B. A. MOJAD & ASSOCIATES Architect, Engineers & Gontractors Gaikwad Building, Mithai Street, Deolali Camp, Nashik. Mobile: 9325545838 ASSOCIATES E-mail :bamojad@ymail.com I Reg No. :CBD190116, NMC:05i61 FORM 1 ARCH ITECT'S CERTI FI CATE Date 03.12.2021 To, M/s. Manoj Builders 341,Chintamani, Savarkar Nagar, DeolaliCamp, Nashik 422401 Subject: Certificate of Percentage of Completion work of building name KUBER NAGAR! APARTMENT for Construction Work of 3 Building named A, B, & C situated on the Survey No. 76l8lt demarcated by its boundaries (latitude and longitude of the end points) Adj. property remaining part of S. No. 76 to the North,9.0 Mtr Road to the South, S. No. 76/2to the East,9.0 Mtr Road to the West of Division NASHIK, Village Bhagur, Taluka NASHIK, District NASHIK, PIN 422502 admeasuringLg4T.OO Sq. Mtrs. area being developed by M/s. MANOJ BUTLDERS Sr, I Ar. B.A.MOJAD have undertaken assignment as Architect of certifying Percentage of Completion of construction work of the project KUBER NAGARI APARTMENT situated on the Survey No. 76l8lt, of Division NASHIK, Village Bhagur, Taluka NASHIK, District NASHIK, PIN 422502 admeasurin gL947.OO Sq. Mtrs. area being developed by M/s. MANOJ BUILDERS 1. Following technical professionals are appointed by Owner / Promoter:- (i) B.A.MOIAD & Associates as 1.5. / Architect; (ii) Abhay Borse as Structural Consultant Based on Site lnspection, with respegt tq eEFh af the Buildings of the aforesaid Real Estate Project, I certify that as on the date of this certificate, tfte Pqrcentage of Work done for each of the buildingoftheRealEstateProjectasregisteredvidenumberP5l600022096underRERAisaSper table A herein below. The percentage of the work executed with fesPect to each of the major agtlvlty of the Building / Wing and Overall Percentage of the wgrk done with respect to each Building / Wing is detailed in the Table B. Table A KITBER NAGARI APARTMEITT A Buildlng Sr.No. Tasks / Activity Percentage L Excavation 100 2 1 number of Plinth 100 3 0 number of Podiums 0 4 Stilt Floor 0 5 2 number of Slabs of Super Structure 100 6 lnternal Walls, lnternal Plaster, Floorings within the Flat / Premises, Doors 50 and Windows to each of the Flat / Premises 7 Sanitary Fittings within the Flat / Premises, Electrical Fittings within the 0 Flat / Premises, 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 100 Staircases and Lifts, Overhead and Underground Water Tanks 9 External Plumbing and External Plaster, Elevation, Completion of Terraces 50 with Waterproofing of the Building / Wing L0 lnstallation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical Fittings to Common Areas, Electro, Mechanical Equipment, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of areas 0 appurtenant to Building / Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate. Table A KITBER NAGARI APARTMENT B Building Sr.No. Tasks / Actavity Percentage 1 Excavation 100 2 1 number of Plinth 100 3 0 number of Podiums 0 4 Stilt Floor 0 5 1 number of Slabs of Super Structure 100 6 lnternal Walls, lnternal Plaster, Floorings within the Flat / Premises, Doors 50 and Windows to each of the Flat / Premises 7 Sanitary Fittings within the Flat / Premises, Electrical Fittings within the 0 Flat / Premises, 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 100 Staircases and Lifts, Overhead and Underground Water Tanks 9 External Plumbing and External Plaster, Elevation, Completion of Terraces 50 with Waterproofing of the Building / Wing 10 lnstallation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical Fittings to Common Areas, Electro, Mechanical Equipment, Compliance to conditions of Environmenl I CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of areas 0 appurtenant to Building / Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate. Table A KITBER NAGARI APARTMENT C Building Sr.No. Tasks / Activity Percentage 1 Excavation 100 2 1 number of Plinth 100 3 0 number of Podiums 0 4 Stilt Floor 50 5 4 number of Slabs of Super Structure 100 6 lnternal Walls, lnternal Plaster, Floorings within the Flat / Premises, Doors 50 and Windows to each of the Flat / Premises 7 Sanitary Fittings within the Flat / Premises, Electrical Fittings within the 0 Flat / Premises, 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 100 Staircases and Lifts, Overhead and Underground Water Tanks 9 External Plumbing and External Plaster, Elevation, Completion of Terraces 50 with Waterproofing of the Building / Wing 10 lnstallation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical Fittings to Common Areas, Electro, Mechanical Equipment, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of areas 0 appurtenant to Building / Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate. TABLE - B I(T'BER NAGARI APARTMEITT A,B,&CBIIILDINGS lnternal & External Development Works in Respect of the project Percentage Common Roads and Facilities, Proposed Sr. No. of Work Details Amenities (Yes/No) done 1 lnternal Roads and Footpaths No 0 NA 2 Water Supply Yes 0 Willobtain from Local Body after completion 3 Sewerage (Chamber, Lines, Septic Yes 0 Septic Tank Proposed Tank, STP) 4 Storm Water Drains No 0 NA 5 Landscaping and Tree Planting No 0 NA 5 Street Lighting Yes 0 By Local Body Authority 7 Community Buildings No 0 NA 8 Treatment and Disposal of No 0 NA Sewage and Salvage Water 9 Solid Waste Management and No 0 NA Disposal t0 Water Conservation and Rain Yes 0 Rain Water Harvesting Water Harvesting Proposed 11 Energy Management No 0 NA L2 Fire protection and Fire Safety No 0 NA Requirements 13 Electrical Meter Room, Sub- Yes 0 No separate room Station, Receiving Station Yours Faithfully Architect