SAGAR STIASHIKANT SHNDE SIIINDI] SADAN PI,OT NO 211-B,D-2 ROAD MAHATMA NAGAR, NASI I I I(-42200 7 MOB-99 60244468 FORI\l -2 ISee Regulation 3] ENGINEERS CERTIFICATE 0ater20.09.2019 To, The SHINDE AND SHNIDE FLAT NO 1, SONIKA HSG SOC, NEW PANDIT COLONY, SHARANPUR ROAD,NASHi(. Subiect : Ce rt ificate of Cost lncurred For Deve lopme nt of R IVIERA TOWE R for Const ruct ion of A,B, AND C Wingls)ofthe -1sr Phase (lvlahaRERA Registration Number)situated on the plot bearing Survey No.65/1/14 demarcated by its boundaries (latitude and loneitude of the end points) godapark to the North 24m wide road to the South survey no.66 to the East Survey no.65/2 to the West of Division Nashik Villaee Anandwali Nashik Taluka ,Nashik District ptN 422013 admeasLr.ing 3114.27 sq.mts. area being developed by Shinde and Shinde. Ref: Maha RERA Registration Number Sr, I Sagar S.Shinde have undertaken assignment of certifving Estimated Cost for the Sublect Real Eslate Project proposed to be registerd under MahaRERA ,being Riviera tower Building A,B AND C Wrngs of 1 phase sltuated on the plot Bearing C.N.No./CTS No./Survey No.65/1/1A of Div sron NASHIK V la6e ANANDWALI TALUKA NASHII( District.pin 422013 admeasuring 311:1.27 sq.mts.area being developed bv shinde and shinde. 1. Fo lowing technical professionals are appointed by Owner /promote. 11) M/s Sanjay R. Naik as Architect : (2) M/s Prashant Bacchav as Stuctural Consultant (3) M/s /Shri /Smt as lM EP Consultants. (4) M/s -Rohan Shinde - As quantity Surveyer . We have estimated the cost of the completion to obtain Occupation Certificate/Completion Certjficate, of the ClVlL, M Ep and Allied works, of the Building(s) of the project. our estimated cost ca lc[rlations, are based on the DrawinE/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and euantity for the entire work as calculated by -------- SAGAR SHASIIIKANT SHNDE SIIINDE SADAN PLOT NO 211-B,D-2 ROAD MAHATMA NACAR, NASHr K-422007 MOB -99 60244468 quantity Surveyor* appointed by Developer/Engineer, and the inspection carried out by material, labor and other inputs made by developer, and the site inspection carried out by us. . We estimate Total Estimated Cost of Completion of the building(s) of the aforesaid project under reference as Rs.11, 93, 80,818/- (TotalofTable A and B). The Estimated Total Cost of proj€ct is with reference to the Civil, MEP and allied works required to be completed for the ----------- being the planning Authority under whose jurisdiction the aforesaid project is being implanted. The Estimated cost lncurred tlll date is calculated at Rs. 0 (TotalofTable A and B) The amount of estimated Cost lncurred is calculated on the base of amount of Total Estimated Cost. The Balance cost of Completion of the Civil, IMEP a nd Allied works of the Building(s) of the subject project to obtain Occupation Certificate / Completion Certificate from nashik municipal corporation is estimated at Rs- 11,93,80,818/- (Total of table A and B). I Certify that the Cost of the Civil, MEP And Allied work for the aforesaid Project as completed on the date of this Certificate is as given in Tabl€ A and B below: . TABLE A Building/Wing bearing called WING A AND B 5r. Particulars no \2) (1) 1 Total Estirnated cost of the winC as on 20.09.2019 date of Registration is Cost incurred as on _20.09.2019(based on the Fslrmated cosl) Rs.9, Rs0 l Work done in Percentage (as Percentage of the 0% estimated cost) Balance cost to be lncurred (Based on Estimated Cost) Rs.9,62,77 ,828/- Cost lncurred on Additional/Extra ltems as on Rs.0 20.09,2019 not included in the Estimated Cost (Annexure A) SAGAR SHASHIKANT SHNDE SI]INDE SADAN PLOT NO 211.8,D-2 ROAD MAHATMA NAGAR, NASr II K-422007 MOB-99 60244468 TABLE A Building/Wing bearing called WING C Sr Particula rs 12l (3) 11) 1 rot.ifiii.ilua .*t ot tl* bl.,ild.c^vi,c o. Rs.2,31,62,990/- 15.09.2019 date of Registration is "t 2 Cost ncurred as on 20.09.2019 (based on the R s.0 Est mated cost) 3 Work done in PercentaBe (as Percentage of the estimated cost 4 Balance cost to be lncylleq llgfe! 91E!t!U!19!!9i!l Rs 2,31 ,62,9901 - 5 Cost lncurred on Additional/Extra ltems as on 20.09.2019 not included in the Estimated Cost (Annexure A) TAELE B (to be prepared for the entire registered phase of the Real Estate Project) Sr. Pa rticula rs Amou nt no \2) (3) (1) 1 Total Estlmated cost of the buildine/wine as ; Rs. 11,93,80,818/- .15.09.2019 ddte of Registration r! 2 Cosl rcr..eo as on 20.09.2019 Oased on tl^e Est mated cost) \,/ork done n Percentage (as Percentage of the 0% ated cost ) e 5t rrn 4 bd," rce cosr to be l,tcur.eo (Baseo o,1 tstt.nnted Cost) Rs. 11,93,80,818/ 5 Cost lncurred on Additiona /Extra ltems as on 20.09.2019 not included in the Estimated Cost (Annexure A) ngioeer