NASHIK MUNICIPAL CORPORATION NOLND/BP/ C3/67/202 12021 DATE OSI oJ SANCTION OF BUILDING PERMISsION AND COMMENCEMENT CERTIFICATE TO Chairman Mahurgad Co.Op.Hsg.Soc. Ltd G.P.A.HO Other Two Partnership Firm Through Partner Mr.Nilesh S. AVay Sankhla (Patel) &Stru.EnggSanjaov Patol Of Nashik Sub 18, Sanction, of Building Permission & Certificate on Plot No:- &Commenceme Commencement of.S.No.11/1A/MAMI2/3/1 AVAW1/2/3/1 of Deolali Shiwar. of Ref 1) Your Application &for Building permission/ Revised Bu ing permission C3/RBP/473 Extension of 2) Date Previously 31/oBp0 Structure Plan/ Dated:- 30/03/2021 InwardLND/BP/RBP/C3/92/2020 approved building permission vide C.C.No: LN 2020 anon of building permission & commencement certificate is hereby grantec under section 45 & 69 of the Maharashtra Regional and Town Planning Act 190o carry out development work/and permission under section 253 of The h Maharashtra Corporation building permission Dding secio9 building for Municipal (Act No.LIX of 1949) to erect as per plan duly amended in to the entalCommerciäl following conditions. * Purpose Subject . CONDITIONS (1 to 48) 1 h e land vacated in consequence of enforcement of the set-back rule shall form part of Public Street, 2) No new building of part thereof shall be occupied or allowed to be occupied or permitted to be used by any person until occupancy permission under sec. 263 of the Maharastra Municipal CorporationAct is duly granted 3) The commencement certificate / Building permission shall remain valid for a period of one year commencing from date of its issue & thereafter it shall become invalid automatically unless otherwise rengwed in stipulated period Construction wor commenced after expiry of period for which Commencement certificate is granted will be treated as unauthorized development & action as per provisions laid down in Maharashtra Regional & Town Planning Act 1966 &under Maharashtra Municipal Corporation Act. 1949 will be taken against such defaulterwhich should please be clearly noted. 4) This permission doesnot'entitle yoúufo develpp the land which does not vest in you 5) The commencementof the construction work should be intimated to this office WITHIN SEVENDAYS 6) Permission required nder the provision of any other Act, for the time being in force shall be obtained from thefconcerned authorities before commencenment of work [viz under Provision qfUrbanand Ceiling & Regulation Act & under appropriate sections of Maharashtra Land'Revenue Code 1966.]. 7) The balconies, ottasvarandas should not be enclosed and merged into adjoining room or rooms unless they,are counted into built up area of FSI calculation as given on the building plan. If the balconies, ottas & verandas are covered or merged into adjoining room the construction shalpe.treated as unauthorized and action shall be taken 8) At least FIVE trees. shpuid be planted around the building in the open space of the plot Completion.certificata shal not be granted if trees are not planted in the plot as provided under section 19 of thej reservation of Tree Act, 1975. 9) The drains shall beined out & covered up properly to the satisfaction of Municipal Authorities of Nashiki Municipal Corporation.The effluent from septic tank, kitchen, bath etc. should be properly connected to Municipal drain in the neai st vicinity invert levels of the effluent of the premises should be such that the effluent get» into the Municipal drain within 30 by gravity with self cleanjng velocity.In case if there is no Municipal drainage line meters premises theneffiuent outlet should be connected to a soak pit.The size of soak pit should be properly worked out on-the basis of number of tenements, a pigeon hole circular brick wal should beiconstructed in the centre of the soak pit. Layers of stone boulders stone metals and pebbles should be proper laid. 10) Proper arrangement for disposal imperial water all be made as per site requirements without distrubancyhatural gradient of the land facing to this conditions if any incident happens, the whole responsibility will be on the applicant /developers plan enclosed herewith 12) Copy of approvad plan snouid be kept on site so as to facila by Municipal Corporation s staf from time to time and necessay intora ation in respecto construction work should De furnished whenever 13) Stacking of building reauired byitheunder ned. material debris on public road is prohibited. lf building a d is strictly preno material of debris is tound on public road the same will be removRGHthe Au Athority and cost incurred in the removal of such material shall be recovered 14) All the conditions should be strictly to e owner dealt with in accordance with the observed and breach ofelty0 T oWn Planing provision of Maharashtrddiónäl281 Fla Act, 1966 and The Maharashtra Municipal Corporation Act. 15) Applicant shoumake necessary arrangement of water fofcetdstruction purpoose as per undertaking give. Similarly street lights will not be Electric supply Mains of M.S.E.B. is provided.o Municipal Corpoldu available at site" 16) There is no objection to obtain electricity M.S.E.B. connection forconstruction purpoSE fra m 17) Septic tank & soak pit shall be constructed as per the of N.M.C. & NOC shall be produced quidelines of sewerage depaiu before occupation 18) whearever necessary Adequate space from the certificalte for transformer in consultation with M.S.E.D.C.L.Office plot Should be reserved proposed construction. befa? ctüallycommenCirig her spaprovided for star & 19) Drinking water& adequate sanitation facility including toiletsSelbe, labour engaged at construction site by owner/Developer at hi_wn.cost. 20) While carrying out construction work, proper care shall be takeaito keep noise level limits for various categories of zone as within per rules laid down,vlde Government Resolution of Environment Department Dated: 21/04/2009 for NoiseiPollution or as per latest revision/Government GRs. 21) As per order of Urban Development of Government of TP$2417|487/pra.kra.217/2017/UD-9Dated-7/8/2015 forMaharaslhtra,vide shall apply. alluftiolng föllowing condition A) Before commencing the construction on site the ownerldeveloper shall install a "Display Board" on the conspicuous place on site indicatingifollowing details. Name and Address of the owner/developer, Architect/Engineer and Contractor. b] Survey Nui..ber/City Survey Number/Ward Number afländ under reference along with description of its boundaries. Order Number and date of grant of developmentpermission/redevelopment permission issued by the Planning Authority or any F.S.I. permitted. othe.authority. e Number of Residential/Commercial flats with their areas Address where copies of detailed approved plans shall.be ávailable for inspection. B) A notice in the form of an advertisement, giving all etails.mentioned in 22A above, shal! aiso be published in two widely circulatècaewspapers one of which should be in regional language. Failure to comply with conchtion 22 (A) action shall be taken by NMC. 22) This permission is given on the basis of conditionsmentioned in Hon. Labour Commissioner letter No.vide letter No: Nahapra-112010/pr.No.212/kam-2 Date: 30/12/2010 From Ministry of Labour Dept. & the Conditions mentioned should be strictly observed. 23) Fly ash bricks and fly ash based and related materials shallbeUsed in the construction of buildings. 24) Whearever necessary Fanning shall be made and maintainedS perthe provisions of UDCPR on site. 25) Provision of rain water harvesting shall be made at site as perlause no 13.3 of UDCPR 26) Buildings shall planned, designed and constructed to ensurefire safety and this shall be done in accordance with Part IV of Fire Protection of National Building Code of India and Maharashtra Fire Prevention and Life Safety Measures Act, 2006, In case of buildings identified in Regulation no.2.2.8. the building schemes shall also be cleared by the Fire Officer, Fire Brigade Authority. 27) The Building Permission is granted on the Strength of "LABOUR Code on occupational Safety. Health and working Conditions,2018 Therefore all the Conditions mentioned therein are applicable to this Commencement and shall be followed strictly. Nashik Municipai Corporation shall be not be responsible for breach ofany Conditions mentioned therein. 28) As per circular No for any TPV-4308/4102/Pra.kra.359/08/navi-11, Date-19/11/2008 for any arithmetical discrepancies in area statement the applicant/Architects & Developers will be commonly responsible. 29) If any discrepancies occurs/found in paid charges the applicant shall be liable to pay for the same. 30) Temporary drainage connection shall be taken before start of work by taking permission from Public Health Department (Drainage) c.c.Forplot No:- 18,of.S.No.11/1A/1 A1/2/3/1 of Deolali Shiwar. 211 safety: measures & precaution shall be taken on All site during construction with necessary signagedisplay board on site. 32) As per solid waste. management Rule - 2016 segregation of compulsory & dry & wet waste is Construction site should be covered with Green Net/Shed Net &,in addition,necessayi precautions should be taken to reduce air pollution. 33) To Follow the Duties and Responsibilities as per Provisions in Appendix C of UDCPR Is mandatory to Engineer/structural Engineer/Supervisor/Town Planner/Licensing/Site Engineer/Geotechnical Engineer./Owner/Developer 34) This permission is given the basis of N.A.order No.- 586/1987 Dt:- 27/05/1987 submitted with thejapplication Charges Recover 35) Rs.326960+424657 600+79240+24340/-is paid for development charges w.r.to the proposed Construction Vide R.No./B.No.0699/99,14/8683 &28/766 Date 11/07/2019,24/07/2020 & 25/06/2021 36) Rs.Nil- is paid fordevelopment charges w.r.to the proposed land development. Vide RNo./B.No. Date: 37) Drainage Connection Charges Rs.34000+1500/- is paid vide R.No./B.No.31/7279 & 88/9955 Date 11/07/2019 & 25/06/2021 38) Welfare Cess charges Rs.274170+450+89875/- is paid Vide R.No./B.No.31/7279,14/8683 & 88/9955 Date 11/07/2019,24/07/2020 & 25/06/2021 39) Rs.5000/-vide RiNo./B.No.85/2981 Date .11/07/2019 against Tree plantation deposit 40) Infrastructure lmprovement Charges Rs.305800 /- is paid vide R.No./B. No.31/7279 Date 11/072019 R.No./B.No.19/7279 Date 41) Charges for"Pa mium FS" Rs.1162304/- is paid vide :11/07/2019 vide R.No./B.No.22/9954 42) Charges for "Ancillary Permium FSI" Rs.514100/- is paid Date :25/06/2021 in notification of ministry This permission is given on the basis of conditions mentioned 43) of environment.foest & climate change, New Delhi by vide No. G.S.R 317 (E) applicable to this Dt:29/03/2016 &tãe conditions mentioned therein are an on the strength of Commencementshall be following stricliy.This permission g Rs.37225/- is is waste deposit paid vide affidavit submittec with the Proposed and C & D R.No./B.No.88/9955:Date : 25/0612021 Additionalkcondiins certificiate N.A. Tax receipt Produce before Occupancy 44) Commercial NAOrder & before Occupancy be done for commercial Building 45) CCTVARangem ntsishall vide C.C.No: LND/BP/RBP/C3/92/2020 Previousaporoedbuilding permission 46) Date31/08/2020shereby as cancelled. which is utilize from DRC No 834 Dt: 13/05/2019 47) Total TDR Loaded 278.00Sq.Mt. 281.01 Sq.MtTDR area utilized from the same Vide Formula 276X13970/13820 = on the strength of redevefopment permission by DDR,Nashik 48) This permissiniigyen therin shotid bë strictly observed dt.15/04/2019.anccondition Executive Engineer Town Planning Department ,Nashik Municipal Corporation, Nashik. No. LND/BPICaFIG/202 Nashik, Dt.alo021 Copy to Divisionaloricer12CRP