Bhushan Shintre 422101. 1, Gurusmruti', Ncar Utsav Garden, Nashikroad, Nashik FORM-2 [See Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the timne of Registration of Ongoing Project and for withdrawal of Moncy from Designated Account- Project wise) Date: 31/03/2021. To, The "Chairman, Mahurgad Co. Op. Hsg. Soc Ltd.", GPA Holder M/s. Nice Home Partncrship Firm Through Partner Mr. Nilesh Shinde & Other Two, Indumati Complex, Shop No.03, Nchru Nagar Bus Stop, Near Big Bazar, Nashik Road, Nashik 422101, Maharashtra, Subject: Certificate of Cost Incurred for Development of Re-Development of Commercial & Residential Building on the Sr.No. 11/1A/1A/1/2/3/1, Plot No.18, demarcated by its boundaries (latitude and longitude of the end points) On or towards East Adj Colony Road, On or towards West Nala, On or towards South Plot No.19 On or towards North Colony Road & Open Space, of Nashik Division, Deolali Village, Nashik Taluka, Nashik District, admeasuring 695.00Sq Mtr. area being developed by Chairman, Mahurgad Co. Op. Hsg. Soc Ltd., GPA Holder M/s. Nice Home Partnership Firm Through Partner Mr. Nilesh Shinde & Other Two. Ref MahaRERA Registration Number P51600022034 Sir, /We Bhuslhan Shintre, have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, situated on the Sr.No. 11/14/1A/1/2/3/1, Plot No.18, of Nashik Division, Deolali Village, Nashik Taluka, Nashik District, ad1measuring 695.00Sq Mtr. area beiug developed by "Chairman, Mahurgad Co. Op. Hsg. Soc Ltd.", GPA Holder M/s. Nice Home Partnership Firm Through Partner Mr. Nilesh Shinde & Other Two. 1. Following technical professionals are appointed by Owner / Promoter M/s/Shri/Smt Sankhla Associates (Arch Vijay L. Patel) as L.S. / Architect, M/s/Shri/Smt Reliable Consultant (Er. Sanjeev M. Patel) as Structural Consultant, M/s/Shri/Smt Bhushan Shintre as Quantity Surveyor 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Conmpletion Certificate. of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost available to us for the project under reference by Drawings/plans made calculations are based on the quantity for the entire work as Schedule of items and and Consultants and the and the the Developer Quantity Surveyor" appointed by Developer/Engineer, calculated by BhushanShintre labour and other imputs made by developer, and the site inspection of the cost of material, assumption carried out by us. of the aforesaid project under Cost of completion of the building(s) 3. We estimate Total Estimated Tolal Cost of project is with (Total of Table A and B). The estimated reference as Rs.2,01,20,000/- for the purpose of obtaining reference to the Civil, MEP and allied works required to be completed certificate for the building(s) from the Nashik Municipal occupation certificate/completion aforesaid project is being the Planning Authority under whose jurisdiction the Corporation being implemented. A and B). The calculated at Rs.1,22,50,000/-(Total of Table 4. The Estimated Cost Incurred till date is Total Estimated Cost. amount of Estimated Cost Incurred is calculated on the base of amount of of the MEP and Alied works of the Building(s) 5. The Balance cost of Completion of the Civil, from the Nashik Certificate/Completion Certificate subject project to obtain Occupation of Table A and Municipal Corporation (Planning Authority) is estimated at Rs.78,70,000/- (Total B). work for the aforesaid Project as completed on the 6. I certify that the Cost of the Civil, MEP and alied A and B below: date of this certificate is as given in Table TABLE A on the Sr.No. 11/1A/1A/1/2/3/1, Plot No.18 Re-Development of Commercial & Residential Building of the Real Estate Project) (to be prepared separately for each Building/Wing Particulars Amounts Sr. No (2) (3) (1) Rs. 1,94.50,000/- Total Estimated cost of the building/wing as On date of Registration is Cost incurred as on date Rs. 1.22.50.000/ 2 (based on the Estimated cost ) Work done in Percentage 62.98% (as Percentage of the estimated cost) Rs. 72,00,000/- Balance Cost to be Incurred (Based on Estimated Cost) Rs. NIL /. Cost Incurred on Additional /Extra Items as on date, not included in the Estimated Cost (Annexure A) Contd..) hushan Shintre A-522364-5 B.E.(Civi TABLE B (to be prepared for the entire registered phase of the Real Estate Project) Sr. No Particulaars Amounts (1) (2) (3) Total Estimated Cost of the Internal and External Works including Amenities and Facilities in the Development Rs.6,70,000/-. layout as on date of Registration is 2 Cost incurred as on date (based on the Estimated Cost) Rs. NIL / Work done in Percentage 0.00 (Zero)% (as Percentage of the Estimated Cost) 4 Balance Cost to be Incurred (based on the Estimated Cost) Rs.6,70,000/-. Cost Incurred on Additional /Extra Items as on date not included in thhe Estimated Cost Rs. NIL / (Annexure A) Yqurs Faithfully. Bhushan Shintre * Note: A-522364-5.B.E.(Civi Signature of Engineèr. 1. The scope of work is to License No., . time so as to obtain complete entire Real Estate Project as 2. (*) Quantity surveyOccupation Certificate/Completion per Certificate. drawings approved from time to can be done by office of Engineer or can Surveyor, whose certificate of quantity be done by an independent quantity surveyor being calculated can be relied upon by the independent Quantity place marked (*) and in case appointed by Developer, the name has toEngineer. In case of be mentioned person in the office of quantity are being calculated at the at the place marked Engineer, who is responsible for the by office of Engineer, the naine of the (*) quantity calculatad aha