FORM.2A [MahaRERA order no. of 20181 ENGINEER,SGERTIFIGATEFoRQUALITYASSURANCE (Site suPervisor's certificate) (To be uPloaded quarterlY) To, nrub Snweta lnfrastructure & Housing (l)Pvt'Ltd' Samraat HQ/A33, Nice area ,street No'-7, Satpur MIDC , Nashik Maharastra -422007 Qualitv Assurance Gedificate (certificate no. APG-QA/OS for the quarter ending 26.03'2020 | subiect: certificate for quality of materials ,19d a$ qu?liy of construction and phase-ll"survey No.50/2 shiwar workmanship for the woik oi "samraat Apna Ghal longitude of the end Gangapur, Nashii, demarcatedbyitsboundaries(latitude and (20'0035N,73'4320E) ililtr, pioposed O"r"foptnent of Samraat Apna Ghar Phase-lll to the North,18 M WiOe Road(20'0029N 'Phase-l , 73-'4921E) to the -South'Proposed E)to the development samraat Apna Gnar s.No.4gt1t2(20',001qN. , ^7,3',4324 West of Tal' & Dist'Nashik'PlN- East, Adj. survey f'.fo- SOli (20'0035N ,73'4319E) to the 422013 admeasuring 1O3ZbSq.wtt. area being developed by M/S Shweta lnfrastructure & Housing (l) Pvt. Ltd' Reference: MahaREM Registration Number- P51 600020657 Sir, I Er.Sachin Shevade have undertaken an assignment of Supervision of this real estate Project. 1. Our ResPonsibilitY: - permission and as per the To carry out the work in accordance with the development and to carry out material approved plan and submit certificate of supervision of work and drtilg in-.it, or in the authorized laboratoryand to ensure quality of work 1. Material Testinq:- I have applied following mandatory checks on the basic materials' used in the construction. setting time, i. Gement-lt has been tested for its fineness, soun-dness, or as per other relevant ls/8s/NBC compressive strength etc. as per ls code 3sss:t986 within the permissible limits' code, or as per inO"uitry standards and its results are ii. Coarse aggregate - impact value as It has been tested, for deleterious materials, clay lumps, crushing value, p-er lS Z4gO119g6'oras per other relevant IS/BS/NBC code or as per industry standards and its results are within the permissible limits' iii. Bricksl blocks - per ls 5454:1978 They have been testbd for water absorption, crushing strength etc' as or* per other relevant |S/85/NBC code or as per industry standards and its results are within permissible limits. iv. Concrete/Ready-m ix Goncrete- It has been tested for compressive strength for various periods as per 15 456:2000 and lS 11gg or as per other relevant IS/BS/NBC codes, as per industry standards and its results are within permissible limits. v. Steel for concrete- code or as It has been tested as per lS 2062:2011 or as per other relevant IS/BS/NBc per industry standards for tensile strength, eiongation and gauge length etc' and its results are within permissible limits. vi. Testing of Other materials pipes and Other materials like sand, crushed sand, floor tiles, fixtures and ffittings, sanitary fittings (List out all items) used in this project conform relevant to IS/BS/NBC code or "t..as per standards laid down by the industry for a particular material. 2. WorkmanshiP:- further certify I hereby certify that work has been carried out under our supervision- We the work has been that woikmanirrip and quality is satisfactory and up to the mark and code of practice. acceptable within the permis.iol" tiritr of deviations as per relevant 3. Electrical Materials and workmanship: - installations Works of all the electrical wiring/connections/lift installation/other electrical have been carried out under authorized/registered electrical engineer and its records has been maintained. The materials used conform to the relevant l.S/ B'S/ National Building codes or as per industry standards' 4. Structural engineer: - Promoters has engaged structural engineer Mr.Jayant Inamdarhaving Licenses no. 165 having office no020 297024C17.- cblt no 9822035587 The structural design of buildings in this project has been done under his supervision' He has checked the soil report before laying PCC for foundation in consultation with soil consultant. The formwork and concrete mix design has been done as per ls 10262:2009 or as per other relevant codes as applicable. _His periodic checks and certificates for STABILITY and SAFETY have been kept on record. 5. Preservation of records: - Record of all test results of this project have been properly kept in the prescribed formats and witl be preserved at least up to the defect liability period or for the period as required by any other provision of law 6. Please specify materials or any other item of work which were not conforming to the standard specifications and which were not receded. Yours Faithfully, W Signature of Engineer (Site Supervisor) Name:Sachin Shevade sry1 $)e- License no.(if any)- Phone no.9552536387 Place: Nashik tffi €'qo'*