SAGAR S. SHAH B.E.(Civil) M.l.E.,F l.v. F -27433 Cell:9422247125 E-mail : er.sagarshah@gmail.com o Approved Valuer o Consulting Engineer 54, Sahaj eevan Colony, Visemala, College Road, Nashik - 422 005 ENGINEER'S CERTIFICATE IFORM 2) Date:01.10.2019 To, MR SI]RESH VALLABHBIIAI WAMJA Flat No. 4, Sai Palace Apartment, Mahaj annagar, Ambad, Nashik 422010 Subject: Certificate of Cost Incurred for Development of GAJSIDDHI APARTMENT for Construction Work of I Building, situated on the Plot No. 1+2' bearing Survey. No 4lSllBB demarcated by its boundaries (latitude and longitude of the end points) 9.0 mtr wide road to the North, S. No. 413/1B/l Part to the South, S. No.413l2D to the East, Ptot No. 3 to the West of Division NASHIK, Village Makhmalabad, Taluka Nashik, District Nashih PIN 422003 admeasuring 427.19 Sq. Mtrs. area being developed by MR SURESH VALLABHBIIAI WAMJA. Ref: MahaRERA Registration Number Sir, I Er. Sagar S. Shah have undertaken assignment of certifoing Estimated Cost for the Subject Real Estate Project proposed to be registered under MAHARERA, being I Building situated on the Plot No. 1+2, bearing Survey. No 413/18/3 of Division NASHIK, Village Makhmalabad, Taluka Nashik, District Nashik, PIN 422003 admeasuring 427.19 Sq. Mtrs. area being developed by MR SI'RESH VALLABHBHAI WAMJA, Following technical professionals are appointed by Owner / Promoter :- (i) Ashok Narayan Jamdar as Architect/ Licensed Engineer; (ii) Er, Ashok Narayan Jamdar as Structural Consultant l. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Er. Sagar S. Shah quantity Surveyor* appointed by Developer/Engineer, and the assumption of the cost of material, labour AI d other in made by developer, and the site inspection carried out by us. s O) tonsulting vil grnttr * aluar .1. F-27133 At 4sH 2. We estimate Total Estimated Cost of completion of the GAJSIDDHI APARTMENT of the aforesaid project under reference as Rs. 1,10,75,000/- (In words One Crore Ten Lakhs Seyenty Five Thousaud Only) ( Totat ofTabte A ard B). The estimated Total Cost ofproject is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation cerlificate / completion certificate for the building from the Nashik Mu cipal Corporation being the Planning Authority under whosejurisdiction the aforesaid project is being implemented. 3. The Estimated Cost Incured till date is calculated at Rs. NIL (Total ofTable A and B). The amount of Estimated Cost Incurred is calculated on the base of amount ofTotal Estimated Cost. 4. The Balance cost of Completion ofthe Civit, MEP and Atlied works of the Building of the subject project to obtain Occupation Certificate / Completion Certificate from Nashik Municipal Corporation (ptanning Authority) is estimated at Rs. 1,10,75,0001 ( Total ofTable A and B). 5. I certii, that the Cost ofthe Civil, MEP and allied work for the aforesaid Project as completed on the date ofthis certificate is as given in Table A and B below : TABLE A Building catled GAJSIDDHI APARTMENT Sr. No. Particulars Amounts I Total Estimated cost ofthe building Rs. 1,10,75,000/- as on 01.t0.2019 date of Registration is 2 Cost incurred as on 01.10.2019 Nil (based on the Estimated cost) 3 Work done in Percentage 00/o (as Percentage ofthe estimated cost) 4 Balance Cost to be lncurred Rs. 1,10,75,000/- (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra Items as on Nil 01.10.2019 not included in the Estimated Cost (Annexure A) Z v, S s c ons$ltinq IE \neql * te d! EI F-2'1131 N AS TABLE B Building called GAJSIDDHI APARTMENT Sr. No. Particulars Amounts I Total Estimated cosl of Intemal & Extemal Nil Development Works including amenities and Facilities in the layout as on 01.10.2019 date of Registation is 2 Cost incurred as on 01.10.2019 Nil (based on the Estimated cost) 3 Work done in Percentage Nil (as Percentage ofthe estimated cost) 4 Balance Cost to be Incuned Nil (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra Items Nil as on 01.10.2019 not included in the Estimated Cost (Annexure A) ,.-::a..- Yours Faithfu j, .s t La :rr,:rir! !i lr I ER SAGAR S. SIIAH Signature of Engineer ':.::J!,ri * Note \":: ii ri'll. l. The scope ofwork is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Ocrupation Certificale /Completion Certificate. 2. As this is an estimated cost, any deviation in quantity required for development ofthe Real estate Project will result in amendmenl ofthe cost incurred/to be incurred. 3. All components ofwork with specifications are indicatiye and not exhaustive. r-i.r or p*t. i iil1iui'ou# f"rn, with cost "*""r,"dofTotal Cost) (which were not part ofthe original Estimate NIL