NASHIK MUNICIPAL CORPORATION No : LND/BP/Anandwali/DCR/1423/2019 Date : 23/07/2019 SANCTION OF BUILDING PERMISSION AND COMMENCEMENT CERTIFICATE To, Shri/Smt. Ashok Fakirrao Sope and Others Through its GPA Holder Shinde and Shinde C/o. Ar. SANJAY RAMESH NAIK & Stru.Engg. Prashant Bachhav of Nasik Sub -: Sanction of Building Permission & Commencement Certificate in Plot No .- 65/1/1A of City Survey No / Gut No.65/1/1A of Shiwar Anandwali . Ref -: 1) Your Application & Plan dated: 19 February, 2019 Inward No .NMC/TPD/Anandwali/BP/1724/2019. Sanction of Building Permission & Commencement certificate is hereby granted under section 45 & 69 of the Maharashtra Regional and Town Planning Act 1966 (Mah. of 1966) to carry out development work/and building permits under section 253 of The Bombay Provincial Municipal Corporation Act.1949 (Bombay Act, No.LIX of 1949) to erect Building for Residential Purpose as per plan duly amended in ----- subject to the following conditions. Permission Conditions 1 to 44 1. The land vacated in consequence of enforcement of the set back rule shall form part of Public Street. 2. No new building of part thereof shall be occupied or allowed to be occupied or permitted to be used by any person until occupancy permission under sec. 263 of the Maharastra Municipal Corporation Act is duly granted 3. The commencement certificate / Building permission shall remain valid for a period of one year commencing from date of its issue & thereafter it shall become invalid automatically unless otherwise renewed in stipulated period Construction work commenced after expiry of period for which commencement certificate is granted will be treated as unauthorized development & action as per provisions laid down in Maharashtra Regional & Town Planning Act 1966 & under Maharashtra Municipal Corporation Act. 1949 will be taken against such defaulter which should please be clearly noted. 4. This permission does not entitle you to develop the land which does not vest in you. 5. The date of commencement of the construction work should be intimated to this office WITHIN SEVEN DAYS. 6. Permission required under the provision of any other Act, for the time being in force shall be obtained from the concerned authorities before commencement of work [viz under Provision of Urban Land Ceiling & Regulation Act & under appropriate sections of Maharashtra Land Revenue Code 1966 efc.]. 7. After completion of plinth, certificate of planning authority to the effect that the plinth is constructed as per sanctioned plan should be taken before commencement of superstructure. 8. Building permission is granted on the strength of affidavit & indemnity bond with reference to the provisions of Urban Land [Ceiling & Regulation] Act, 1976. In case a statement made in affidavit & indemnity bond found incorrect or false the permission shall stand cancelled. 9. The balconies, ottas & varandas should not be enclosed and merged into adjoining room or rooms unless they are counted into built up area of FSI calculation as given on the building plan. It the balcony ottas & verandas are covered or merged into adjoining room the construction shall be treated as unauthorized and action shall be taken. 10. At least FIVE trees should be planted around the building in the open space of the plot. Completion certificate shall not be granted it trees are not planted in the plot as provided under section 19 of the reservation of Tree Act, 1975. 11. The drains shall be lined out & covered up properly to the satisfaction of Municipal Authorities of Nashik Page 1 of 4 No : LND/BP/Anandwali/DCR/1423/2019 Municipal Corporation.The effluent from septic tank, kitchen, bath etc. should be properly connected to Municipal drain in the nearest vicinity invert levels of the effluent of the premises should be such that the effluent gets into the Municipal drain by gravity with self cleaning velocity.In case if there is no Municipal drainage line within 30 meters premises then effluent outlet should be connected to a soak pit.The size of soak pit should be properly worked out on the basis of number of tenements, a pigeon hole circular brick wall should be constructed in the centre of the soak pit. Layers of stone boulders, stone metals and pebbles should be properly laid. 12. The construction work should be strictly carried out in accordance with the sanctioned plan enclosed herewith. 13. Copy of approved plan should be kept on site so as to facilitate the inspection of the site by Municipal Corporations staff from time to time and necessary information in respect of construction work should be furnished whenever required by the undersigned. 14. Stacking of building material debris on public road is strictly prohibited. If building material of debris is found on public road the same will be removed by the Authority and cost incurred in the removal of such material shall be recovered from the owner. 15. All the conditions should be strictly observed and breach of any of the conditions will be dealt with in accordance with the provision of Maharashtra Regional & Town Planning Act, 1966 and The Maharashtra Municipal Corporation Act. 16. Applicant should make necessary arrangement of water for construction purpose as per undertaking given. Similarly street lights will not be provided by Municipal Corporation till Electric supply Mains of M.S.E.B. is available at site. 17. There is no objection to obtain electricity connection for construction purpose from M.S.E.B. 18. Septic tank & soak pit shall be constructed as per the guidelines of sewerage department of N.M.C. & NOC shall be produced before occupation certificate. 19. Adequate space from the plot u/r should be reserved for transformer in consultation with M.S.E.D.C.L.Office before actually commencing the proposed construction. 20. Drinking water & adequate sanitation facility including toilets shall be provided for staff & labour engaged at construction site by owner/Developer at his own cost. 21. While carrying out construction work, proper care shall be taken to keep noise level within limits for various categories of zone as per rules laid down vide Government Resolution of Environment Department Dated: 21/04/2009 for Noise Pollution or as per latest revision/ Government GRs.. 22. A) Before commencing the construction on site the owner/developer shall install a "Display Board" on the conspicuous place on site indicating following details. a] Name and Address of the owner/developer, Architect/Engineer and Contractor. b] Survey Number'/City Survey Number/Ward Number of land under reference along with description of its boundaries. c] Order Number and date of grant of development permission/redevelopment permission issued by the Planning Authority or any other authority. d] F.S.I. permitted. e] Number of Residential/Commercial flats with their areas. f ] Address where copies of detailed approved plans shall be available for inspection. B) A notice in the form of an advertisement, giving all the details mentioned in 22A above, shall also be published in two widely circulated newspapers one of which should be in regional language.Failure to comply with condition 22 (A) action shall be taken by NMC. 23. Proper arrangement to be done on site for telephone facilities in consultation with Telecom Department. 24. Fly ash bricks and fly ash based and related materials shall be used in the construction of buildings. 25. Provision of rain water harvesting shall be made at site as per rule no 33 of DCPR and also as per Hon.Commissioner order No./TP/Vasi/392/2017 dt.05/6/2017 NOC shall be produced from Rain water harvesting cell in plot area more than 5000 sqm. 26. NMC shall not supply water for construction purpose. 27. This permission is given on the basis of conditions mentioned in Hon. Labour Commissioner letter No.vide letter No: Nahapra-112010/pr.No.212/kam-2 Date: 30/12/2010 From Ministry of Labour Dept. & the Conditions mentioned should be strictly observed. Page 2 of 4 No : LND/BP/Anandwali/DCR/1423/2019 28. D.P.Road widening area handover to NMC and in the name of N.M.C. 7/12 extract to be Produced before occupancy certificate.. 29. 7/12 extract of area of reservation handed over to NMC against amenity space should be produced at the time of Occupancy Certificate 30. As per DCPR Clause no 13.4.The amenity space is adjusted against the reservation of GODA PARK and such area under reservation is handed over to NMC 31. Rs.475,010/- is paid for development charges w.r.to the proposed land development.Vide vide Transaction No. : 364321352353950 Date : 12 July, 2019 32. Tree plantation shall be made as per the guidelines of Tree Officer of N.M.C. & NOC Shall be obtained before occupation certificate.Rs. 30,000/- vide Transaction No. : 364321352353950 Date : 12 July, 2019 33. Welfare Cess charges Rs., 1,325,650/- is paid vide: Transaction No. : 364321352353950 Date : 12 July, 2019 34. Provision of Grey water reuse shall be made as per rule no.34 of DCPR. 35. Arrangement of solar water heater system shall be done at site & Recycling of water system must be provided before occupancy certificate. 36. Drainage Connection Charges Rs. 63,000/ - is paid vide Transaction No. : 364321352353950 Date : 12 July, 2019 37. N.A.order No.- 347/18 dt:- 02/02/2019,submitted with the application. 38. Rs, 1,313,600/-is paid for development charges w.r.to the proposed Construction vide Transaction No. : 364321352353950 Date : 12 July, 2019 39. All safety measures & precaution shall be taken on site during construction with necessary signage/display board on site. 40. NMC Tax for Vacant plot shall be paid before Completion. 41. Temporary drainage connection shall be taken before start of work by taking permission from Public Health Department (Drainage) 42. The commencement certificate / Building permission shall remain valid for a period of one year commencing from date of its issue & thereafter it shall become invalid automatically unless otherwise renewed in stipulated period Construction work commenced after expiry of period for which commencement certificate is granted will be treated as unauthorized development & action as per provisions laid down in Maharashtra Regional & Town Planning Act 1966 & under Maharashtra Municipal Corporation Act. 1949 will be taken against such defaulter which should please be clearly noted. 43. The Building Permission is granted on the Strength of ‘LABOUR Code on occupational Safety, Health and working Conditions,2018 Therefore all the Conditions mentioned therein are applicable to this Commencement and shall be followed strictly. Nashik Municipal Corporation shall be not be responsible for breach of any Conditions mentioned therein. 44. Buildings shall be planned, designed and constructed to ensure fire safety and this shall be done in accordance with Part IV of Fire Protection of National Building Code of India and Maharashtra Fire Prevention and Life Safety Measures Act, 2006, In case of buildings identified in Regulation no.6.2.6.1., the building schemes shall also be cleared by the Fire Officer, Fire Brigade Authority. Page 3 of 4 No : LND/BP/Anandwali/DCR/1423/2019 Document certified by RAJENDRA VINAYAK AHER. Organization : NASHIK MUNICIPALCORPORATION Designation : Executive Engineer Date : 23-Jul-2019 13: 26:13 Certificate : FD330E Authority_Sign No.LND/BP/Anandwali/DCR/1423/2019 Executive Engineer (Town Planning) Nashik, Dt.23 July, 2019 Nashik Municipal Corporation Copy to : Divisional Officer Page 4 of 4