$agan Shinde B.E. Civil (Govt. Contractor & Builders) Shinde 5adan, Plot No. 211 - B, D-2 Road Mahatma Nagar,Nashik - 422007 E-maili sasa1447742@qmail.com . ph.t9960244468 Form -2 Engineer Cedificate Dale i0.04.1024 To, SHINDE AND SHINDE FLAT NO 1,sONIKA HSG SOC, NEW PANDITCOLONY, SHARANPUR ROAD, NASHIK SUBJECTrCertificateofcostincurredforDevelopmentofRivieratowerforconstructionofA,BAND c WINGs oF THE 15T PHASE ( MAHARERA REGISTRATIoN NUMBER) sITATED oN THE PLoT EEARING SURVEY NO,65/U1A DEMARCATED BY ITS BOUNDRIES ( LATITUDE AND LONGITUDE OF THE TND PONTS) GODAPARK TO THE NORTH 24 M WIDE ROAD TO THE SOUTH SURVEY NO,66 TO THE EA5T SURVEY NO.65/2 TOTHE WEST ofDjvision NashikVi ageAnandwatiNashikTatuka, Nashik District PIN 422013 admesuring 3114.27 sqm area beingdevetoped byShindeand Shande Ref : Maharera Registation Number p51600022772. sir, lSagarS. Shinde have undertaken e5signment of certifying Estimated Cost for the Subject RealEstate Project proposed to be registered under Maharera, Being Riviera tower buildjng A,B and C wings of 1 phase situated on the plot bearing C.N.NO/CTS NO.SURVEY N0_65/1/14 OF DtVtStON NASHTK vTLLAGE aNADWALTTALUKA NASHTK DrsrRrcr prN 4zzor: lbvrmuntrue :t14.27 seM AREA BEING DEVELOPED BY SHINDE AND SHINDE 1. FOLLOWTNG TtCHNtCAL pROFESStONAtS ARE AppOtNTED 8y OWNER/pROMOTE. al M/S SANIAY R. NAtk AS ARCHTTECT b) MR, PRASHANT BACCHAV AS STRUCTURAL CONSULTANT c) M/S _AS MEp CONSUI-TANT d) M/s RoHAN SHTNDE ls eulrry suivrvon e) WE HAVE ESTTMATED THE COST OF THE COMPLETION TO OBTATN OCCUpATtoN CERTIFICATE. COMPLETION CERTIFICATE, OF THE CIVIL, MEP AND AILIED WORKS OF THE BUILDING(S) OF THE PRO.]ECT. OUR ESTIIVATED COST CATCULATIONS ARE Building/Wing bearing Number or ca ed WING C (to be prepared separatety for each Building/Wing ofthe Reat Estate project) 5r. Particulars (2) (3) (1) 1 TotalEstimated cost of the buitdin&/wing as on Rs. 3,24,54,7a7 /- 20.09-2019 date of Registration is 2 Cost incurred as on {based on the Rs.42,51,965/- Estimated cost) 3 Work done in Percentage (as percentage oi tre 73.10ya !!!!Inated cost) Balance cost to be tncurred (Based on tstimated Cost) Rs. 2,a2,02,a22/ - 5 Cost lncurred on AdditionaUExtre ttems as on Rs.0 31 03.2024 not included rn the tstimated CosL TABLE B (to be prepared for the entire registered phase ofthe ReatEstate project) Sr. Particulars t2| (3) (1) 1 TotalEstimated cost ofthe buildin&/win8 as on Rs.14,20,8o,7A0/- 20.09.2019 date of Registration is now amended on 04.03.2024 2 Cost incurred as on 30.6.2024 (based on the Estimated Rs.1 ,77 ,14,417 l - cos0 3 Work done in Percentage (as percentage ofthe 54_10% estimated cost) 4 Balance cost to be tncurred (Based on Estimated Cost) Rs.6,43,66,363/- 5 Cost lncurred on Additional/Extra ttems as on 30.6.2024 Rs.0 not included in the Estimated Cost (Annexure A) Yours Faithfully (Sagar Shashikant Shinde) Signature of Engineer Place : Nashik Date | 3OlUl2O24 We have agreed, accepted and Confirmed the above information, For M0:))!r,nd shinde yk{neil Place :Nashik Oate | 30/04/2024