:ffi1 NASHIK MIUNICIPI\ L CORPORATION H NO:LND/Bpt Cll c 2sl=ol DATE :-231o€ tzozt SANCTION OF BUILDING PERMISSION AND COMMENCEMENT CERTI FICATE TO M/s. Matoshri Buildcon. C/o. Er. A.S.Wagh (Wagh Vispute Asso.)& Stru.Engg. Bhavesh J. Patel Of Nashik. Sub -: Sanction of Building Permission & Commencement Certificate on Plot No:- 11 S.No./G.No. 227128,1113 of Nashik Shiwar Nashik. Ref -: 1) Your Application & for Building permission/ Revised Building permission/ Extension of Structure Plan/ Dated:- 1210312021 lnward No. C1lBP/694. 2) Final Layout No. LNDAI/S/C11113 Dt. 1610512014. 3) Previously Approved Building permission No. LND/BP/Nashik/D CRI 449 I 20 1 i, Dt. 12t03t2019. Sanction of building permission & commencement certificate is hereby granted under section 45 & 69 of the Maharashtra Regional and Town Planning Act 1966 (tt/ah of 1966) to carry out development worUand building permission under section 253 of The Maharashtra Municipal Corporation LIX of 1949) to erect building for Residential + Commercial Pu amended in .... subject to the following conditions. DI N ) 1) The land vacated in con of the set-back rule shall form parl c,f Public Street. 2) No new building of part lowed to be occupied or permitted to be used by any pers under sec. 263 of the N,{aharastr;,; Municipal Corporation Act d 3) The commencement / Buildirtg pdrmission shiill remain valid for a perroci t,i one yea shall become invaliii autornati newed i n stipulated period Construction v,rcrlr commen certificate is granted will bn treated per provisions laid down iri [/aharashtra Regional & Town Planning Act 1966 & under Maharashtra ltflunicipal Corporation Act. 1949 will be tdJg.n against$ugh.defaulter which should please lie J clearly noted. "-r 'it"i .i',.:*"' 4) This permission does not entitle you to devdlop the land which does not vest in you. li) The commencement of the construction work should be intimated to this office WITHIN SEVEN DAYS 6) Permission required under the provision of any other Act, for the time being in force shall be obtained from the concerned authorities before commencement of work [viz under Provision of Urban Land Ceiling & Regulation Act & under appropriate sections ,::f ltlaharashtra Land Revenue Code 1966.1. 7) The balconies, ottas & varandas should not be enclosed and merged into adjoining roc,nr or rooms unless they are counted into built up area of FSI calculation as given orr tf.n: ! building plan. lf the balconies, ottas & verandas are covered or merged into adjoinrnq room the construction shall be treated as unauthorized and action shall be taken 8) At least FIVE trees should be planted around the building in the open space of the prir;i Completion cefiificate shall not be granted if trees are not planted in the plot as provider"i under section 19 of the reservation of Tree Act, 1975. 9)The drains shall be lined out & covered up properly to the satisfaction of N/unicipal Authorities of Nashik Municipal Corporation.The effluent from septic tank, kitchen, batlr etc. should be properly connected to Municipal drain in the nearest vicinity invert levele of the effluent of the premises should be such that the effluent gets into the Munioipai drain by gravity with self cleaning velocity.ln :case if there is no Municipal drainage line within 30 meters premises then effluent outlet should be connected to a soak pit.The size of soak pit should be properly worked out onthe basis of number of tenements, a pigeon hole circular brick wall should be constructed in the centre of the soak pit. Layers of stone boulders; stone metals and pebbles should be properly laid. 10) Proper arrangement for disposal imperial water all be made as per site requirements without distrubancy natural gradient of the land facing to this conditions if anv incido,.,, happens,the whole responsib.iiity will be on the applicant /dev'eiopers 1 1)The construction work should be strictly carried out in accordance with the sanctioned plan enclosed herewith. 12) Copy of approved plan should be kept on site so as to facilitate the inspection of the site by Municipal Corporation's staff from time to time and necessary information in respect of construction work should be furnished whenever required by the undersigned. 13) Stacking of building material debris on public road is strictly prohibited. lf building material of debris is found on public road the same will be removed by the Authority and cost incurred in the removal of such material shall be recovered from the owner. 14) All the conditions should be strictly observed and breach of any of the conditions will be dealt with in accordance with the provision of Maharashtra Regional & Town Planning Act, 1966 and The Maharashtra Municipal Corporation Act. 15) Applicant should make necessary arrangement of water for construction purpose as per undertaking given. Similarly street iights will not be provided by Municipal Corporation till Electric supply Mains of M.S.E.B. is available at site." 16) There is no objection to obtain electricity connection for construction purpose fronr NN.S.E.B. 17) Septic tank & soak pit shall be construcled as per the guidelines of sewerage department of N.M.C. & NOC shall be produced before occupation certificate. 18) whearever necessary Adequate space from the plot u/r should be reserved for transformer in consultation with M.S.E.D.C.L.Office before actually commencing the proposed construction, 19) Drinking water & adequate sanitation facility including toilets shall be provided for staff & labour engaged at construction site by owner/Developer at his own cost. \J 20) While carrying oult construction r care shall be taken to keep noise level within limits for various categories 'per rules laid down vide Government Resolution of Environment 1JOt4l20 09 for Noise Pollution or as per latest revisio 21) As per order of rnm Maharashtra,vide TP52417 t48 7t,8t201 all building following condition shall apply A) Before commencing the con on on site the per shall install a "Display Board" on the co following details al Name and ngineer and Contractor. bl Survey Number' land under reference along with description of its cl Order Number and permission/redevelopme nt permission issued by other authority dl F.S.l. permitted. el Number of Residential/Commerclalflats with their areas. f I Address where copies of defailed approvp"Q-plans shall be available for inspection. B) A notice in the form of an ia8vB.h:Semenii'$lvlng all the details mentioned in 22A above, shall also be published in two widely circulated newspapers one of which should be in regional language. Farlure to comply with condition 22 (A) actron shall be taken by NMC. 22; 1'his permission is given on the basis of conditions mentioned in Hon Labour Commissioner letter No.vide letter No: Nahapra-11201O/pr.No.212lkam-2 Date: 3011212010 From tVlinistry of Labour Dept. & the Conditions mentioned should be strictly observed. 23) Fly ash bricks and fly ash based and related materials shall be used in the constructionof buildings. 24) Whearever necessary Fanning shall be made and maintained as per the provisions of UDCPR on site. 25) Provision of rain water harvesting shall be made at site as per Clause no 13.3 of UDCPR 26) Buildings shall be planned, designed and constructed to ensure fire safety and this shall be done in accordance with Part lV of Fire Protection of National Building Code of lndia and Maharashtra Fire Prevention and Life Safety Measures Act, 2006, ln case of buildings identified in Regulation no.6.2.6.1., the building schemes shall also be cleared by the Fire Officer, Fire Brigade Authority. ?-7) The Building Permission is granted on the Strength of 'LABOUR Code on occupational Safety, Health and working Conditions,2018 Therefore all the Conditions mentioned therein are applicahle to this Commencement and shall be followed strictly. Nashrk Municipal Corporatiori shall be not be responsible for breach of any Conditions mentioned therein. 28) As per circular No for any TPV-43OBl41Q2lPra.kra.359/08/navi-11, Date-1911112008for any arithmetical discrepancies in area statement the applicant/Architects & Developers will be commonly responsible !I C.C.For.PlotNo:.11S.No./G.No.227t2BI1/3ofNashikShiwarNashik. the applicant shall be liable to pay for 29) tf any discrepancies occurs/found in paid charges the same. 30)Temporarydrainagegonl:ctionshallbetaken.beforestartofworkbytakino (BJ'[i3i) site durins construction with r,rui;.r'figs,1:y l";;14irT;X;l "n ", necessary srgnage/display board on site' .^^a{inn nf rtrv & 32)AspersolidwastemanagementRule-2016segreoationofdry&wetwastets Net &'itr .it" inoriJ be covered' ;ith Green Net/Shed compulsorv a'bonrtruction- ls in Appendix C of UDCPR addition,necessaryprecautions'r'o,rouutakentored'uceairpollution. :33) ro Follow tnu out1"! and Respo^#i*'"t 'X;l:^':tLnt Planner/Licensing/site mandatory to Engineer/Structural inlinee|.lsupervisoi/Town r Engi neer/G"oI"tino"l Engineer'/owner/Develope Dt:- 2511112013 260/2013 given tne basis or ru.a.oroer No. 3a) This permission L submitted with the aPPlication charqes Rgcovery ' - :--:^-^' haarina trto Nanivi/vashi/20/2021 Dated 35)AspertheorderofHon.CommissionerbearingNo.Nanivi/vashil20l2021 get benefit of installment for development appticant has reques;"; i; paid lst 12t0712021, oeretopm"itLr,"'g"' is Rs' 9'81'865/- Previously charges, nmount of rotal r'ro',ir +ir g 33547 9117 Dt' 01 /03/201 9 p.iJ ii.n"ac!io1 insta*ment of Rs. 5,01,400,- *nd instattment Rs. 4,g0,46s/-, which is 49% which is 51% of totar deveropmenl.l".g". interest of 8'5o/o percnl:' should be of totat devetopment charges & ill#le l3it c c whichever is earlier Ir at the ;;;lloil:' t:llt:"t paid within one vears liTt; 124 E(3) of Ir/I R T P Act applicantfailstopayllndinstatlments'w,:rlngspecifiedtime,thenrecoveryofthe is 1B% pJ;-flffiiati-ier sec*on instarment at the rate of aPPlicable' ,.;,,1 36)Rs.5O14OO/'ispaidf:19:::tg.,frentchargeswrtotheproposedConstructionVrde lz''di' 01'0312019' Transactio" N"' 21481 9$54zsr w'r.to the proposed land development Nil/. is paid for development ch,,g", 37.; Rs. Vide R.No.lB.No' Date vide Transaction No' 38) Drainage Connection 1 Date t 10lOBl2O21' 214819335479117 Dt' 0 on No. Rs 3e) Welfare Cess charges 214819335 479'.1'17 Dt' 01 shit2}t2O21 Dated order of Hon' 40) As Per the ent for Welfare Cess has req 121071202 1, apPlicant Charges is. Rs' 77 38501' PreviouslY Paid I st of Total Welfa re Geis charges, Am ount 01 t}3tz}lgwhich is 38% of of Transaction No' ;214g{Q335 4?gt\7 Dt. installment which is 62% of total Cess charges llnd instaliment R5. CZSOSOI-' totalWelfare should be & a ppticable interest rate of 8 5% Per annum Welfare Cess charges certificate c c whichever is earlier lf at the time of occupancy p aid within One Years recoverY of the to llnd instal lments within sPecified time' th en appl icant fails PaY section 124 E(3) of tvl R T P Act ts of 18% per annum as Per insta llment at the rate applicable. ^,,^,aqqe,,a..44.t t nst Tree 41)Rs.5,150/.videTransactionNo.214819335479117Dt.01/03/2019agatt olantation dePosit' + 3000/- p-lqj.sl" is paid vide Transaction No' Rs. 11,g-g-200/- 42) charge, tor,,pr"emium 9 ;:No;i.r'ro.'oOozt tooosa Date :'t0t08t2021' 21 48{ 933 SanitiDt. 01,03/20{ Dt' - ' cnargei is. Nilr- is p-aid vide R'No'/B'No' lmprovement 43) lnfrastructure aai c.r,rroes for,,Ancillary premirm p'"iilii; n". i6,30,810'- is vide R'No'/B'No' notification of ministrv of conditions_mentioned in lrlltu,oj::rt;;#:tJit;hsis ,& & " o"r[i'''[v-"i0" No!'-SR 317 to this (E) of environment,forest the *,-r.,t,"."0 tnerein' are appricable "ti.rt"-Jr',"r^;;,ffi L-. gi'"Igjhe strensth conditions of Dt:29/03/2016 ,iii.fry fr'S n9J1"Jti"" beJolfo*ing is paid vidr; Commencement & shall eropo="E ,no c & D waste;;;;t'i is' 73'550/' affidavit submitted with the Date : 18'08/2021' R.No.lB'No. oi'6oegr00o153 ffi9,9?^S^1fl}.whichisutilisedfromDRCNo.964.Dt.25/03i20.]1 from the sanre = iigs r 8 Sq mt' ioR area utilizect X13200/5040 vide formuta+7o.gs is t'"'-onc No: B3a 13/05/20'le Dt: the same B) Totatron uoaieJroci 99,-,1*ii.nit sq'mt iDR tl."' utilized from ",i*b gs.75 formula 100.25 X132OOI13A20 = vide I C.C.For. Plot No:- 11 S.No./G.No.227l2Bl1l3 ot Nashik Shiwar Nashik. 47) CCTV Arrangements shall be done for commercial Building before Occupancy Certificate. 48) Commercial N.A. order & N.A. Tax receipt shall be produced before occupancy certificate. 49) lnstallation of solar assisted water heating system shall be installed as per provisiorr UDCPR. 50) Fanning Road widening area handover to Ntt/C and in of to be produced before Occu pancy Certificate. 51) Previously approved building permission vide C.C.No: LNDiBP/Nashik/DCR|44912019. Dt. 1210312019 is hereby as cancelled. ;t2) BandhPatra/Affidavit regarding construction development charges submitted by applicant vide Date 0910812021. 53) NMC Tax for Vacant plot shall be paid before Completion. Engineer Planning Department Municipal Corporation, Nashik t ctlSzof zoz-L h No. LND tBP Nashik, Dl4l"8 12021 Copflo_: Divisional Officer a' 1 '-1.l (C C.Type) , ..; . .t,\. r' 'i a ..,' .'l 1! : ' .'1".,-: 1\. \ t i' :'t/ i 'l li *(i I' f.s i v