NASHIK MUNICIPAL CORPORATION NO:LNDIBPI A1)18|2024 DATE:- 31 |Q5 12021 SANCTIONOF BUILDING PERMISSION AND COMMENCEMENT CERTIFICATE TO, Viraj Estate Pvt. Ltd. Clo. Ar. Ajay Sonar .& Stru.Engg. Of Nashik. Sub : Sanction of Building Permission &Commencement Certificate onPlot No. -- of S.No.648/B2/(P) F.P.No.311 (Part)TPS-Il of Nashik Shiwar. Ref : 1) Your Application &for Building permission/ Revised Buildingpermission/ Extension of Structure Plan Dated: 30/03/2021 Inward No. A1/BPI242 2) Previous Approved buildingpermission No.A1/BP/06/2020 Dt:21/05/2020 section 45 &69 of the Maharashtra Regional and Town Planning Act 1966 (Mah. of 1966) to carry out development work/and building permission under section 253 of The Maharashtra Municipal Corporation Act (Act No.LIX of 1949) to erect building for Residential And Art Gallery &Museum (Building Permission under A.R.(Accommodation Reservation) Purpose as per plan duly arhended in subject to the.following conditions. cONDITIONSKJQ72) 1 The land vacated in conseqence of enforcament of thesettback rule shall form part of Public Street. 2 No new building of part,thereof shal.be ocoupied.or allowed to be occupied or permitted to be used by any person until,occupancy permission under. sec. 263 of the Maharastra Municipal Corporation Actis 3. The commencement cenificate Building permission shall remain valid for a period of one year commencing omidateof it lssue &thereafter it shall become invalid automatically unless otheise renewed n stipuated period Construction work commenced after expiry of perigd for which commencement certificate is granted willbe treated as. unauthorized. development &action as per provisions laid down in Maharashtra Regional. & own Planning Ac 1966&under Maharashtra Municipal Corporation Act. 1949 wil be taken against such defaulter which should please be clearly noted. 4. This permission does not entitle youto develop the larid which does not vest in you. 5. The date of commencement of th¿ cohstrudtion work should be intimated to this office WITHIN SEVEN DAYS 6. Permission required under the provision of any other Act, for the time being in force shall be obtained from the concerned authorities before commencement of work [viz under Provision of Urban Land Ceiling & Regulation Act & under appropriate sections of Maharashtra Land Revenue Code 1966.). 7. The balconies, ottas & varandas should not be enclosed and merged into adjoining room or rooms unless they are counted into built up area of FSIcalculation as given on the building plan. If the balconies, ottas & verandas are covered or merged into adjoining room the construction shall be treated as unauthorized and action shall be taken. 8 At least FIVE trees should be planted around the building in the open space of the plot. Completion certificate 'shallnot be granted if trees are not planted in the plot as provided under section 19 of the reservation of Tree Act, 1975. The drains shall be lined out &covered up properly to the satisfaction of Municipal Authorities of Nashik Municipal Corporation. The effluent from septic tank, kitchen, bath etc. should be properly connected to Municipal drain in the nearest vicinity invert levels of the eluent of the premises should be such that the effluent gets into the Municipal drain by gravity with self cleaning velocity.In case if there is no Municipal drainage line within 30 meters premises then effluent outlet should be connected toa soak pit. The size of soak pit should be properly worked out on-the basis of number of tenements, apigeon hole circular brick wall should be constructed in the centre of the soak pit. Layers of stone boulders, stone metals and pebbles should be properly laid. 10. Proper arrangement for disposal Imperial water all be made as per site requirements without distrubancy natural gradient of the land fencing to this condition is any incident happens the whole responsibilitywill be on the applicant/developers. 11. The construction work should be strictly carried out in accordance with the sanctioned plan enclosed herewith. 12. Copy of approved plan should be kept on site so as tofacilitate the inspection of the site by Municipal Corporation's staff from time to time and necessary information in respect of construction work should be furnished whenever required by the undersigned. 13. Stacking of building material debris on public road is strictly prohibited. If building material of debris is found on public road the same will be removed by the Authority and cost incurred in the removal of such materialshall be recovered from the owner. 14. Allthe conditions should be strictly observed and breach of any of the conditions will be dealt with in accordance with the provision of Máharashtra Regional & Town Planning Act, 1966 and The Maharastra Municipal Corporation Act. 15. Applicant should make necessary arrangement of water for construction purpose as per undertaking given. Similarly street lights willnot be provided by Municipal Corporation till Electric supply Mains of M.S.E.B. is available at site." 16. There is no objection to obtain electricity connection for construction purpose from M.S.E.B. 17. Septic tank & soak pit shal| be constructed as per the guidelines of sewerage department of N.M.C. &NOC shall be produced before occupation certificate. 18. Whenever necessary Adequate space from the plot. u/r are should be reserved for transformer in consultation with M.SEDc{LTOfice Before actually commencing the proposed construction. 19. Drinking water &adequate sanftation facilify including toilets shallbe provided for staff & labour engaged at constructión site by owner/Developeat his own cost. 20. While carrying out construction work, proper care, shall be taken to keep noise level within limits for various categories of zone as per rules laid down vide Government Resolution of Environment Department Dated: 21/04/2009 for Noise Pollution or as per latest revision/ Government GRs. 21. As per order of Urban Deveopment Department of Government of Maharashtra, vide TPS2417/487/pra.kra.217/UD-9 Dt:7/8/205 for all, building following condition shall apply A) Before commencing the construction on site. the owner/developer shall install a "Display Board" on the conspicuous place on site indicating following details. a Name and Addressofthe owner/developer, Architect/Engineer and Contractor. b Survey Number/City "suvey NumberWard Nümber of land under reference along with description of its boundaries Order Number and date of grant of development permission/redevelopment permission issued by th¿ Planging Authotilýorany other authority. F.S.I. permitted. e Number of Residential/Commercial flats with their areas. f1 Address where copies of detailed approved plans shall be available for inspection. B) A notice in the form of an advertisement, giving al the details mentioned in 22A above, shall also be published in two widely circulated newspapers one of which should be in regional language. Failure to comply with condition 22 (A) action shall be taken by NMC. 22. This permission is given on the basis of conditions mentioned in Hon. Labour Commissioner letter No. vide letter No: Nahapra-112010/pr.No.212/kam-2 Date: 30/12/2010 From Ministry of Labour Dept. &the Conditions mentioned should be strictly observed 23. Fly ash bricks and fly ash based and related materials shall be used in the construction of buildings. 24. Whenever necessary fanning shall be made and maintained as per provision of UDCPR on site. 25. Provision of rain water harvesting shall be made at site as per Clause no.13.3 of UDCPR 26. Building shall be planned designed and constructed to ensure fire safety and this shal be done in accordance with Part |V of Fire protection gf National Buildingg Code of India andMaharashtra Fire Prevention and Life Safety Measures Act,2006in case of building identified in Regulation no.6.2.6.1 the building schemes shallalso be cleared by the fire officer fire brigade Authority. C.C. for Plot No. --- of S.No.648/B2/(P) F.P.No.311(Part)TPS-| of Nashik Shiwar. 27 The Building permission is granted on the strength of 'LABOUR code on Safety, Health and working condition, 2018 Therefore all conditions mentionedoccupational therein are applicable to this commitment and shall be followed strictly Nashik municipal corporation shall be not responsible for breach of any condition mentioned therein. 28 As per circular No for any TPV- 4308/4102/Pra.Kra.395/08/navvi-11 Date-19/11/2008 for any arithmetical discrepancies in area statement the will be commonly responsible. applicantArchitect and Developers 29. If any discrepancies occurs/found in paid charges the the same applicant shall be liable to pay for 30 Temporary drainage connection shall be from Public Health Department (Drainage)taken before start of work by taking permission 31. All safety measures & precaution shall be taken on side during construction with necessary signage/display board on site. 32. As per solid waste management Rules- 2016 compulsory construction site should be covered withSegregation of dry & wet waste is green Net/ shde Net & in additional necessary production should be taken on reduce air pollution 33. This permission is given on the basis of N.A, order No.145/2017, Dt:06/10/2018 submitted with the application. Charges Recovery 34. Rs.15,64,800/-+85,21,320/+30,300/+51,07,930 is. paid for development charges W.r.to the proposed Construction vide R.No.JB.No.27/705,40/8561 &63/762 Dt:09/08I2019 35. &11/05/2020 & 20/05/2021. alVO Rs.1,95,600/-+7,27,100/- igpalcfor deyelopmeht charges w.r.to the proposed land development.Vide R.NoBNo:99/689Dt:09/08/2019 36. Drainage connection charges Rs.7000/-66000/- is-paid yide Dt:09/08/2021 R.NoJB.No.01/7447 37. Welfare Cess charges R.No./B.No.01/7447,40/8561Rs,1,76,000/-+/19,16,860-+12,67,800 is paid vide &66/9588 Dt:09/08I2019 &1j/05/2020 &20/05/2021 38. Rs.5000/-+14870/- R.No./B.No.3012988 Dt:09/08/2019 against Treeplantation Deposit. 39. Infrastructure Improvement Charges R.No./B.No.01/7447Dt: 09/O8/2019 Rs:21,26,280 paid vide 40. Charges for "Premium paid ESISpaid: vide Rs.284.79:360/-+6,04,600/- is paid vide R.NoJB.No.13/7446,15/8146 Dt:09)08/2019 11/05/2020 41. This Permission is given on he strength ofconditions inssued by of ministry of environment forest.& climate Newmentioned in the Delhi Vide notification No. G.S.R 317 (E) Dt:29/03/2016 & The Conditions; mentioned therein are are Commencement &shall be follaiegstriclly this-pecfFission is given applicable to thisof on the strength affidavit submitted with the proposed andg &pWaste Rs. Rs.1,19,185 /- is paid vide R.NoJB.No.66/9588 Dt:20/05/2021 Addititional Conditions 42. NMC Tax for Vacant plot shall be paid before Completion. 43. A)Total TDR Loaded 100.76 Sq.mt. which utilised from DRC No: 825 Dt:12/4/2019 vide formula 821.25X6000/48900= 100.76 Sq.mt. TDR area utilized from the same. 44. B)Total TDR Loaded 1551.84 Sq.mt. which is utilised from DRC No: 825 vide formula Dt:12/42019 12647.50X6000/48900=1551.84 Sq.mt. TDR area utilized from the same. 45. C)Total TDR Loaded 14.91 Sq.mt. which is utilised from DRC No: 800 vide formula 121.54X6000|48900 = 14.91 Sg.mt. TDR area Dt:25/01/2019 utilized from the same. 46. D)Total TDR Loaded 60.98 Sq.mt. which is utilised from DRC No: 801 vide formula 497.05X6000/48900 = 60.98 Sq.mt.TDR area utilized Dt:25/01/2019 from the same. 47. E)Total TDR Loaded 6.72 Sg.mt. which is utilised from vide formula 23.53X13970/48900 =6.72 Sq.mt. TDR areaDRC No:750A Dt:11/04/2017 utilized from the same. 48. F)Total TDR Loaded 1.36 Sq.mt. which is utilised from DRC vide formula 4.75X13970/48900 = 1.36 Sg.mt. TDR area No:750A Dt:11/04/2017 utilized from the same. 49. G)Total TDR Loaded 13.45 Sq.mt. which is utilised from DRC No:851E vide formula 107.84X6100/48900 =13.45 Sq.mt. TDR Dt:13/06/2019 area utilized from the same. 50. H)Total TDR Loaded 21.51 Sq.mt. which is utilised from DRC No:851 H vide formula 196.46X6100/48900 = 24.51 Sq.mt. TDR area utilized Dt:13/06/2019 from the same. 51. I)Total TDR Loaded 115.00 Sa.mt. which is utilised from DRC No:851 M Dt:13/06/2019 vide formula 921.88X6100/48900 =115.00 Sg.mt. TDR area utilized from the same. 52. J)Total TDR Loaded 2.79 Sg.mt. which is utilised from DRC No:851C Dt:13/06/2019 vide formula 22.40X6100/48900 = 2.79 Sq.mt. TDR area utilized from the same. 53 K)Total TDR Loaded 40.67 Sq.mt.which isutilised from DRC No:851 DDt:13/06/2019 vide formula 326.00X6100/48900 = 40.67 Sq.mt. TDR area utilized from the same. 54 This permission is given on the strength of provisional fire NOC from CFO, N.M.C. vide letter No: NMC/FIREWS/I/Resi-12/2019 Dt:15/07/2019 &conditions their in strictly followed. 55. This permission is given on the strength of provisional fire NOC from CFO, N.M.C. vide letter No: NMC/FIREWS/IWAssembly-32/2019 Dt:15/07/2019 & conditions their in strictly followed. 56. Provision of Fire Protection requirements shall be done as per appendix 'J' of DCPR & if applicable then NOC shallbe obtained from C.F.0. where the building permission is given under Rule 6.2.6.1 of DCPR. 57. The provision of facilities for differently abled persons shall be made as per rule no. 31 of DCPR 58. Artificial light and Mechanical Ventilation shall be provided for the portion where there is no adequate Natural light and Ventilation. 59. D.P Road is handed over to NMC and as the same Separate 7/12 extract of D.P Road in the name of NMC produced before occupancy-Certificate. 60. The separate 7/12 extract in the Name of NMC area shall be produced before OCcupancy certificate. 61. Installation of solar assistedwatef heating system shall be. installed as per rule no.32 of DCPR before ocupancy Permesion 62. This Permission is given on bàsis of approval Hon Comnissioner. NMC 63. Provision of Grey water. reuse shall be madelas perUDCPR claüse No.13.4.1 64. Occupancy Certificate for the Residential Building Will for issued only after obtaining occupancy Certificate for accommodation reservation building i.e Art. Gallery &Museum building and handing over the same to NMC. 65. NMC Building shall be handoverto NMC without anyencroachments. 66. NMC building work to completed under the supervision oHon, City engineer NMC Plan Design Specification agreement and drawings. 67. Plans design specification agreement and drawings for NMC Building and developer building shallcommence onlylaftenapproval.HonCity.Engineer NMC is obtained. 68. Parking area should be paved &kept openfor parking purpose only 69. Fanning shall be made and maintaiFed as per the provi_ions of DCPR on site. 70. This Permission is given as Y per'hë strength of Government Order No.TPS 1196/759/UD-9 Dt:03/01/2003 71. Previously approved building permission vide C.C.No: A1/BP/06/2020 Dt:11/05/2020 &is hereby as cancelled. 72. As per UDCPR applicant has requested to get benefit of installment for Prernium Paid (Ancillary) F.S.! the applicant has paid of Rs. Rs. 50,00,000 1- is paid vide R.No./B.No.72/9587 Dt: 20/05/2021 balance Amount Rs. 2,06,53,285/- will be paid at the time of occupancy certificate with the interest of @ 8.5%per annum as per UDCR rule no. 2.2.14., B-Option-2. Falling to this remaining payment the permission shall be treated as cancelled. Executive Engineer ATown Planning Department Nashik Municipal Corporation, Nashik. No. LND / BP /A1|19]2021 Nashik, Dt31/05 /2021 Copy to; Divisional Officer (C.C.Type)