FORM-1 ARCHITECT'S CERTIFICATE Date: 04.08.2021 To, M/S Shweta Infrastructure & Housing (I) Pvt. Ltd. Samraat Head Quarters, A33, Street-7, Satpur, Tal. & Dist. Nashik - 422 007 Subject: Certificate of Percentage of Completion of “Samraat Apna Ghar Phase-II" [ Maha RERA Registration Number P51600020657 ] , Survey No. 50/2 Shiwar Gangapur, Nashik, demarcated by its boundaries (latitude and longitude of the end points), Proposed development of Samraat Apna Ghar Phase-III (20’0035N,73’4320E) to the North, 18 M Wide Road (20’0029N , 73’4321E) to the South, Proposed development Samraat Apna Ghar Phase-I S.No.49/1/2 (20’0046N , 73’4324 E) to the East, Adj. survey No. 50/1 (20’0035N, 73’4319E ) to the West of Tal. & Dist. Nashik, PIN-422013 admeasuring 10370 Sq.Mt. area being developed by M/S Shweta Infrastructure & Housing (I) Pvt. Ltd. Sir, I Ar. Sumit Kumath have under taken assignment as Architect of certifying Percentage of Completion of Construction Work of “Samraat Apana Ghar Phase-II" Survey No. 50/2 Shiwar Gangapur, Nashik Admeasuring 10370 Sq.Mt. area being developed by M/S Shweta Infrastructure & Housing India Pvt. Ltd. 1. Following technical professionals are appointed by Owner/ Promoter:- (i) Ar. Sumit Kumath (Nashik) as an Architect; (ii) Shri. Jayant Inamdar (STRUDCOM, Pune) as Structural Consultant (iii) Shri. Ajit Kothari (MEP Solutions, Pune) as MEP Consultant Based on Site Inspection with respect to each of the Building / Wing of the aforesaid Real Estate Project ,I certify that as on the date of this certificate, the Percentage of Work done for each of the building / Wing of the Real Estate Project is as per Table A herein below. The percentage of the work done executed with respect to each of the activity of the entire phase is in Table B. 1 Table A Building –F –Wing F1 Percentage Sr. of work No Tasks /Activity done 1 Excavation 100 % 2 Plinth 100 % 3 number of Podiums N.A. 4 Stilt Floor 100 % 5 8 number of Slabs of Super Structure 100 % Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows 100 % 6 to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/Premises 100 % Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, 8 Overhead and Underground Water Tanks 100 % The external plumbing and external plaster, elevation, completion of terraces with 9 waterproofing of the Building/Wing, 100 % Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance 10 lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100% 2 Table A Building –F –Wing F2 Percentage Sr. of work No Tasks /Activity done 1 Excavation 100 % 2 Plinth 100 % 3 number of Podiums 0% 4 Stilt Floor 100 % 5 8 number of Slabs of Super Structure 100 % Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows 100 % 6 to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/Premises 100 % Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, 8 Overhead and Underground Water Tanks 100 % The external plumbing and external plaster, elevation, completion of terraces with 9 waterproofing of the Building/Wing, 100 % Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance 10 lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100 % 3 Table A Building –G –Wing G1 Percentage Sr. of work No Tasks /Activity done 1 Excavation 100 % 2 Plinth 100 % 3 number of Podiums 0% 4 Stilt Floor 100 % 5 8 number of Slabs of Super Structure 10 % Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows 0% 6 to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/Premises 0% Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, 8 Overhead and Underground Water Tanks 0% The external plumbing and external plaster, elevation, completion of terraces with 9 waterproofing of the Building/Wing, 0% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance 10 lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0% 4 Table A Building –G –Wing G2 Percentage Sr. of work No Tasks /Activity done 1 Excavation 100 % 2 Plinth 100 % 3 number of Podiums 0% 4 Stilt Floor 100 % 5 8 number of Slabs of Super Structure 13 % Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows 0% 6 to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/Premises 0% Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, 8 Overhead and Underground Water Tanks 0% The external plumbing and external plaster, elevation, completion of terraces with 9 waterproofing of the Building/Wing, 0% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance 10 lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0% 5 Table A Building –G –Wing G-3 Percentage Sr. of work No Tasks /Activity done 1 Excavation 100 % 2 Plinth 100 % 3 number of Podiums 0% 4 Stilt Floor 100 % 5 8 number of Slabs of Super Structure 38 % Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows 78 % 6 to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/Premises 5% Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, 8 Overhead and Underground Water Tanks 0% The external plumbing and external plaster, elevation, completion of terraces with 9 waterproofing of the Building/Wing, 0% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance 10 lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0% 6 Table A Building-G - Wing G-4 Percentage Sr. of work No Tasks /Activity done 1 Excavation 100 % 2 Plinth 100 % 3 number of Podiums 0% 4 Stilt Floor 100 % 5 8 number of Slabs of Super Structure 78% Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows 5% 6 to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/Premises 0% Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, 8 Overhead and Underground Water Tanks 0% The external plumbing and external plaster, elevation, completion of terraces with 9 waterproofing of the Building/Wing, 0% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance 10 lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0% 7 Table A Building-H - Wing H-1 Percentage Sr. of work No Tasks /Activity done 1 Excavation 0% 2 Plinth 0% 3 number of Podiums 0% 4 Stilt Floor 0% 5 8 number of Slabs of Super Structure 0% Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows 0% 6 to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/Premises 0% Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, 8 Overhead and Underground Water Tanks 0% The external plumbing and external plaster, elevation, completion of terraces with 9 waterproofing of the Building/Wing, 0% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance 10 lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0% 8 Table A Building-H - Wing H-2 Percentage Sr. of work No Tasks /Activity done 1 Excavation 0% 2 Plinth 0% 3 number of Podiums 0% 4 Stilt Floor 0% 5 8 number of Slabs of Super Structure 0% Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows 0% 6 to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/Premises 0% Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, 8 Overhead and Underground Water Tanks 0% The external plumbing and external plaster, elevation, completion of terraces with 9 waterproofing of the Building/Wing, 0% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance 10 lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0% 9 Table A Building-H - Wing H-3 Percentage Sr. of work No Tasks /Activity done 1 Excavation 100 % 2 Plinth 0% 3 number of Podiums 0% 4 Stilt Floor 0% 5 8 number of Slabs of Super Structure 0% Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows 0% 6 to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/Premises 0% Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, 8 Overhead and Underground Water Tanks 0% The external plumbing and external plaster, elevation, completion of terraces with 9 waterproofing of the Building/Wing, 0% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance 10 lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0% 10 Table A Building-H - Wing H-4 Percentage Sr. of work No Tasks /Activity done 1 Excavation 100 % 2 Plinth 0% 3 number of Podiums 0% 4 Stilt Floor 0% 5 8 number of Slabs of Super Structure 0% Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows 0% 6 to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/Premises 0% Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, 8 Overhead and Underground Water Tanks 0% The external plumbing and external plaster, elevation, completion of terraces with 9 waterproofing of the Building/Wing, 0% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance 10 lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0% 11 Table A Building-H - Wing H-5 Percentage Sr. of work No Tasks /Activity done 1 Excavation 0% 2 Plinth 0% 3 number of Podiums 0% 4 Stilt Floor 0% 5 8 number of Slabs of Super Structure 0% Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows 0% 6 to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the Flat/Premises 0% Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, 8 Overhead and Underground Water Tanks 0% The external plumbing and external plaster, elevation, completion of terraces with 9 waterproofing of the Building/Wing, 0% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance 10 lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0% 12 TABLE-B Internal & External Development Works in Respect of the entire Registered Phase Sr. Proposed Percentage of No Common areas and Facilities, Amenities (YesAlo) Work done Details Intemal Paved 1 Internal Roads & Footpaths Yes t0% Driveways 2 Water Supply Yes t0% NMC J Sewerage (clgmber, lines, Septic Tank, STP) Yes l0% Proposed 4 Storm Water Drains Yes 0% Proposed 5 Landscaping & Tree planting Yes 0% Proposed 6 Street Lighting Yes 0% Proposed Electrical meter room, sub-station, receiving 0% Substation 7 station Yes complete 8 Aggregate area ofrecreational open space Yes 0% 9 Open Parking Yes 0% Proposed t00 % Club & l0 Community Buildings Yes Gymnasium Treatment and disposal of sewage and sullage 0% l1 water Yes STP 0% Ghantagadi Nashik Municiple t2 Solid Waste management & Disposal Yes corporation 0% Rain water 13 Water conservation, Rain water harvesting Yes Harvesting 0% Use Of CFL & t4 Energy management Yes LED Liehtine 0% Fire Fighting 15 Fire protection and fire safety requirements Yes System Yours Faithfully Ar Sumit Kumath. v i\ /* 13