5ae5 FORM 1 ARCHITECTS CERTIFICATE Date: 31.03.2022 To, Unity Buildtech 2, Saisrushti Apartment, Prashant Nagar, Pathardi Phata, Nashik 4220t0 Subject: Certificate of Percentage of Completion of Construction work of GURU GOBIND AVENUE having'MahaRERA Registration Number P51600022022 being developed by Unity Buildtech. Sir, I Er. Vijay Sanap have undertaken assignment as Architect/Licensed Engineer of certifying Percentage of Completion of construction work of GURU GOBIND AVENUE having MahaRERA Registration Number P51600022022 being developed by Unity Buildtech. Based on Site lnspection, with respect to Layout / each of the Building/ Wing of the aforesaid Rea! Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the Building / Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in the Table B. Table A GURU GOBIND AVENUE Sr. Tasks / Activity Percentage No. (2) Of Actual (u Work Done (As on date of the Certificate) L Excavation 100 100 2 Basement (lf anY) NA 3 Podiums (lf any) 100 4 Plinth 100 5 Stilt Floor 3413s, Surkan Arcade, Behind HDFC Bank, Opposite UshaHosPital,Bh ujbal Farm Road, Nashik- 422OO9 cnmlOfficP- 7R7 C ?O4nBnl N/ nhi le-9R?7O 2Ogq6 F-m a i -nffirpthrcnha mrrastt t r'nm I rln'rnrrr cohamacs I 6 Slabs of Super Structure 5ae5 100 7 lnternal Walls, lnternal Plaster, Floorings, Doors and Windows within 100 Flat / Premises 8 Sanitary Fittings within the Flat / Premises 100 9 Staircases, Lifts Wells and Lobbies at each Floor level, Overhead and 100 Underground Water Tanks 10 External Plumbing and External Plaster, Elevation, Completion of Terraces 100 with Waterproofing of the Building / Wing \L lnstallation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipment, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of areas appurtenant to Building / Wing, 100 Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE - B GURU GOBIND AVENUE Percentage Proposed Of ActualWork Done Sr. No. Common Areas and Facilities Details (Yes/No) (As on date of the (1) (2) (s) (3) Certificate) (4) 1 lnternal Roads and Footpaths No 2 Water Supply Yes 100 Obtained 3 Sewerage (Chamber, Lines, Septic Yes 100 Septic Tank Tank, STP) Completed. 4 Storm Water Drains No 5 Landscaping and Tree Planting No 5 Street Lighting Yes 100 By NMC 7 Community Buildings No 8 Treatment and DisPosal of No Sewage and Sullage Water 9 Solid Waste Management & No Disposal UshaHosPita l,Bhujbal Farm Road, Nashik- 422OO9 34/3s, surkan Arcade, Behind HDFC Bank, Opposite F-mail-offir-ed)cnha mrractt t r-orn I rnnnnrr qnhamapc romlOffir-e- 7 A7 \ ) O LORO I trzl n hi P-982) O ? O9-q l 10 Water Conservation / Rain Water Yes saeS 100 Rain Water Harvesting Harvesting Completed. TL Energy Management No 72 Fire protection and Fire Safety No Requirements L3 Electrical Meter Room, Sub- Yes 100 Meters Taken Station, Receiving Station Yours Faithful a\ En cn sffie$ a t I'i D t\ ER. VIJAY K. SANAP (License No : 992369) Agreed and Accepted by: Name: UNITY BUILDTECH PARTNER: MR. MANGESH BABURAO WAGH Date: 31.03.2022 Farm Road, Nashik- 422OO9 34/35, Surkan Arcade, Behind HDFC Bank, Opposite UshaHospital,Bhujbal F-mai I h a mrract t t cn m I t'rnnn'rz co ha m a c -offir-efdtco c cn m Off I r' i c- 7 F'7 \ ) O LOAO I tv1 o h i e-9R?? O ? Oq9,G I