.iAC;\i{ :i, :jj-JAi-l B. E.(Civil) M.t.E.,F.t.V. Cell :9422247125 F - 27433 E-mail : er.sagarshah@gmail.com o Approved Valuer o Consulting Engineer 54, sahajeevan colony, Visemala, college Road, Nashik - 422 oo5 ENGI N EER'S CERTI FICATE (FORM 2} Date: 24.07.20L9 To, Manoj Builders 34L, Chintamani, Savarkar Nagar, Deolali Camp, Nashik.- 42240L subject: certificate of cost Incurred for Development of KUBER NAGARI APARTMENT for construction work of 3 Buildings named A, B and c, situated on S.No. 7G/g/1 demarcated by its boundaries (latitude and longitude of the end points) Remaining part of S.No. T6tothe North, g Meter Road to the South, S.No. 76/2 to the East, 9 Meter Road to the West of Division Nashik, Village Bhagur,Taluka Nashik, District Nashik, PIN 422502 admeasuring 1947.00Sq. Mtrs. area being developed by Manoj Builders. Ref: MahaRERA Registration Number Sir, l, Er' Sagar S. Shah have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MAHARERA, being 3 Buildings named A, B and C situated on S.No. 7618/L of Division Nashik, Village Bhagur, Taluka Nashik, District Nashik, PIN 422502 admeasuring 1947.oo Sq. Mtrs. area being developed by Manoj Builders. 1. Following technical professionals are appointed by Owne r / promoter: (i) Mr. B. A. Mojad and sachin Ahire as Architect & Engineers; (ii) Mr. Abhay Borse as Structural Consultant; 2. I have estimated the cost of the compf etion to obtain occupation certificate' of the civif, MEP and Allied Certificate/ completion works, of the Buirding of the project. cost cafculations are based on the My estimated Drawings /pfans made availabfe under reference by the Developer to me for the project and consultants and the schedule for the entire work as calcufated by of items and quantity Er. sagar s. shah quantity surveyor* Developer/Engineer' and the assumption appointed by of the cost oi rateriar, rabour and made by devefoper, and the site inspection other inputs carried out by me._ 3. I estimate Totaf Estimated cost of compfetion of the KUBER NAGART aforesaid project under reference A'ARTMENT of the as Rs. 3,24,75,000/- (tn words Rupees Twenty Four Lakhs And seventy Five Three crores Thousand only) (Total of Tabfe estimated Total cost of project is A and B). The with reference to the Civil, MEp and to be completed for the purpose of obtaining allied works required occupation certificate / compfetion certificate for the building from the Nashik Metroporitan Region Deveropment Nashik being the Planning Authority Authority, under'whbse jurisdiction the aforesaid impf emented. project is being 4. The Estimated Cost Incurred tilf date is cafculaied at Nf L (Totaf of Tabfe amount of Estimated Cost Incurred A and B). The is calculated on the base of amount Cost. of Total Estimated 5' The Balance cost of completion of the civif, MEp and Alf ied works of the Building subject project to obtain occupation of the certificate / Completion certificate Municipal corporation (planning Authority) from Nashik is estimafed at Rs. 3,24,75,000/- (Total Table A and B), of 6. I certify that the cost of the civif, MEp and arfied work for the aforesaid project compf eted on the date of this as certificate is as given in Tabre A and B below : TABLE A KUBER NAGARI APARTMENT (3 Buildings called A, B & C) Sr. No. Particulars Amounts rorat rsTlmareo cost ot the buildings (A,B&c) 1 as on 24.07.2019 date of Registration is Rs. 3,24,75,000/ - Cost incurred as on 24.07.201,9 2 (based on'the Estimated cost) NIL donp in percentage Work done Pornontroo (as Percentage of the estimated cost) Balance Cost to be Incurred (Based on Estimated Cost) Rs.3,24,75,000/- Cost f ncurred on Additional /Extra ltems ., on 24.07.201,9 not included in the Estimated Cost (Annexure A) TABLE B KUBER NAGARI APARTMENT (3 Buildings called A, B & C) I Sr. No. Particulars Amounts Total Estimated cost of Internar & r*.rn.ffi i' I works including amenities and Facilities in the layout as on 24.07.2019 date of Registration is Nil i'-;- Cost incurred as on 24.07.2019 -(based on the Estimated cost) Work done in Nil (as Percentage of the estimated cost) Nil Balance Cost to be Incurred 4 (Based o.n Estimated Cost) Nil Losr fncurred on Additional /Extra ltems 5 as on 24.07.2019 not included in Nil the Estimated Cost (Annexure A) ffi w $ )) Yours Faithfully \ >il^Ss \-t-_)' ER. SAGAR S. SHAH Notes: 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate /Completion Certificate. 2. As this is an estimated cost, any deviation in quantity required for development of the Real estate Project will result in amendment'of the cost incurred/to be incurred. 3. All components of work with specifications are indicative and not exhaustive. Annexure A List of Extra / Additional ltems executed with Cost (which were not part of the original Estimate of Total Cost) NIL