1 SAMARTHCONSULTANTS Sup. Satish Thoke building planners & Interior designer Shriram Sankul Badade Nagar Shivaji. Chouk Nashik. M.no. 9405884581, EMAIL. - satishdthoke@gmail.com FORM 1 [seeRegulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for Withdrawal of Money from Designated Account) (Period Ended 31/03/2021) To, M/S. OM CONSTRUCTION. Mrs. Sheela Santosh Borade (Proprietor), Plot No. 22, S.No. 230/03/22, Shivamrut Bungalow, Near Ekta Green Valle, Pathardi Phata, NASHIK-422010. Subject: Certificate of Percentage of Completion of Construction Work of OM GAURI PARK. having MahaRERA Registration Number- P51600021549 being developed by M/s. OM CONSTRUCTION through PROPRIETOR Mrs. SHEELA SANTOSH BORADE. Sir. I.Satish Thoke have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of OM GAURI PARK having MahaRERA Registration Number- P51600047132 being developed by M/s. OM CONSTRUCTION through PROPRIETOR Mrs. SHEELA SANTOSH BORADE. Based on Site Inspection, with respect to Layout each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A Layout/ Building/ Wing Number (to be prepared separat~ly for each Layout/ Building/ Wing of the Project) Building Name OM GAURI PARK. Sr. No. (1) Tasks/ Activity (2) Percentage of Actual Work Done (As on date of the Certificate) (3) 1. Excavation. 100% 2. Basement (if any). 0% 3. Podiums (if any). 0% 4. Plinth. 100% ~ 5. Stilt Floor. 100% 6. Slabs of Super Structure . 100% 100% 7. Internal walls, Internal Plaster, Floorings, Doors and windows within Flats/Pre mises. 100% 8. Sanitary Fittings within the Flat/Prem ises. 9. 100% Staircases, Lifts W ells an d Lobbies at each Floor level Overhea d and Undergro und Water Tanks. 10. 100% External plumbing and external plaster, elevation, completi on of terraces with water proofing of the Building/ Wing. 11. 100% Installati on of lifts, water pumps, Fire Fighting and Equipme nt as per CFO NOC, Electrical fittings, mechani cal equipme nt, complian ce to condition s of environm ent/CRZ NOC, finishing to entrance lobby/s, plinth protectio n, paving of areas appurten ant to Building/ Wing, Compoun d Wall and all other requirem ent~ as may be required to complete project as per specifica tion in agreeme nt of Sale . Any other activities . TABLE-B Common Areas (Internal and External Developm ent Works) in respect of the Registered Phase/ Project Number Sr. No. Common areas and Facilities (2) Proposed (3) Percenta ge of Details (5) (1) Actual Work Done (4) 1. Internal Roads & Footpath s. NO N.A. N.A. 2. Wate r Supply. YES 100% Water Supply provided . 3. Sewerag e (Chambe r,lines, Septic Tank,STP). YES 100% Septic tank outlet connecti ng to the NMC sewer line. 4. Storm W ater Drains. NO N.A. N.A. 5. Landscap ing& Tree Planting. YES 100% Trees w ill be planted 6. Street Lighting. NO N.A. N.A.. 7. Commun ity Buildings . NO N.A. N.A. 8. Treatment and disposal of sewage and NO N.A. N.A. sullage water. 9. Solid Waste management &Disposal. NO N.A. N.A. 10. Water conservation, Rain water harvesting. YES 100% Rainwater harvesting to be provided 11. Energy management. NO N.A. N.A. 12. Fire protection and fire safety requirements NO N.A. N.A. 13. Electrical meter room, sub-station, receiving YES 100% Electrical meter station. room only. 14. Others (Option to AddMore.) Yours Faithfully, Signature & Name Signature of Promoter .--;_-. sft