Bhushan Shintre 1, Gurusmruti", Ncar Uisav Garden, Nashikroad, Nashik 42210i. FORM-2 Sce Regulation 3 ENGINEER'S CERTIFICATE (To be submitied at the time of Registration of Ongoing Projcct and for withdrawal of Money from Designated Account- Project WIse) Date: 31/03/2022. To. The "Chairman, Mahurgad Co. Op. Hsg. Soc Ltd.", GPA Holder M/s. Nice Home Through Partner Mr. Nilesh Shinde & Other Two, Indunmati Partnership Firm Stop. Near Big Bazar. Nashik Road. Nashik 422101. Complex. Shop No.03, Nehru Nagar Bus Maharashtra, Subject: Certificate of Cost Incurred for Development of Re-Development of Commercial & Residential Building on the Sr.No. 11/14/1A/1/2/3/1, Plot No.18. demarcaied by its boundaries (latitude and longitude of the end points) On or towards East Adj Colony Road, On or towards W est Nala. On or towards South Plot No.19. On or towards North Colony Road & Open Space. of Nashik Division. Deolali Village, Nashik Taluka, Nashik District. admeasuring 695.00Sq Mtr. area being devcloped by Chair man, Mahurgad Co. Op. Hsg. Soc Ltd., GPA Holder M/s. Nice Home Partnership Firm Two, Through Partner Mr. Nilesh Shinde & Other Ref MahaRERA Registration Nunber P51600022034 SiT, I/We Bhushan Shintre, have undertaken assignment of certifying Estimated Cost for the Real Estate Project proposcd to be registered under MahaRERA, situated on the SubjectSr.No. 11/1A/1A/1/2/3/1, Plot No.18, of Nashik Division, Deolali Village, Nashik Taluka, Nashik District, admeasuring 695.00Sq Mtr. area being developed by "Chairman, Hsg. Soc Ltd.", GPA Holder M/s. Nice Home Partnership Firm Mahurgad Co. Op. Nilesh Shinde & Other Two, Through Partner Mr. 1. Following technical professionals are appointed by Owner/ Promoter M/s/Shri/Smt Sankhla Associates (Arch Vijay L. Patel) as L.S. Architect, M/s/Shri/Smt Reliable Consultant (Er. M/s/Shri/Snt Bhushan Shintre Sanjeev M. Patel) as Structural Consultant, asQuantity Surveyor* .We have estimated the cost of the completion to obtain Cerificate, of the Civil, MEP and Allied works, of the Occupation Certificate/ Completion Building(s) of the project. Our estimated cost Bhushan Shintre A-522364-5 B.E.(Civil eubattous ale bascd on the Dr:awiups plaiis nade iavailable to us lor the project under rcleience h the Developer and Consuliants and the Schedule ol ilems and quantity or the entire work as calculated by BhushanShintre Quantity Surveyor" appointed by Developer/Engincer. and the assuptiom of the cost of naterial, labour and olher inputs ade by devcloper, and the site camed out by us. inspection W e cstimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs.2,01,20,000/- (Total of Table A and B). The cstimated Total Cost of project is with reference to tlhe Civil, MEP and allied works required to be completed for the purpose of obtaining oceupation certitieate/completion cetificate for the building(s) from the Nashik Corporation being the Planning Authority under whose jurisdiction the aloresaid projectMunicipal is being implememed. . The Estiated Cost neurred till date is calculated at Rs.2,01,20,000/- (Total of mout of Estimated Cost lncurred is calculated on the base of Tablc A and B). The amount of Total Estimaled Cost. The Balance cost of Cor pletion of he vil. MEP and Allicd works of the Building(s) of the subjeci project to obtain Occupation Certificate/Completion Certificate from the Nashik Municipal Corporation (Planning Authority) is estimated at Rs. NIL /-(Total of Table A and B). 6 I certily that the Cost of the Civil. MEP and allied work for the aloresaid Project as completed on the date of this certilicate is as given in Table A and B below TBLEA Re-Development of Commercial & Residential Building on the Sr.No. 11/1A/1A1/2/3/1, Plot No.18 (to be preparcd separately for cach Building/Wing of the Real Estate Project) Sr. No Particulars Amounts () (2) (3) Total Estimated cost of the building/wing as Rs. 1.94.50.000/ On date of Registration is Cost incurred as on date Rs. 1,94,50,000/- (based on the Estimated cost Work donc in Percenlage 100.00 % (as Percentage of the estimatcd cost) 4 Balance Cost to be Incurred Rs. NIL (Based on Estimated Cost) Cost Incured on Additional /Extra lems as on date, Rs. NIL-. not included in the Estimated Cost (Annexure A) (Contd.)2 S h l e TABLE B Ehushan Shintre A-522364-5 B.E.(Civil) (to be prepared for the cntire registered phasc of the Rcal Estate Projeci) Sr. No Particulars Amounts (1) 2) (3) Total Estimated Cost of the Internal and Exiernal Devclopment Rs.6.70,000 Works including Amenities and Facilities in the layoul as on date of Registration is Cost incurred as on date Rs.6,70.000/-. (based on the Estimated Cost) Work done in Percentage 100,00 % (as Percentage of the Estimated Cost) Balance Cost to be Incurred Rs. NIL (based on the Estimated Cost) Cost Incured on Additional /Extra Itcms as 011 date Rs. NILi- not included in the Estimated Cost (Annexure A) Yours Faithfully. Bhushan Shintre A-5.2236erEngneer Sig (License No._ Note: 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate Completion Certificate. 2 (*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity In case of Surveyor, whose certificate of quantity calculated can be relied upon by the Engincer. the has to be mentioned at the independent quantity surveyor being appoinmcd by Developer, name office ofEngineer, the name of the place marked (*) and in case quantity are being calculated by in the office of Engineer, who is responsible for the quantity calculated should be mentioned person at the place marked (*). and machinery required to carry out entire 3. The estimated cost includes all labour. inaterial, equipment work. As this is an estimated cost, any deviation in quantity required for development of the Real Estate incurred/ to be incurred. Project will result in amend1nent of the cost All components of work with specifications are indicative and not exhaustive. 5. Annexure A List of Extra/Additional Items executed with Cost (which was not part of the original Estimate of Total Cost)