202, Second Floor, Roongto Arcode, Opp, Kulkorni Gorden, Shoronpur Rood, Noshik42200l . Ph : 0253 - 2232575.e-moil : jodhovponkoj02@gmoit.com Ar, Ponkoj Jodhov FORM 1 ARCHITECT'S CERTIFICATE Date:30-09-2024 To, M/s. KalantriAnd Musale Realcon LLP Shop No.2,Building No. F/10. Shreeram Kunj, Tigrania Road, Dwarka, Nashik-422011 Subject: Certificate of Percentage of Completion of Construction work BAIAJI PARK having 11 buildings named A,B,C,D, E, F, G, H, l, J & K having Maha RERA Registration Number P51500023182 being developed by M/s, KalantriAnd Musale Realcon LLP Sir, l, Ar. Pankaj Jadhav have undertaken assignment as Architect of certifying Percentage of Completion of construction work BALATI PARK having 11 buildings named A, B, C ,D, E, F, G, H, l, J & K having Maha RERA Registration Number P51500023182 being developed by M/s. KalantriAnd Musale Realcon LLP, situated on the bearing Survey No. Gut No. 449, Village Gangapur, Taluka & District Nashik. Based on Site lnspection, with respect to Layout / each of the Building/ Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the Building / Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The of the executed with respect to each of the activity of the entire phase is detailed Table B. U,tA 1\ Ar. Pankai P. Jadhav B.Arch. Reg. No. CAl20t4l54?83 office No. 205 b 210, Roongta suprernus, Near chandak circte, rHin.il iX,rrT,i?: Table A BALAJI PARK "A" Building Sr. Task /Activity Percentage No. of work done 1 Excavation I00 o/o 2 1 Number of Plinth 100 % a J 0 Number Of Podiums 0 4 0 Stilt Floor 0 5 2 Number of slabs of super structure t00 % 6 Internal walls, Internal Plaster, Floorings within flats / premises, Doors, 100 % Windows to each of the Flat / Premises 7 Sanitary fitting within the flat / premises, Electrical fitting within the flat 100 % / premises 8 Staircase, Lift well and Lobbies at each floor level connecting staircase 100 % and lift, Overhead and underground water tanks. 9 External plumbing and extemal plaster, elevation, completion of terrace 100 % with watergoofing of the / Wing 10 Installation of lift, water pumps, fire fighting fitting and equipments as r00 % per cEo Noc, Electrical fiuing to common areas, electro mechanical equipments, Compliance to conditions of environmenttCRZ NOC, Finish to entrance lobby, Plinth protection, Paving to areas appurtenant to building / wing, compound wall and all other requirements as may be required to obtain / Completion certificate \ \\-\ Ar. Palrrai P. Jadhav Res. No. ceporf,r&!'J; TS l?. 2q,6.to_210, Roongra Supremus, ruearchandak circte, rHl;fl lrrrltl: Table A BAIA,l PARK "B" Building Sr. Task / Activity Percentage No. ofwork done 1 Excavation 100 % 2 I Number of Plinth t00 % J 0 Number Of Podiums 0 4 0 Stilt Floor 0 5 2 Number of slabs of super structure 100 % 6 Internal walls, Internal Plaster, Floorings within flats / premises, Doors, 100 o/o Windows to each of the Flat / Premises 7 Sanitary fitting within the flat / premises, Electrical fitting within the flat 100 % / premises 8 Staircase, Lift well and Lobbies at each floor level connecting staircase 100 % and lift, Overhead and water tanks. 9 External plumbing and extemal plaster, elevation, completion of tenace 100 % with watel proofing of the B lWing l0 Installation of lift, water pumps, fire fighting f,rtting and equipments as 100 % per CEO NOC, Electrical fitting to common areas, electro mechanical equipments, Compliance to conditions of environmentlCRZ NOC, Finish to entrance lobby, Plinth protection, Paving to areas appurtenant to building / wing, compound wall and all other requirements as may be required to obtain Occupation / Completion certificate q,r'{ Ar. pCnr,Ji P. Jadhav ![ce Ree. No. cA/20 No. 206 to 210, Roongta iiil,!; Suprenrus, Near chandak circte, rlffil l*r"rHi: Table A BALA,I PARK "C" Building Sr. Task / Activity Percentage No. ofwork done I Excavation r00 % 2 1 Number of Plinth rc0% J 0 Number Of Podiums 0 4 0 Stilt Floor 0 5 2 Number of slabs of super structure 100 % 6 Internal walls, Internal Plaster, Floorings within flats / premises, Doors, t00 % Windows to each of the Flat i Premises 7 Sanitary fi tting within the flat / premises, Electrical fitting within the flat 100 o/o / premises 8 Staircase, Lift well and Lobbies at each floor level connecting staircase 100 % and lift, Overhead and water tanks. 9 External plumbing and external plaster, elevation, completion of terrace 100 % with water proofing of the / Wing 10 Installation of lift, water pumps, fire fighting fiuing and equipments as 100 % per cEo Noc, Electrical fitting to common areas, electro mechanical equipments, Compliance to conditions of environment/CRZ NOC, Finish to entrance lobby, Plinth protectiorq Paving to areas appurtenant to building / wing, compound wall and all other requirements as may be to obtain certificate Ar. P. Jadhav B.Arch. fGg.No. cA12014164783 ffice No. 206 to 210, RoongEa grprenrus, Near chandakcircte, rl$fl IX.ffi?: Table A BAIAJI PARK "D" Building Sr. Task / Activity Percentage No. of work done I Excavation 100 o/o 2 I Number of Plinth 100 % a J 0 Number Of Podiums 0 4 0 Stilt Floor 0 5 2 Number of slabs of super structure 100 o/o 6 Internal walls, Intemal Plaster, Floorings within flats / premises, Doors, 100 % Windows to each of the Flat / Premises 7 sanitary fitting within the flat / premises, Electrical fitting within the flat 100 % / premises 8 Staircase, Lift well and Lobbies at each floor level connecting staircase 100 % and lift, Overhead and water tanks. 9 External plumbing and extemal plaster, elevation, completion of terrace 100 % withwater proofing of the B / Wing 10 Installation of lift, water pumps, fire fighting fitting and equipments as 100 o/o per CEO NOC, Electrical fitting to common areas, electro mechanical equipments, Compliance to conditions of environmentlCRZ NOC, Finish to entrance lobby, Plinth protection, Paving to areas appurtenant to building/ wing, compound wall and all other requirements as maybe required to obtain Occupation / Completion certificate \{,{ Ar. Pankaj P. Jadhav B,Arch. Reg. No. CA|20L4 i itaT 83 Office No. 205 to 210, Roongta Supreirius, *ear chandak circre, rxlH ix5r11i. Table A BALAJI PARK "E" Building Sr. Task /Activity Percentage No. ofwork done I Excavation 100 o/o 2 1 Number of Plinth 100 o/o J 0 Number Of Podiums 0 4 0 stilt Floor 0 5 2 Number of slabs of super structure 100 o/o 6 Intemal walls, Intemal Plaster, Floorings within flats / premises, Doors, 100 o/o Windows to each of the Flat / Premises 7 Sanitary fitting within the flat / premises, Electrical fiUing within the flat 100 % 8 Staircase, Lift well and Lobbies at each floor level connecting staircase 100 % and lift, Overhead and underground water tanks. 9 Extemal plumbing and external plaster, elevation, completion of terrace 100 o/o with water proofing of the 4Eine 10 Installation of lift, water pumps, fire fighting fitting and equipments as t00 % per cEo Noc, Electrical fitting to common areas, electro mechanical equipments, Compliance to conditions of environment/CRZ NOC, Finish to entrance lobby, Plinth protection, Paving to areas appurtenant to building/ wing, Compound wall and all other requirements as may be to obtain certificate \ *$r.rtf,L?;1 Reg. No. CAlZ0tqt64783 Ofice No. 206 to 210, Roorgta Supreinus, Near chandak circte, rHl;il llffi?: Table A BALAJI PARK "F" Building Sr. Task / Activity Percentage No. ofwork done I Excavation t00 % 2 1 Number of Plinth 100 % J 0 Number Of Podiums 0 4 0 Stilt Floor 0 5 I Number of slabs of super structure 100 o/o 6 Intemal walls, Internal Plaster, Floorings within flats / premises, Doors, rco% Windows to each of the Flat / Premises 7 Sanitary fitting within the flat / premises, Electrical fitting within the flat t00 % / premises 8 Staircase, Lift well and Lobbies at each floor level connecting staircase 100 % and lift, Overhead and underground water tanks. 9 External plumbing and extemal plaster, elevation, completion of terrace 100 o/o with water proofing of the B uilding/ Wing 10 Installation of lift, water pumps, fire fighting fitting and equipments as t00 % per cEo Noc, Electrical fitting to common areas, electro mechanical equipments, Compliance to conditions of environment/CRZ NOC, Finish to entrance lobby, Plinth protection, paving to areas appurtenant to building / wing, compound wall and all other requirements as may be uired to obtain certificate \ or.Hn*, P. Iadhav B.Arch. Reg. t'lo. CAI 20t4 I 54783 Office No. 206 to 210, Roongta St:1 ';:::ii1:'tS, Near chandak circle, riliffi ilTrT,ii: Table A BAIA,l PARK "G" Building Sr. Task / Activity Percentage No. of work done I Excavation 100 % 2 1 Number of Plinth 100 o/o 3 0 Number Of Podiums 0 4 0 Stilt Floor 0 5 2 Number of slabs of super structure 100 % 6 Internal walls, Internal Plaster, Floorings within flats / premises, Doors, 100 % Windows to each of the Flat / Premises 7 Sanitary fiuing within the flat / premises, Electrical fitting within the flat t00 % / premises 8 Staircase, Lift well and Lobbies at each floor level connecting staircase 100 % and Overhead and water tanks 9 External plumbing and external plaster, elevation, completion of terrace 100 % with water proofing of the Building / Wing 10 Installation of lift, water pumps, fire fighting fitting and equipments as t00 % per CEO NOC, Electrical fitting to common areas, electro mechanical equipments, Compliance to conditions of environmentlCRZ NOC, Finish to entrance lobby, Plinth protection, Paving to areas appurtenant to building / wing, Compound wall and all other requrements as may be to obtain certificate H4 Ar. padtaj P. Jadhav B.Arch. Reg. No. CAlZ}t4l64783 Office No. 206 to 210, Romgta SuJ.,rs6rr, Near chandak circh, ,ls[ ix5rr[1i: Table A BALAJI PARK "H" Building Sr. Task / Activity Percentage No. ofwork done 1 Excavation 100 % 2 I Number of Plinth t00 % J 0 Number Of Podiums 0 4 0 Stilt Floor 0 5 2 Number of slabs of super structure 100 % 6 Internal walls, Internal Plaster, Floorings within flats / premises, Doors, t00 % Windows to each of the Flat / Premises 7 sanitary fitting within the flat / premises, Electrical fitting within the flat 100 o/o / premises 8 Staircase, Lift well and Lobbies at each floor level connecting staircase 100 % and lift, Overhead and underground water tanks 9 Extemal plumbing and external plaster, elevation, completion of terrace 100 % with water proofing of the Building / Wing 10 Installation of lift, water pumps, fire fighting fitting and equipments as 100 % per CEO NOC, Electrical fitting to common areas, electro mechanical equipments, Compliance to conditions of environment/CRZ NOC, Finish to entrance lobby, Plinth protectioq Paving to areas appurtenant to building / wing, Compound wall and all other requirements as may be to obtain / Com certificate \,r-t Ar. Pahkal P. Iadhav B.Arcui. Reg. No. CAl20l41ea :ll.l Office No. 206 to 210, Roongta Sri; ,''.;,11.', Near Chandak Circle, Shrihari Kute Ma, -. Nashik - 422 0Or. Table A BAIA,l PARK "l" Building Sr. Task / Activity Percentage No. of work done 1 Excavation 100 % 2 I Number of Plinth 100 % J 0 Number Of Podiums 0 4 0 Stilt Floor 0 5 2 Number of slabs of super structure 100 o/o 6 Internal walls, Internal Plaster, Floorings within flats / premises, Doors, 100 o/o Windows to each of the Flat / Premises 7 Sanitary fitting within the flat / premises, Electrical fitting within the flat 100 % lprelmises 8 Staircase, Lift well and Lobbies at each floor level connecting staircase 100 % and lift, Overhead and underground water tanks. 9 External plumbing and extemal plaster, elevation, completion of terrace 100 % with water proofing ofthe Building / Wing 10 Installation of lift, water pumps, fire fighting fiuing and equipments as t00 % per CEO NOC, Electrical fitting to common areas, electro mechanical equipments, Compliance to conditions of environmentlCRZ NOC, Finish to entrance lobby, Plinth protection, Paving to areas appurtenant to building/ wing, Compound wall and all other requirements as may be required to obtain Occupation / Completion certificate Ar. Panfta, p. Iadhav B.Arch. Reg. No. CAl20t4l54t83 9F" {g. 206 to 210, Roongta suprurnus, Near chandakcircle, rilHil il,irHl: a Table A BALAJI PARK "J" Building Sr. Task / Activity Percentage No. of work done 1 Excavation t00 % 2 I Number of Plinth t00 % 3 0 Number Of Podiums 0 4 0 Stilt Floor 0 5 1 Number of slabs of super structure 100 o/o 6 Intemal walls, Internal Plaster, Floorings within flats / premises, Doors, 100 o/o Windows to each of the Flat / Premises 7 Sanitary fitting within the flat / premises, Electrical fitting within the flat 100 o/o premises 8 Staircase, Lift well and Lobbies at each floor level connecting staircase 100 % and lift, Overhead and underground water tanks. 9 External plumbing and external plaster, elevation, completion of terrace 100 % with water proofing of the Building / Wing 10 Installation of lift, water pumps, fire fighting fitting and equipments as 100 % per CEO NOC, Electrical frfiing to common areas, electro mechanical equipments, Compliance to conditions of environmentlCRZ NOC, Finish to entrance lobby, Plinth protection, Paving to areas appurtenant to building / wing, Compound wall and all other requirements as may be to obtain certificate or.r$\.l"$[fil Reg. No. CAl2014l5a783 Office No. 206 to 210, Roorqta Sui,r'stttus, Near Chandak Circle, Shnhari iX,rrtti: I Table A BALAJl PARK "K" Building Sr. Task / Activity Percentage No. ofwork done 1 Excavation 100 % 2 I Number of Plinth 100 % 3 0 Number Of Podiums 0 4 0 Stilt Floor 0 5 1 Number of slabs of super structure 100 o/o 6 Internal walls, Intemal Plaster, Floorings within flats / premises, Doors, 100 o/o Windows to each of the Flat / Premises 7 Sanitary fiuing within the flat / premises, Electrical fitting within the flat 100 % / premises 8 Staircase, Lift well and Lobbies at each floor level connecting staircase 100 % and lift, Overhea4 and underground water tanks. 9 External plumbing and external plaster, elevation, completion of terrace 100 % with water proofing of the Building / Wing l0 Installation of lift, water pumps, fire fighting fitting and equipments as r00 % per CEO NOC, Electrical f,rtting to common areas, electro mechanical equipments, Compliance to conditions of environmentlCRZ NOC, Finish to entrance lobby, Plinth protectiorg Paving to areas appurtenant to building / wing, Compound wall and all other requirements as may be required to obtain Occupation / Completion certificate Ar. Pankaj P. Jadhav B.Arch. Reg. No. CA12014164783 ffice No. 206 to 210, RoqEta Su;)remus, Near ctrandak circte, tl:Hil iX!"rHi: a a TABLE - B BAIAJIPARK (11 Buildings A to K) lnternal & External Development Works in Respect of the project Sr. Common areas, Propesed Percentage Details No. Facilities & Amenities (Yes / No) of work done 1 Intemal roads & No 100 % Not Applicable footpaths 2 Water supply Yes 100 % To be obtaines from NMC on completion of the project 3 Sewage (chamber Yes t00 % Will be Provided only if lines,septic tank,STP) required by NMC DC Rules 4 Storm water drains No t00 % N.A. 5 Landscaping and tree No t00 % Will be Provided only if planting required by NMC DC Rules 6 Street lights No t00 % N.A. 7 Community Buildings No 0 N.A. 8 Treatnent and disposal Yes 0 Will be Provided only if of sewage and sullage required by NMC DC water Rules 9 Solid waste management No 0 N.A. and disposal 10 Water conservation, Rnitr Yes 100 o/o Will be Provided only if water harvesting required by NMC DC Rules 11 Energy management No 0 N.A. t2 Fire protection and fire Yes 0 Will be Provided only if safety requirements required by NMC DC Rules t3 Electric meter room, Sub No 0 Indiviual Electric Meter station, Receiving station Provided after ( Completion U$\ ( \ Yours faithfully, EALCCi\J LLF' Ar. Pankaj P. fadhav B.Arch. Reg. No. CA(2014164783 Office t{o. 206 to 210, Roongta Supre6g5, M/s. Kalantri And Musale Realcpqfrfft Ep Near chandak circte, rllH iX,rrtl?: