Table A Building –F –Wing F1 Percentage Sr. of work No Tasks /Activity done 1 Excavation 100 % 2 Plinth 100 % 3 number of Podiums N.A. 4 Stilt Floor 100 % 5 8 number of Slabs of Super Structure 100 % Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows 100 % 6 to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/Premises 100 % Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, 8 Overhead and Underground Water Tanks 100 % The external plumbing and external plaster, elevation, completion of terraces with 9 waterproofing of the Building/Wing, 100 % Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance 10 lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100% 2 Table A Building –F –Wing F2 Percentage Sr. of work No Tasks /Activity done 1 Excavation 100 % 2 Plinth 100 % 3 number of Podiums 0% 4 Stilt Floor 100 % 5 8 number of Slabs of Super Structure 100 % Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows 100 % 6 to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/Premises 100 % Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, 8 Overhead and Underground Water Tanks 100 % The external plumbing and external plaster, elevation, completion of terraces with 9 waterproofing of the Building/Wing, 100 % Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance 10 lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100 % 3 Table A Building –G –Wing G1 Percentage Sr. of work No Tasks /Activity done 1 Excavation 100 % 2 Plinth 100 % 3 number of Podiums 0% 4 Stilt Floor 100 % 5 8 number of Slabs of Super Structure 35% Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows 0% 6 to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/Premises 0% Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, 8 Overhead and Underground Water Tanks 0% The external plumbing and external plaster, elevation, completion of terraces with 9 waterproofing of the Building/Wing, 0% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance 10 lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0% 4 Table A Building –G –Wing G2 Percentage Sr. of work No Tasks /Activity done 1 Excavation 100 % 2 Plinth 100 % 3 number of Podiums 0% 4 Stilt Floor 100 % 5 8 number of Slabs of Super Structure 40 % Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows 0% 6 to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/Premises 0% Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, 8 Overhead and Underground Water Tanks 0% The external plumbing and external plaster, elevation, completion of terraces with 9 waterproofing of the Building/Wing, 0% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance 10 lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0% 5 Table A Building –G –Wing G-3 Percentage Sr. of work No Tasks /Activity done 1 Excavation 100 % 2 Plinth 100 % 3 number of Podiums 0% 4 Stilt Floor 100 % 5 8 number of Slabs of Super Structure 95 % Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows 10 % 6 to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/Premises 5% Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, 8 Overhead and Underground Water Tanks 0% The external plumbing and external plaster, elevation, completion of terraces with 9 waterproofing of the Building/Wing, 0% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance 10 lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0% 6 Table A Building-G - Wing G-4 Percentage Sr. of work No Tasks /Activity done 1 Excavation 100 % 2 Plinth 100 % 3 number of Podiums 0% 4 Stilt Floor 100 % 5 8 number of Slabs of Super Structure 95% Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows 10 % 6 to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/Premises 0% Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, 8 Overhead and Underground Water Tanks 0% The external plumbing and external plaster, elevation, completion of terraces with 9 waterproofing of the Building/Wing, 0% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance 10 lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0% 7 Table A Building-H - Wing H-1 Percentage Sr. of work No Tasks /Activity done 1 Excavation 60 % 2 Plinth 0% 3 number of Podiums 0% 4 Stilt Floor 0% 5 8 number of Slabs of Super Structure 0% Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows 0% 6 to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/Premises 0% Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, 8 Overhead and Underground Water Tanks 0% The external plumbing and external plaster, elevation, completion of terraces with 9 waterproofing of the Building/Wing, 0% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance 10 lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0% 8 Table A Building-H - Wing H-2 Percentage Sr. of work No Tasks /Activity done 1 Excavation 0% 2 Plinth 0% 3 number of Podiums 0% 4 Stilt Floor 0% 5 8 number of Slabs of Super Structure 0% Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows 0% 6 to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/Premises 0% Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, 8 Overhead and Underground Water Tanks 0% The external plumbing and external plaster, elevation, completion of terraces with 9 waterproofing of the Building/Wing, 0% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance 10 lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0% 9 Table A Building-H - Wing H-3 Percentage Sr. of work No Tasks /Activity done 1 Excavation 100 % 2 Plinth 50 % 3 number of Podiums 0% 4 Stilt Floor 0% 5 8 number of Slabs of Super Structure 0% Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows 0% 6 to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/Premises 0% Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, 8 Overhead and Underground Water Tanks 0% The external plumbing and external plaster, elevation, completion of terraces with 9 waterproofing of the Building/Wing, 0% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance 10 lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0% 10 Table A Building-H - Wing H-4 Percentage Sr. of work No Tasks /Activity done 1 Excavation 100 % 2 Plinth 40 % 3 number of Podiums 0% 4 Stilt Floor 0% 5 8 number of Slabs of Super Structure 0% Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows 0% 6 to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/Premises 0% Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, 8 Overhead and Underground Water Tanks 0% The external plumbing and external plaster, elevation, completion of terraces with 9 waterproofing of the Building/Wing, 0% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance 10 lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0% 11 Table A Building-H - Wing H-5 Percentage Sr. of work No Tasks /Activity done 1 Excavation 30 % 2 Plinth 0% 3 number of Podiums 0% 4 Stilt Floor 0% 5 8 number of Slabs of Super Structure 0% Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows 0% 6 to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/Premises 0% Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, 8 Overhead and Underground Water Tanks 0% The external plumbing and external plaster, elevation, completion of terraces with 9 waterproofing of the Building/Wing, 0% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance 10 lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0% 12