Date: 25th Aug 2021 FORM 1 ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) To, Unity Buildtech, House No. 956, Near Bhujbal Farm Road, Cidco Nashik Subject: Certificate of completion of Construction Work of ‘Guru Gobind Avenue’ situated on the Plot no. 2+3, bearing Survey No./ Gut no. 895/2/1 at Nashik Shiwar, Nashik demarcated by its boundaries- adj plot no. 1 to the North, adj. plot no. 4 to the South, 9.00 m wide road to the East, adj survey no. 895/1 to 5 to the West, Tal. & District Nashik, PIN 422009 admeasuring 1240.00m² area being developed by Unity Buildtech through partner Mr. Mangesh Wagh & others. Sir, I, Er. Vijay Sanap, Nashik have undertaken assignment as Architect /Licensed Engineer of certifying Percentage of Completion of Construction Work of the ‘Guru Gobind Avenue’ situated on the Plot No. 2+3, Survey No. Gut no. 895/2/1 of Nashik Shiwar, Tal. & District Nashik, admeasuring 1040.00 m² area being developed by Unity Buildtech through partner Mr. Mangesh Wagh & others. 1. Following technical professionals are appointed by Owner / Promoter:- (i) M/s /Shri/Smt Er. Vijay Sanap as L.E. / Architect; (ii) M/s /Shri/Smt Er. Prasanna Bhore as Structural Consultant the date of this certificate, the Percentage of Work done of the above said building is as per table A herein below. CONSULTANCY | DESIGN | ENGINEERING | PROJECT MANAGEMENT 34/35, Surkan Arcade, Behind HDFC Bank, Opposite Usha Hospital,Bhujbal Farm Road, Nashik – 422009 E-mail-office@sohamvastu.com| www. sohamaes.com|Office- 7875 204080|Mobile-98220 20996 Table A Sr. No. Tasks/Activity Percentage of work done (1) (2) (3) 1 Excavation 100% 2 Plinth 100% 3 Stilt Floor 100% 4 Slabs of Super Structure 70% 5 Internal walls, Internal Plaster, Floorings within 70% Flats/Premises, Doors and Windows to each of the Flat/Premises 6 Sanitary Fittings within the Flat/Premises, Electrical 70% Fittings within the Flat/Premises 7 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and 70% Underground Water Tanks 8 The external plumbing and external plaster, elevation, completion of terraces with waterproofing 70% of the Building/Wing 9 Installation of lifts, water pumps, fire fighting, fitting and equipment as per CEO NO electrical fitting NA to common areas, electro, mechanical equipment compliance to conditions of environment CONSULTANCY | DESIGN | ENGINEERING | PROJECT MANAGEMENT 34/35, Surkan Arcade, Behind HDFC Bank, Opposite Usha Hospital,Bhujbal Farm Road, Nashik – 422009 E-mail-office@sohamvastu.com| www. sohamaes.com|Office- 7875 204080|Mobile-98220 20996 Table B Sr. Common Areas and Facilities Amenities Proposed Percentage Details No. 2 3 4 4 1 1 Internal Roads & Footpaths No 0 NA 2 Water Supply Yes 0 To be obtain from NMC 3 Sewerage (Chamber, Lines, Septic Tank , Yes 0 Chamber, STP) Lines, Septic tank 4 Storm Water Drains No 0 NA 5 Landscaping & Tree Planting Yes 0 As per NMC 6 Street Lighting No 0 NA 7 Energy management No 0 NA 8 Fire Protection And Fire Safety No 0 NA Requirements 9 Electrical Meter Room, Sub-Station, Yes 0 Receiving Station 10 Aggregate area of recreational Open Space No 0 NA 11 Open Parking Yes 0 NA 12 Community Buildings No 0 NA 13 Treatment And Disposal Of Sewage And No 0 NA Sullage Water 14 Solid Waste Management And Disposal No 0 NA Yours Faithfully, Er. Vijay K. Sanap Chartered Engineer CONSULTANCY | DESIGN | ENGINEERING | PROJECT MANAGEMENT 34/35, Surkan Arcade, Behind HDFC Bank, Opposite Usha Hospital,Bhujbal Farm Road, Nashik – 422009 E-mail-office@sohamvastu.com| www. sohamaes.com|Office- 7875 204080|Mobile-98220 20996