SAGARS. SHAH B.E.(Civil) M.l.E.,F.l.V. lell : 9422247125 F ,27433 l-mail : er.sagarshah@gmail.com o Approved Valuer o Consulting Engineer 54, Sahajeevan Colony, Visemala, College Road, Nashik - 422 OO5 ENGINEER'S CERTIFICATE (FORM 2I Date:03.12.2O2L To, Manoj Builders 341, Chintamani, Savarkar Nagar, Deolali Camp, Nashik - 42240L Subject: Certificate of Cost lncurred for Development of KUBER NAGARI APARTMENT for Construction Work of 3 Buildings named A, B and C, situated on S.No. 7618ll demarcated by its boundaries (latitude and longitude of the end points) Remaining Part of S.No. 76 to the North, 9 Meter Road to the South, S.No. 76/2 to the East, 9 Meter Road to the West of Division Nashik, Sq. Mtrs' area Village Bhagur, Taluka Nashik, District Nashik, PIN 422502 admeasuringL94T.OO being developed by Manoj Builders. Ref: MahaRERA Registration Number P51600022096' Sir, Estimated cost for the subject l, Er. Sagar s. shah have undertaken assignment of certifying Real Estate Project proposed to be registered under MAHARERA' being 3 Buildings named A' B Village Bhagur' Taluka Nashik' District and c situated on s.No. 76l8lL of Division Nashik, Mtrs. area being developed by Manoi Builders' Nashik, PIN 422502 admeasurin gL947.OOSq. 1. Following technical professionals are appointed by owner / Promoter:- (i) Mr. B. A. Mojad and Sachin Ahire as Architect & Engineers ; (ii)Mr. Abhay Borse as Structural ConsultanU rl,. 2. I have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building of the project. My estimated cost calculations are based on the Drawings / Plans made available to me for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Er. Sagar S. Shah quantity Surveyort appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by me. 3. I estimate Total Estimated cost of completion of the KUBER NAGARI APARTMENT of the aforesaid project under reference as Rs. 3,24,75,OOO1- (ln words Rupees Three Crores Twenty Four Lakhs And Seventyy Five Thousand Only) (Total of Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certlficate I completion certificate for the building from the Nashik Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost lncurred till date is calculated at Rs. L,62,3l,SOOI- (Totat of Table A and B). The amount of Estimated Cost lncurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building of the subject project to obtain Occupation Certificate / Completion Certificate from Nashik Municipal corporation (planning Authority) is estimated at Rs. L,62,37,5oo1- ffotat of Table A and B). 6. I certify that the cost of the civil, MEP and atlied work for the aforesaid project as completed on the date of this certificate is as given in Table A and B below : TABTE A KUBER NAGARI APARTMENT (3 Buildings called A, B & C) Sr. No. Particulars Amounts Total Estimated cost of the building t as on 11.12.2O2L date of Registration is Rs.3,24,75,O@l- Cost incurred as on LL.L2.IOZL 2 Rs. 1,62,37,$ffJ/- (based on the Estimated cost) Work done in Percentage 3 50% (as Percentage of the estimated cost) Balance Cost to be lncurred 4 Rs.1,62,37,5@l- (Based on Estimated Cost) Cost lncurred on Additional lExtra ltems as on tL.L2.2O2t 5 Nil not included in the Estimated Cost (Annexure A) TABTE B KUBER NAGARIAPARTMENT (3 Buildings called A, B & C) Sr. No. Particulars Amounts Total Estimated cost of lnternal & External Development 1 Works including amenities and Facilities in the layout as Nil on L1.L2.2021 date of Registration is Cost incurred as on tL.t2.2O2L Nil 2 (based on the Estimated cost) Work done in Percentage Nil 3 (as Percentage of the estimated cost) Batance Cost to be lncurred Nil 4 (Based on Estimated Cost) Cost lncurred on Additiona l/Extra ltems Nil 5 as on 11.12.2O2L not included in the Estimated Cost (Annexure A) :\,.i-. 1rl i":': t"! : ':" ?4; r". Yours Faithfully v iyi! ( i i'...a ., l. ... t:;! | .-:. ,.],i ri i1 I :9, ER. SAGAR S. SHAH Notes: 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtaan Occupation Certificate /Completion Certificate. 2. As this is an estimated cost, any deviation in quantity required for development of the Real estate Project will result in amendment of the cost incurred/to be incurred. 3. All components of work wath specifications are indicative and not exhaustive. Annexure A List of Extra / Additional ltems executed with Cost (which were not part of the original Estimate of Total Cost) Ntt