l SAMARTH CONSULTANTS Sup. Satish Thoke building planners & Interior designer Shriram Sankul Badade Nagar Shivaji Chouk Nashik. M.no. 9405884581, EMAIL. - satishdthoke@gmail.com FORM 1 [seeRegulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for Withdrawal of Money from Designated Account) (Period Ended 30/09/2024) To, M/S. OM CONSTRUCTION. Mrs. Sheela Santosh Borade (Proprietor), Plot No. 22, S.No. 230/03/22, Shivamrut Bungalow, Near Ekta Green Valle, Pathardi·Phata, NASHI K-422010. Subject: Certificate of Percentage of Completion of Construction Work of OM GAURI PARK. having MahaRERA Registration Number- PS1600021549 being developed by M/s. OM CONSTRUCTION through PROPRIETOR Mrs. SHEELA SANTOSH BORADE. Sir. I Satish Thoke have undertaken assignment as Architect /Licensed Surveyor of certifying-Percentage of _Completion of Construction Work of OM GAURI PARK having MahaRERA Registration Number- P51600047132 being developed by M/s. OM CONSTRUCTION through PROPRIETOR Mrs. SHEELA SANTOSH BORADE. Based on Site Inspection, with respect to Layout each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A Layout/ Building/ Wing Number (to be prepared separately for each Layout/ Building/ Wing of the Project) Building Name OM GAURI PARK. Sr. No. (1) Tasks/ Activity (2) Percentage of Actual Work Done (As on date of the Certificate) (3) 1. Excavation. 100% 2. Basement (if any). 0% 3. Podiums (if any). 0% 4. Plinth. 100% 5. Stilt Floor. - 100% 6. Slabs of Super Structu re. 100% 100% 7. Interna l walls, Interna l Plaster, Floorings, Doors and window s within Flats/Premises . 100% 8. Sanitary Fittings within the Flat/Premises. 9. 100% Staircases, Lifts Wells and Lobbies at each Floor level Overhe ad and Underg round Water Tanks. 10. 100% External plumbi ng and external plaster, elevation, comple tion of terrace s with water proofin g of the Buildin g/Wing . 11. 100% Installa tion of lifts, water pumps, Fire Fighting and Equipm ent as per CFO NOC, Electrical fittings , mechanical equipm ent, compliance to conditi ons of environ ment/C RZ NOC, Finishing to entranc e lobby/s , plinth protect ion, paving of areas appurte nant to Buildin g/Wing , Compo und Wall and all other require ments as may be required to comple te project as per specific ation in agreem ent of Sale. Any other activitie s. TABLE-B Comm on Areas (Intern al and External Develo pment Works) in respect of the Registered Phase/ Project Numbe r Sr. No. Comm on areas and Facilities (2) Proposed (3) Percentage of Details (5) (1) Actual Work Done(4) 1. Interna l Roads & Footpa ths. NO N.A. N.A. 2. Water Supply. YES 100% Water Supply provide d. 3. Sewerage (Chamber,lines, Septic Tank,STP). YES 100% Septic tank outlet connec ting to the NMC sewer line. 4. Storm Water Drains. NO N.A. N.A. 5. Landscaping& Tree Planting. YES 100% Trees will be planted 6. Street Lighting. NO N.A. N.A. 7. Communit y Buildings. NO N.A. N.A. 8. Treatment and disposal of sewage and NO N.A. N.A. sullage water. NO N.A. N.A. 9. Solid Waste management &Disposal. YES 100% Rainwater 10. Water conservation, Rain water harvesting. harvesting to be provided NO N.A. N.A. 11. Energy management. N.A. N.A. 12. Fire protection and fire safety requirements NO YES 100% Electrical meter 13. Electrical meter room, sub-station, receiving room only. station. 14. Others (Option to AddMore.) Yours Faithfully, '~- .·i, .,g~ "liiiilllli Signat~ e ;;:l'1 D.'THOKE i ; _ Signature of Promoter O~U CTIO N ~ :il.IPER VISOR' ' ' R. No.63 r-.tr:. Satish Thoke / Architect (License No . .......................... ) ' ~/s oM co~ m o~J