I SAMARTH CON SUL TAN TS Sup. Satish Thake buildin g planners & Interio r design er Shriram Sankul Badade Nagar Shivaji Chouk Nashik. M.no. 9405884581 , EMAIL. - satishdthoke@gmail.com FORM 1 [seeRegulation 3) ARCHITECT'S CERTIFICATE (To be submitte d at the time of Registration of Ongoing Project and for Withdra wal of Money from Designated Account) (Period Ended 31/03/2 022) To, M/S. OM CONSTRUCTION . Mrs. Sheela Santosh Borade (Proprietor), Plot No. 22, S.No. 230/03/ 22, Shivamrut Bungalow, Near Ekta Green Valle, Pathardi Phata, NASHIK-422010. OM GAURI PARK. having MahaRERA Subject: Certifica te of Percentage of Completion of Construction Work of UCTION through PROPRIETOR Mrs. Registration Number - P51600021549 being developed by M/s. OM CONSTR SHEELA SANTOSH BORADE. Sir. r of certifyin g Percentage of I Satish Thoke have undertak en assignment as Architect /Licensed Surveyo MahaRE RA Registration Number- P51600047132 Complet ion of Constru ction Work of OM GAURI PARK having TOR Mrs. SHEELA SANTOSH BORADE. being develop ed by M/s. OM CONSTRUCTION through PROPRIE of the aforesaid Real Estate Project, Based on Site Inspection, with respect to Layout each of the Building/Wing done for each of the building /Wing of the I certify that as on the date of this certificate, the Percentage of Work percentage of the work executed with Real Estate Project under MahaRERA is as per Table A herein below. The respect to each of the activity of the entire phase is detailed in Table B. TABLE-A Layout/ Building / Wing Number (to be prepared separate ly for each Layout/ Building / Wing of the Project) Building Name OM GAURI PARK. Tasks/ Activity (2) Percentage of Actual Work Done Sr. No. (1) (As on date of the Certificate) (3) 100% 1. Excavation. 0% 2. Basement (if any). Podiums (if any). 0% 3. 4. Plinth. 100% 5. Stilt Floor. 100% 6. Slabs of Super Structure. 100% 100% 7. Internal walls, Internal Plaster, Floorings, Doors and windows within Flats/Premises. 100% 8. Sanitary Fittings within the Flat/Premises. 100% 9. Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks. 100% 10. External plumbing and external plaster, elevation, completion of terraces with water proofing of the Building/Wing. 100% 11. Installation of lifts, water pumps, Fire Fighting and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specification in agreement of Sale. Any other activities. TABLE-8 Common Areas {Internal and External Development Works) in respect of the Registered Phase/ Project Number Sr. No. Common areas and Facilities {2) Proposed (3) Percentage of Details (5) {1) Actual Work Done (4) 1. Internal Roads & Footpaths. NO N.A. N.A. 2. Water Supply. YES 100% Water Supply provided. 3. Sewerage {Chamber,lines, Septic Tank,STP). YES 100% Septic tank outlet connecting to the NMC sewer line. 4. Storm Water Drains. NO N.A. N.A. 5. Landscaping& Tree Planting. YES 100% Trees will be planted 6. Street Lighting. NO N.A. N.A. I 7. 8. Community Buildings. Treatment and disposa l of sewage and sullage water. NO NO N.A. N.A. N.A. N.A. 9. Solid Waste management &Disposal. NO N.A. N.A. 10. Water conservation, Rain water harvesting. YES 100% Rainwater harvesting to be provided 11. Energy management. NO N.A. N.A. 12. Fire protection and fire safety requirements NO N.A. N.A. 13. Electrical meter room, sub-station, receiving YES 100% Electrical meter station. room only. 14. Others (Option to Add More.) Yours Faithfully, Signature of Promoter s~~~~~ure ~Elf:£2-:.: ··: OM CONSTRUCTION :_~-SATISH D. THOKE f :'· ~ !: SU PERVI SOR · R. No.63 ~ Ntr,. Satish Thoke / Architect M/S OMflligfr\M§RLJ (License No ........................... )