FORM 1 ARCH ITECT'S CERTI FICATE Date: 31.03.2023 To, M/s. Manoj Builders 34L,Chintamani, Savarkar Nagar, DeolaliCamp, Nashik 422401 Subject: Certificate of Percentage of Completion of Construction work of KUBER NAGAR! APARTMENT having MahaRERA Registration Number P51500022096 being developed by MANOJ BUILDERS. Sir, I Er. B. A. Mojad have undertaken assignment as Architect/Licensed Engineer of certifying Percentage of Completion of construction work of KUBER NAGAR! APARTMENT having MahaRERA Registration Number P51500022096 being developed by MANOJ BUtLDERS, situated at Survey No. 76/8lt Village Bhagur, Taluka Nashik, District Nashik. Based on Site lnspection, with respect to Layout / each of the Building/ Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the Building / Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in the Table B. Table A KUBER NAGARIAPARTMENT A BUILDING Sr. Tasks / Activity Percentage No. l2l Of Actual (1) Work Done (As on date of the Certificate) T Excavation 100 2 Basement (lf any) NA 3 Podiums (lf any) NA 4 Plinth 100 5 Stilt Floor 100 5 Slabs of Super Structure 100 7 lnternal Walls, lnternal Plaster, Floorings, Doors and Windows within 100 Flat / Premises 8 Sanitary Fittings within the Flat / Premises 100 9 Staircases, Lifts Wells and Lobbies at each Floor level, Overhead and 100 U nderground Water Tan ks L0 External Plumbing and External Plaster, Elevation, Completion of Terraces 100 with Waterproofing of the Building / Wing LL lnstallation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipment, Compliance to / conditions of Environment CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of areas appurtenant to Building Wing, / 100 Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Table A KUBER NAGARIAPARTMENT B BUILDING Sr. Tasks / Activity Percentage No, (2) Of Actual (1) Work Done (As on date of the Certificate) t Excavation 100 2 Basement (lf any) NA 3 Podiums (lf any) NA 4 Plinth 100 5 Stilt Floor 100 5 Slabs of Super Structure 100 7 lnternal Walls, lnternal Plaster, Floorings, Doors and Windows within 100 Flat / Premises 8 Sanitary Fittings within the Flat / Premises 100 9 Staircases, Lifts Wells and Lobbies at each Floor level, Overhead and 100 Underground Water Tanks L0 External Plumbing and External Plaster, Elevation, Completion of Terraces 100 with Waterproofing of the Building / Wing 11 lnstallation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipment, Compliance to / conditions of Environment CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of areas appurtenant to Building Wing, / 100 Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. : t/" Table A KUBER NAGARIAPARTMENT C BUILDING Sr. Tasks / Activity Percentage No. (21 Of Actual (u Work Done (As on date of the Certificate) L Excavation 100 2 Basement (lf any) NA 3 Podiums (lf any) NA 4 Plinth 100 5 Stilt Floor 100 6 Slabs of Super Structure L00 7 lnternal Walls, lnternal Plaster, Floorings, Doors and Windows within 100 Flat / Premises 8 Sanitary Fittings within the Flat / Premises 100 9 Staircases, Lifts Wells and Lobbies at each Floor level, Overhead and 100 Underground Water Tanks 10 External Plumbing and External Plaster, Elevation, Completion of Terraces 100 with Waterproofing of the Building / Wine 11 lnstallation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipment, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of areas appurtenant to Building / Wing, 100 Compound Wall and all other requirements as may be required to cornplete project as per specifications in agreement of Sale. Any other activities. I TABLE - B KUBER NAGARIAPARTMENT Percentage Proposed Of Actual Work Done Sr. No. Common Areas and Facilities Details (Yes/No) (As on date of the (1) l2l (s) (3) Certificate) (4) L lnternal Roads and Footpaths No 2 Water Supply Yes 100 Obtained 3 Sewerage (Chamber, Lines, Septic Yes 100 Septic Tank Tank, STP) Completed. 4 Storm Water Drains No 5 Landscaping and Tree Planting No 6 Street Lighting Yes 100 By NMC 7 Community Buildings No 8 Treatment and Disposal of No Sewage and Sullage Water 9 Solid Waste Management & No Disposal 10 Water Conservation / Rain Water No Harvesting 11. Energy Management No t2 Fire protection and Fire Safety No Requirements 13 Electrical Meter Room, Sub- Yes L00 Meters Taken Station, Receiving Station Yours Fa Agreed and Accepted by: .8. 4. ;i;{ [1gi11s6r ,Q"rillvej Suitding, zl!.c UeolaliOamp- 422401 l.fob 93?551G?'(i i cr'i.f1";rr'n'" 1.*" lit!r -,it a. , ER. B.A.MOJAD \ Lf9 @61 Signatu re of Promoter Architect/Licensed Engineer Name: MANOJ BUILDERS {License No.......................) Date: 31.03.2023 5 rnE( &la 4,')--3-z*tl- 0<>o+34-