Sagar Shinde B.E. Civil (Govt. Contractor & Builders) Shinde Sadan, Plot No. 211 - B, D-2 Road Mahatma Nagar,Nashik - 422007 E-mail: sasa1447742(oemail.com . Ph.:9960244468 FORM-2 (See Regulation 3) ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-Project wise) Date: 22/07 /2026 To. M/s Shinde & Shinde Builders & Developers. Flat No l. Sonika Housing Society, Sharanpur Road, New Pandit Colony, Raj iv Gandhi Bhavan, Maharashtra, Nashik,422002. Subject: Certificate of Cost Incurred for Development of Reviera Tower Shaving MahaRERA Registration Number P5160002277 2 being developed by M/s Shinde & Shinde Builders & Developers. Sir, I . I, Mr. Sagar Shashikant Shinde have undertaken assignment ofcertifying Estimated Cost for Reviera Tower having MahaRERA Registration Number P51600022172 being developed by M/s Shinde & Shinde Builders & Developers 2. We have estimated the cost of civil. MEP and allied works required flor completion of the apartments and proportionate completion ofinternal & external works ofthe project as per specifi0cations mentioned in agreement of sale. our estimated cost calculations are based on the drawings/plans made available to us for the project under reference by the Developer / consultants. The schedule of items and quantity required for the entire work as calculated by _ Quantity Surveyor* appointed by Developer/Engineer, the assumption ofthe cost of material, labour and other inputs made by developer, and the site inspection carried out by us to ascertain / confirm the above analysis given to us. 3. We estimate Total Estimated Cost of completion ofthe aforesaid project under reference at Rs. 14,20,80,780.001 (Total ofTable A and B) at the time ofRegistration. The estimated qEr fQtq =rr4" ffirySeetrqr total cost of project is with reference tir the civil, MEp and allied works required for completion of the apartments and proportionate completion of intemal & extemal works, as per specifications mentioned in agreement of sale and for the purpose of obtaining occupation c€rtificate/completion ce(ificate forthe building(S) / wing(S) / Layout/ plotted Development from the Nashik Municipal corporation being the planning authority under whose jurisdiction the aforesaid project is being implemented. 4. The estimated cost Incured till date is calculated at tts 12,05,47,555,00/- (Total ofrable A and B). The amount of Estimated Cost Incurred is calculated on the basis of input materials /services used and unit cost of these items. 5. The Balance cost of completion of tire Civil, MEP and Allied works for completion of the apartments and proportionate completion ofinternal & extemal works, as per specifications mentioned in agreement ofsale, of the project is estimated at Rs. 2,15J3p25.001 (Total ofTable A and B). 6. I certify that the cost of the civil, MEP and allied work for the apartment and proportionate intemal & external works, as per specifications mentioned in agreement ofsale, ofaforesaid Project as completed on the date ofthis certificate is as given in Table A and B Below: Table A Building/Wing/Layout/Plotted Development bearing Number I or called Reviera Tower (To be prepared separately for each Building /wing/Layout/plotted Development ofthe Real Estate Projeco Sr. No. Particulars Amounts (In Rs.) I Total Estimated cost of the 14,20,80,780.00/- building/wing/Layout/Plotted Developments on date ofRegistration is 2 Cost incurred as on date 30/06/2026 12,05,47,555.00t- 3 Work done in percentage (as percentage ofthe estimated cost) 84.84% 4 Balance Cost to be lncurred**(Based on 2,15,33,225.00/- Estimated Cost) 5 Cost incurred on additional / Extra Items not NA included in the Estimated Cost (Table-C) ffiqr{fQia ffidiifreqr' Table B Internal & External Development Works in Respect of the Registered phase Sr. No. Particulars Amounts (In Rs.) I Total Estimated cost of the Intemal and 0.00/- Extemal Development works including amenities and facilities in the layout as on date of Registration is z Cost incurred as on date 30/0612026 0.00i- 3 Work done in percentage (as percentage ofthe 0% estimated cost) 4 Balance Cost to be Incuned (Based on 0.00/- Estimated Cost) 5 Cost incurred on additioial / Extra ltems not NA included in the Estimated Cost (Table-C) Yours Faithfully, Mr. Sagar Shashikant Shinde License No. Agreed and accepted by: For, M/s Shinde & Shinde Builders Signature of Promoter Name: Mr. Shashikant Shinde Partner Date: 2210712026 Note: l. The scope ofwork is to complete Itegistered Real Estate project as per Drawings approved from time to time and as per specifications mentioned in agreement ofsale. 2. (*) Quantity survey can be done by oflice of engineer or can be done by an independent Quantity Surveyor, whose certificate ofquantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by the Engineer, the name ofthe person in the office ofEngineer, who is responsible for the quantity calculated should be mentioned at the place marked (*). 3. (++) Balance cost to be incurred (4) may vary from Difference between Total estimated cost (l) and Actual cost incurred (2) due to deviation in quantity required / escalation ofcost etc. As this is an estimated cost, any deviation in quantity required for development ofthe Real Estate Project will result in amendment ofthe cost incurred/ to be incurred. 4. All components ofwork with specifications are indicative are not exhaustive. 5. Please speciS ifthere are any deviations / qualifications. Example: Any deviations in input material used from specification in agreement ofsale. Table C List ofExtra / Additional/ Deleted Items considered in cost were not part ofthe original estimated ofTotal Sr. List of Extra/ Additional/ Deleted items Amount (In Rs.) No. ffiadee#