l Offite No. 202, run.lt.? Arcade APartment ior> iiutkarni Garden, .,-,.',.,rr*,, Road, Nashik-422 005 \ TABLE.C Common Areas (lnternal & Extemal Development Worfts) in respect of "SHYAM VRINDAVAN" S. no. Common areas Proposed ( Yes/ Percentage of Details and Facilities, No) work done Amenities 1 lntemal Roads & No 0 Not Applicable Footpaths 2 Water supply YES 0 To be obtained from NMC on completion of the project 3 Sewerage ( YES 0 Willbe provided chamber, lines, only if required by septic tank, STP) NMC UDCPR Rules 4 Storm Water No 0 NA Drains 5. Landscaping & No 0 Willbe provided Tree Planting only if required by NMC UDCPR Rules 6. Street Lighting No 0 NA 7 Community No 0 NA Buildings 8. Treatment and Yes 0 Willbe provided disposalof only if required by sewage and NMC UDCPR sullaqe water Rules 9. Solid Waste No 0 NA management & Disposal 10. Water Yes 0 Willbe provided conservation, rain only if required by Water harvesting NMC UDCPR Rules 11 Energy No 0 NA manaqement 12. Fire protec{ion Yes 0 Willbe provided and fire safety only if required by requirements NMC UDCPR Rules 13. Electricalmeter No 0 lndividual Electric room, sub-station, Meter provided receiving station after completion Yours faithfullY, \ $s\., Architeff \ Accepted bY SHYAM CONSTRUCTION AR. PAI{KAJ JADHAV Ar. Pankaj P. Jadhav B. Arch. cAt20L4l6478l Office No. 202, riungta Arcade APartment ,Joo. Kulkarni Garden, itiaranpur Road, Nashlk-422 005