202, Second Floor, Roongto Arcode, Opp, Kulkorni Gorden, Shoronpur Rood, Noshik422001 . Ph r 0253 - 2232575. e-moil : jodhovponkoj02@gmoil.com Ar. Ponkoj Jodhov FORM 1 ARCHITECT'S CERTIFlCATE Date:31-12-2023 To, M/s. KalantriAnd Musale Realcon LLP Shop No.2,Building No. F/10. Shreeram Kunj, Tigrania Road, Dwarka, Nashik-422011 Subject: Certificate of Percentage of Completion of Construction work BAIAJI PARK having 11 buildings named A,B,C,D, E, F, G, H, l, J & K having Maha RERA Registration Number P51600023182 being developed by M/s, KalantriAnd Musale Realcon LLP Sir, l, Ar. Pankaj Jadhav have undertaken assignment as Architect of certifying Percentage of Completion of construction work BALAJI PARK having 11 buildings named A, B, C ,D, E, F, G, H, l, J & K having Maha RERA Registration Number P51500023182 being developed by M/s. KalantriAnd Musale Realcon LLP, situated on the bearing Survey No. Gut No. 449, Village Satpur, Taluka & District Nashik. Based on Site lnspection, with respect to Layout / each of the Building/ Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the Building / Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The pe of the executed with respect to each of the activity of the entire phase is detailed Table B. Ar, Pan P. Jadhav B.Arch. Reg. No. CA12014164783 O'ffice No. 206 to 210, Roongta Supremus. Near cha ndak circre' tH3ffJ lxti. Jii,i? . a Table A BALAJI PARK "A" Building Sr. Task / Activity Percentage No. ofwork done I Excavation 100 % 2 1 Number of Plinth t00 % J 0 Number Of Podiums 0 4 0 Stilt Floor 0 5 2 Number of slabs of super structure 100 o/o 6 Internal walls, Internal Plaster, Floorings within flats / premises, Doors, 100 % Windows to each of the Flat / Premises 7 Sanitary fitting within the flat / premises, Electrical fitting within the flat r00 % / premises 8 Staircase, Lift well and Lobbies at each floor level connecting staircase 100 o/o and lift, Overhead and underground water tanks. 9 Extemal plumbing and external plaster, elevation, completion of terrace 100 % with water proofing of the Building / Wing 10 Installation of lift, water pumps, fire fighting fitting and equipments as 100 % per CEO NOC, Electrical fitting to common areas, electro mechanical equipments, Compliance to conditions of environmenUCRZ NOC, Finish to entrance lobby, Plinth protection, Paving to areas appurtenant to building / wing, Compound wall and all other requirements as may be required to obtain Occupation i Completion certificate o,.$,.rlf,L?il Reg. No. CA|2074164783 Office No. 205 to 210, Roongta Supremus, Near chandak circle, rHi;ll I1,ffii: Table A BAIAJI PARK "B" Building Sr. Task / Activity Percentage No. of work done 1 Excavation 100 % 2 I Number of Plinth t00 % 3 0 Number Of Podiums 0 4 0 Stilt Floor 0 5 2 Number of slabs of super structure 100 o/o 6 Internal walls, Internal Plaster, Floorings within flats / premises, Doors, 100 o/o Windows to each of the Flat / Premises 7 Sanitary fiuing within the flat / premises, Electrical fitting within the flat 100 % / premises 8 Staircase, Lift well and Lobbies at each floor level connecting staircase 100 % and lift, Overhead and underground water tanks. 9 External plumbing and external plaster, elevation, completion of terrace t00 % with water proofing of the Building / Wing 10 Installation of lift, water pumps, fire fighting fitting and equipments as 100 o/o per CEO NOC, Electrical fitting to common areas, electro mechanical equipments, Compliance to conditions of environmentlCRZ NOC, Finish to entrance lobby, Plinth protection, Paving to areas appurtenant to building / wing, Compound wall and all other requirements as may be required to obtain Occupation / Completion certificate \'s\ a\ Ar. Pankaj Jadhav P. B.Arch. Reg. No. CA120t4154783 ffice No. 206 to 210, Roongta Suprei'nus, Near chandak circte, rHlfll iX5rf,i?. Table A BALAJI PARK "C" Building Sr. Task / Activity Percentage No. of work done 1 Excavation 100 % 2 1 Number of Plinth rc}% J 0 Number Of Podiums 0 4 0 Stilt Floor 0 5 2 Number of slabs of super structure t00 % 6 Internal walls, Internal Plaster, Floorings within flats / premises, Doors, t00 % Windows to each of the Flat / Premises 7 Sanitary fitting within the flat / premises, Electrical fitting within the flat 100 o/o / premises 8 Staircase, Lift well and Lobbies at each floor level connecting staircase 700 o/o and lift, Overhead and underground water tanks. 9 External plumbing and extemal plaster, elevation, completion of terrace 100 % with water proofing of the Buildine / Wine 10 Installation of lift, water pumps, fire fighting fitting and equipments as 100 % per CEO NOC, Electrical fitting to common areas, electro mechanical equipments, Compliance to conditions of environment/CRZ NOC, Finish to entrance lobby, Plinth protectioq Paving to areas appurtenant to building / wing, Compound wall and all other requirements as may be required to obtain Occupation / Completion certificate Ar. $$ Plnkai P. Jadhav B.Arch. Reg. No, CAl2074 I 547 8?, office No. 206 to 210, Roongta supternus, Near Chandak Circle, Shrihari Kute Marg, Nashik - 422 00r. Table A BAIAJI PARK "D" Building Sr. Task / Activity Percentage No. of work done I Excavation 100 % 2 I Number of Plinth 100 % 3 0 Number Of Podiums 0 4 0 stilt Floor 0 5 2 Number of slabs of super structure 100 o/o 6 Intemal walls, Internal Plaster, Floorings within flats / premises, Doors, 100 % Windows to each of the Flat / Premises 7 Sanitary fitting within the flat / premises, Electrical fiuing within the flat 100 % / premises 8 Staircase, Lift well and Lobbies at each floor level connecting staircase 100 % and lift, Overhead and underground water tanks. 9 External plumbing and external plaster, elevation, completion of terrace 100 % with water proofing of the Building / Wing l0 Installation of lift, water pumps, fire fighting fitting and equipments as 100 % per CEO NOC, Electrical fitting to common areas, electro mechanical equipments, Compliance to conditions of environmentlCRZ NOC, Finish to entrance lobby, Plinth protectioq Paving to areas appurtenant to building / wing, Compound wall and all other requirements as may be required to obtain Occupation / Completion certificate \$, Ar. Pani