Bhushan Shintre Nashikroad, Nashik 422101. 1, 'Gurusmruti', Near Ursav Garden, FORM-2 [See Regulation 3] ENGINEER'S CERTIFICATE withdrawal of Money from (To be submitted at the time of Registration of Ongoing Project and for Designated Account- Project wise) Date: 30/09/2021. To, The "Chairman, Mahurgad Co. Op. Hsg. Soc Ltd.", GPA Holder M/s. Nice Home Partnership Firm Through Partner Mr. Nilesh Shinde & Other Two, Indumati Complex, Shop No.03, Nehru Nagar Bus Stop, Near Big Bazar. Nashik Road, Nashik 422101, Maharashtra, Subject: Certificate of Cost Incurred for Development of Re-Development of Commercial & Residential Building on the Sr.No. 11/1A/1A/1/2/3/1, Plot No.18, demarcated by its boundaries (latitude and longitude of the end points) On or towards East Adj Colony Road, On or towards West Nala, On or towards South Plot No.19, Ou or towards North Colony Road & Open Space of Nashik Division, Deolali Village, Nashik Taluka, Nashik District, admeasuring 695.00Sq Mtr. area being developed by Chairman, Mahurgad Co. Op. Hsg. Soc Ltd., GPA Holder M/s. Nice Home Partnership Firm Through Partner Mr. Nilesh Shinde & Other Two, Ref MahaRERA Registration Number P51600022034 Sir, I/ We Bhushan Shintre, have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, situated on the Sr.No. 11/1A/1A/1/2/3/1, Plot No.18, of Nashik Division, Deolali Village, Nashik Taluka, Nashik District, admeasuring 695,.00Sq Mtr. area being developed by "Chairman, Mahurgad Co. Op. Hsg. Soe Ltd.", GPA Holder M/s. Nice Home Partnership Firm Through Partner Mr. Nilesh Shinde & Other Two, 1. Following technical professionals are appointed by Owner/ Promoter M/s/Shri/Smt Sankhla Associates (Arch Vijay L. Patel) as L.S. / Architect, M/s/Shri/Smt Reliable Consultant (Er. Sanjeev M. Patel) as Structural Consultant, M/s/Shri/Smt Bhushan Shintre as Quantity Surveyor * 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost 1 2 J Bhushan Shintre A-522364-5 B.E.(CIVI reference by made available to us for the project under calculations arce based on the Drawings/plans for the entire work as and Consultants and the Schedule of items and quantity the Developer Developer/Engineer, and the Surveyor" appointed by calculated by BhushanShintre Quantity and the site inspection labour and other inputs made by developer, assumption of the cost of material. carried out by us. of the building(s) of the aforesaid project under 3. We estimate Total Estimated Cost of completion with reference as Rs.2,01,20,000/- (Total of Table A and B). The estimated Total Cost of project is completed to be for the purpose of obtaining reference to thhe Civil, MEP and allied works required from the Nashik Municipal occupation certificate/completion certificate for the building(s) the aforesaid project is being Corporation being the Planning Authority under whose jurisdiction implemented. of Table A and B). The 4 The Estimated Cost Incurred till date is calculated at Rs.1,73,80,000/- (Total amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. of the 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) from the Nashik subject project to obtain Occupation Certificate/Completion Certificate Table A and Municipal Corporation (Planning Authority) is estimated at Rs.27,40,000/-(Total of B). 6. I certify that the Cost of the Civil, MEP and allied work for the aforcsaid Project as completed on the date of this certificate is as given in Table A and B below TABLE A Re-Development of Commercial & Residential Building on the Sr.No. 11/1A/1A/1/2/3/1, Plot No.18 (to be prepared separately for each Building/Wing of the Real Estate Project) Sr. No Particulars Amounts (1) (2) (3) Total Estimated cost of the building/wing as Rs. 1,94,50,000/- On date of Registration is Cost incurred as on date Rs. 1.71.25.000/ (based on the Estimated cost) Work done in Percentage 88.04% (as Percentage of the estimated cost 4 Balance Cost to be Incurred Rs. 23,25,000/- (Based on Estimated Cost) Cost Incurred on Additional /Extra Items as on date. Rs. NIL / not included in the Estimated Cost (Annexure A) Contd.) Bhushan Shintre A-522304-5 B.E.(Civi TABLE B of the Real Estate Project) (to be prepared for tlhe entire registered phase AmountsS Sr. No Particulars (2) (3) (1) External Develop1nent Rs.6,70,000/- Total Estimated Cost of the Internal and Works including Amenities and Facilities in the layout as on date of Registration is Rs.2,55,000/- 2 Cost incurred as on date (based on the Estimated Cost) 38.06% 3 Work done in Percentage Estimated Cost) (as Percentage of the Rs.4,15,000/- Balance Cost to be Incurred (based on the Estimated Cost) Rs. NIL/, /Extra Items as on date Cost Incurred on Additional Estimated Cost (Annexure A) not included in the Yours Faithfully, Bhushan Shintre A-522364-5 B.E.(Civil Signature of Engineer. (License No. from time to as per drawings approved *Note: entire Real Estate Project work is to conplete 1. The scope of Certificate. Certificate/Completion Quantity time so as to obtain Occupation be done by an independent office of Engineer or can In case of survey can be done by be relied upon by the Engineer. 2. ) Quaniity calculated can mentioned at the whose certificate of quantity Developer, the n a m e has to be Surveyor, appointed by na 1ne of the surveyor being calculated by office of Engineer, the independent quantity are being mentioned case quantity calculated should be marked (*) and in for the quantity place who is responsible the office of Engineer, person in to carry out entire marked (*). and machinery required at the place equipment cost includes all labour, Inaterial, The estimated Real Estate 3. for development of the work. deviation in quantity required estimated cost, any to be inucurred. 4. As this is an amendnnent of the cost incurred/ exhaustive. result in indicative and not Project will specif+cations are of work with 5. 5. All components Annexure A with Cost Itens executed Total Cost) List of Extra/Additional of the original Estinmate of not part (which was