Table A Building –F –Wing F1 Percentage Sr. of work No Tasks /Activity done 1 Excavation 100 % 2 Plinth 100 % 3 Number of Podiums NA 4 Stilt Floor 100 % 5 8 number of Slabs of Super Structure 100 % Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and 6 Windows to each of the Flat/Premises 100% Sanitary Fittings within the Flat/Premises, Electrical Fittings within the 7 Flat/Premises 100 % Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases 8 and Lifts, Overhead and Underground Water Tanks 100 % The external plumbing and external plaster, elevation, completion of terraces 9 with waterproofing of the Building/Wing, 100 % Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing 10 to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100 % Table A Building –F –Wing F2 Percentage Sr. of work No Tasks /Activity done 1 Excavation 100% 2 Plinth 100 % 3 Number of Podiums NA 4 Stilt Floor 100 % 5 8 number of Slabs of Super Structure 100% Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and 6 Windows to each of the Flat/Premises 100 % Sanitary Fittings within the Flat/Premises, Electrical Fittings within the 7 Flat/Premises 100 % Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases 8 and Lifts, Overhead and Underground Water Tanks 100 % The external plumbing and external plaster, elevation, completion of terraces 9 with waterproofing of the Building/Wing, 100 % Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing 10 to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100% Table A Building –G –Wing G1 Percentage Sr. of work No Tasks /Activity done 1 Excavation 100 % 2 Plinth 100 % 3 Number of Podiums NA 4 Stilt Floor 100 % 5 8 number of Slabs of Super Structure 100% Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and 6 Windows to each of the Flat/Premises 20% Sanitary Fittings within the Flat/Premises, Electrical Fittings within the 7 Flat/Premises 0% Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases 8 and Lifts, Overhead and Underground Water Tanks 15 % The external plumbing and external plaster, elevation, completion of terraces 9 with waterproofing of the Building/Wing, 0% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing 10 to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0% Table A Building –G –Wing G2 Percentage Sr. of work No Tasks /Activity done 1 Excavation 100 % 2 Plinth 100 % 3 Number of Podiums NA 4 Stilt Floor 100 % 5 8 number of Slabs of Super Structure 100 % Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and 6 Windows to each of the Flat/Premises 20 % Sanitary Fittings within the Flat/Premises, Electrical Fittings within the 7 Flat/Premises 00 % Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases 8 and Lifts, Overhead and Underground Water Tanks 15 % The external plumbing and external plaster, elevation, completion of terraces 9 with waterproofing of the Building/Wing, 00 % Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing 10 to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00% Table A Building –G –Wing G3 Percentage Sr. of work No Tasks /Activity done 1 Excavation 100 % 2 Plinth 100 % 3 Number of Podiums NA 4 Stilt Floor 100 % 5 8 number of Slabs of Super Structure 100 % Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and 6 Windows to each of the Flat/Premises 50 % Sanitary Fittings within the Flat/Premises, Electrical Fittings within the 7 Flat/Premises 30% Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases 8 and Lifts, Overhead and Underground Water Tanks 15 % The external plumbing and external plaster, elevation, completion of terraces 9 with waterproofing of the Building/Wing, 00 % Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing 10 to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00% Table A Building –G –Wing G4 Percentage Sr. of work No Tasks /Activity done 1 Excavation 100 % 2 Plinth 100 % 3 Number of Podiums NA 4 Stilt Floor 100 % 5 8 number of Slabs of Super Structure 100% Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and 6 Windows to each of the Flat/Premises 60 % Sanitary Fittings within the Flat/Premises, Electrical Fittings within the 7 Flat/Premises 20 % Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases 8 and Lifts, Overhead and Underground Water Tanks 30 % The external plumbing and external plaster, elevation, completion of terraces 9 with waterproofing of the Building/Wing, 00 % Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing 10 to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00% Table A Building –H –Wing H1 Percentage Sr. of work No Tasks /Activity done 1 Excavation 100 % 2 Plinth 100 % 3 Number of Podiums NA 4 Stilt Floor 00 % 5 8 number of Slabs of Super Structure 00 % Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and 6 Windows to each of the Flat/Premises 00 % Sanitary Fittings within the Flat/Premises, Electrical Fittings within the 7 Flat/Premises 00 % Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases 8 and Lifts, Overhead and Underground Water Tanks 00 % The external plumbing and external plaster, elevation, completion of terraces 9 with waterproofing of the Building/Wing, 00 % Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing 10 to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00% Table A Building –H –Wing H2 Percentage Sr. of work No Tasks /Activity done 1 Excavation 100 % 2 Plinth 100 % 3 Number of Podiums NA 4 Stilt Floor 00 % 5 8 number of Slabs of Super Structure 00 % Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and 6 Windows to each of the Flat/Premises 00 % Sanitary Fittings within the Flat/Premises, Electrical Fittings within the 7 Flat/Premises 00 % Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases 8 and Lifts, Overhead and Underground Water Tanks 00 % The external plumbing and external plaster, elevation, completion of terraces 9 with waterproofing of the Building/Wing, 00 % Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing 10 to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00% Table A Building –H –Wing H3 Percentage Sr. of work No Tasks /Activity done 1 Excavation 100 % 2 Plinth 100 % 3 Number of Podiums NA 4 Stilt Floor 00 % 5 8 number of Slabs of Super Structure 00 % Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and 6 Windows to each of the Flat/Premises 00 % Sanitary Fittings within the Flat/Premises, Electrical Fittings within the 7 Flat/Premises 00 % Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases 8 and Lifts, Overhead and Underground Water Tanks 00 % The external plumbing and external plaster, elevation, completion of terraces 9 with waterproofing of the Building/Wing, 00 % Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing 10 to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00 % Table A Building –H –Wing H4 Percentage Sr. of work No Tasks /Activity done 1 Excavation 100 % 2 Plinth 100 % 3 Number of Podiums NA 4 Stilt Floor 00 % 5 8 number of Slabs of Super Structure 00 % Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and 6 Windows to each of the Flat/Premises 00 % Sanitary Fittings within the Flat/Premises, Electrical Fittings within the 7 Flat/Premises 00 % Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases 8 and Lifts, Overhead and Underground Water Tanks 00 % The external plumbing and external plaster, elevation, completion of terraces 9 with waterproofing of the Building/Wing, 00% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing 10 to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00% Table A Building –H –Wing H5 Percentage Sr. of work No Tasks /Activity done 1 Excavation 100 % 2 Plinth 50% 3 Number of Podiums NA 4 Stilt Floor 00 % 5 8 number of Slabs of Super Structure 00 % Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and 6 Windows to each of the Flat/Premises 00 % Sanitary Fittings within the Flat/Premises, Electrical Fittings within the 7 Flat/Premises 00 % Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases 8 and Lifts, Overhead and Underground Water Tanks 00 % The external plumbing and external plaster, elevation, completion of terraces 9 with waterproofing of the Building/Wing, 00 % Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing 10 to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00 % TABLE-B Internal & External Development Works in Respect of the entire Registered Phase Sr. Proposed Percentage No Common areas and Facilities, Amenities (Yes/No) of Work done Details Internal Paved 1 Internal Roads & Footpaths Yes 50% Driveways 50% To be obtain 2 Water Supply Yes from NMC Sewerage (chamber, lines, Septic Tank, 50% Proposed 3 STP) Yes 4 Storm Water Drains Yes 50% Proposed 5 Landscaping & Tree planting Yes 00 % Proposed 6 Street Lighting Yes 50% Proposed 80 % Substation Electrical meter room, sub-station, receiving complete, 7 station Yes Proposed 0% Proposed 8 Aggregate area of recreational open space Yes Garden 9 Open Parking No 0% NA 100 % Club & 10 Community Buildings Yes Gymnasium Treatment and disposal of sewage and 75% 11 sullage water Yes STP proposed 0% NMC 12 Solid Waste management & Disposal Yes Ghantagadi 50% Rain water 13 Water conservation, Rain water harvesting Yes Harvesting