/\R.trM.YOGESH (jN ITOn//\trI ./\R. S TISH GN IKW/\B MS in Construction.(USA), B.Arch, IIA B.Arch, AllA Construction Manager Architect Architect, Interior Designer Lisioning Consultant +91-9689444777 +91-9373900813 +91-9405355650 ] +91-95450O3E13 G,/\IKW/\D ,/\SSOCI,,\TES REF: - DATE: / / FORM 1 ARCHITECT'S CERf,IFICATE Date: 01-10-2023 To, The POOJA DEVELOPERS PARTI{ERSHIP FIRM THROUGH PARTNER MR.KISHOR M. RI]MALE & OTI{ERS PATTIARDI FATHA, NASHII( Nashlk. Subject: Certificate of Percentage of Completion of Construction work of COMMEROAT BUIIDING having MahaRERA Registration Number (P 51600021948) being developed by POOJA DEVELOPERS PARTNERSHIP FIRM THROUGH PARTNER, MR. KISHOR M. RUMALE & OTIIERS sir, I, GAIKWAD ASSOCIATES have undertaken assignment as Architect of certiffing Percentage of Completion of construction work of FOOJA DEVELOPERS PARTNERSHIP FIRM THROUGH PARTNER MR.KISHOR M. RLIMALE & OTHERS having MahaRERA Registration Number G 5f6m@1948) being developed by POOJA DEVELOPERS PARTNERSHIP FIRM TIIROUGH PARTNER MR.KISHOR M. RIJMALE & OTIIERS , (Authorized signatory) bearing Plot No. 3+4, Survey No, 6/6/U3, Village PATHARDI , Taluka & Distict Nashik. Based on Site lnspection, with respect to Layout / each of the Building/ Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the Building / Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in the Table B. .Yogesh Gaikwad cA/2005/36580 ww,'lr.gaikwadassociates.com Emaih gaikwadassociates.in@gmail.com, Ph. 0253-2310813 Address: A-302, Third Floor, Prathamesh Plaza, Above Sony Paithani, Racca C-olony, Sharanpur Road, Nashik-5 Table A POOJA DEVELOPERS PARTNERSHIP FIRM THROUGH PARTNER MR. KISHOR M. RUMALE & OTHERS BUILDING Percentage Of Actual work Sr, Tasks / Activity Done No. (2) (As on date of the (1) Certificatel (3) 1 Excavation 100 2 Basement (lf any) 100 3 Podiums (lf any) NA 4 Plinth 100 5 Stilt Floor 00 6 Slabs of Super Structure 90 7 lnternal walls, lnternal Plaster, Floorings, Doors and Windows 75 within Flat / Premises 8 Sanitary Fittings within the Flat / Premises 60 9 Staircases, Lifts Wells and Lobbies at each Floor level, Overhead 75 and Underground Water Tanks 10 External Plumbing and External Plaster, Elevation, Completion of 50 Terraces with Waterproofing of the Buildlng / Wing 11 lnstallation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical Fittings, Mechanical Equipment, compliance to conditions of Environment / CRz NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of areas 40 appurtenant to Building / Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. Ar.Yogesh Gailovad c&200s/36580 TABLE - B POOJA DEVELOPERS PARTNERSHIP FIRM THROUGH PARTNER MR. KISHOR M. RUMALE & OTHERS PercentaBe Sr. Proposed Of Actual Work Done Common Areas and Facilities Details No. (Yes/No) (As on date of the (2) (s) (1) (3) Certificate) (4) L lnternal Roads and Footpaths No 0 NA 2 Water Supply Yes 0 Will Obtain From NMC Sewerage (Chamber, Lines, 3 Yes 100 Septic Tank Proposed Septic Tank, STP) 4 Storm Water Drains No 0 NA 5 Landscaping and Tree Planting No 0 NA 6 Street Lighting Yes 0 BY NMC 7 Community Build ings No 0 NA Treatment and Disposal of 8 No 0 NA Sewage and Su llage Water Solid Waste Management & 9 No 0 NA Disposal Water Conservation / Rain Rain Water Harvesting 10 Yes 50 Water Harvesting Proposed 11 Energy Management No 0 NA Fire protection and Fire safety 12 No 50 APPTICABLE Requirements Electrlcal Meter Room, Sub- 13 Yes 20 Room Provided Station, Receiving Station Yours Faithfully AR. YOGESH T.GAIKWAD Agreed and Accepted by: cA/200s/36s80 Signature of Promoter Name: POOJA DEVELOPERS PARTNERSHIP FIRM THROUGH PARTNER MR. KISHOR M. RUMALE & OTHERS