SAGAR S. SHAH B.E.(Civil) M.l.E.,F.l.V. Cell : 9422247125 F -27433 E-mail : er.sagarshah@gmail.com o Approved Valuer o Consulting Engineer 54, Sahajeevan Colony, Visemala, College Road, Nashik - 422 OO5 ENGINEER'S CERTIFICATE (FORM 2) Date:3LlOBlzOzl To, Yogeshwar Realty Shop No. I &2, Rajkamal Residency, Opp. Burkule Lawns, Nashik - 422009 Subject: Certificate of Cost lncurred for Development of SHIVALIK SIGMA for Construction Work of 1 Building, situated on Plot No. 4 + 5 bearing Survey No. B3lal5 demarcated by its boundaries (latitude and longitude of the end points) Open Space to the North, 9 Meter Road to the South, 30 Meter D.P. Road to the East, S.No. 328 to the West of Division Nashik, Village Pathardi, Taluka Nashik, District Nashik, PIN 422009 admeasuring 1155.93 Sq. Mtrs. Area being developed by Yogeshwar Realty. Ref: MahaRERA Registration Number P51600021505 Sir, l, Er. Sagar S. Shah have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MAHARERA, being 1 Building, situated on Plot No. 4 + 5 bearing Survey No. *3lal5 of Division Nashik, Village Pathardi, Taluka & District Nashik, PIN 422009 admeasuring 1155.93 Sq. Mtrs. Area being developed by yOGESHWAR REALTY. Following technical professionals are appointed by owner / promoter:- (i) Shri Ashok Jamdar as Licensed Engineer; (ii)Shri Ashok Jamdar as Structural Consultant 1. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the building of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Er. Sagar S. Shah quantity Surveyor* appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 2. We estimate Total Estimated Cost of completion of the SHIVALIK SIGMA of the aforesaid project under reference as Rs. 5,11,50,000/- (ln words Rupees Five Crores Eleven Lakhs and Fifty Thousand Only) (Total of Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building from.the Nashik Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 3. The Estimated Cost lncurred till date is calculated at Rs. 5,11,50,000/- (Total of Table A and B). The amount of Estimated Cost lncurred is calculated on the base of amount of Total Estimated Cost. 4. The Balance cost of Completion of the Civil, MEP and Allied works of the building of the subject project to obtain Occupation Certificate / Completion Certificate from Nashik Municipal Corporation (planning Authority) is estimated at NIL (Total of Table A and B). 5. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: 5. s 9t{ c/) Eng\n :F \ia\uet * lr Ij1 ,tdAS TABTE A Building called SHIVALIK SIGMA (1 Buildine) Sr. No. Particulars Amounts L Total Estimated cost of the building Rs. 5,1L,50,OOOI- as on 31.08.202L date of Registration is 2 Cost incurred as on 3L.08.2021 Rs. 5,11,50,0001- (based on the Estimated cost) 3 Work done in Percentage 700% (as Percentage of the estimated cost) 4 Balance Cost to be lncurred Nil (Based on Estimated Cost) 5 Cost lncurred on Additional /Extra ltems as on 31.08.2021 Nil not included in the Estimated Cost (Annexure A) TABLE B Building called SHIVALIK SIGMA (1 Buildinc) Sr. No. Particulars Amounts t Total Estimated cost of lnternal & External Development Works including amenities and Facilities in the layout as on Nit 3L.08.2027 date of Registration is 2 Cost incurred as on 31.08.2021 Nil (based on the Estimated cost) 3 Work done in Percentage (as Percentage of the estimated cost) Nil 4 Balance Cost to be Incurred Nil (Based on Estimated Cost) 5 Cost lncurred on Additional /Extra ltems as on 31.08 .2021, not included in Nil the Estimated Cost (Annexure A) S .s o nsuttir' 9 .r r{ir,iti i't i,.t \ii\rr-l' ,' I rl 'rl. \-... .r I '-. i'. :,.,' Yours Faithfully F RS Crinlr,i;: i lll i'1;',,. :2 r n(tt,1-i. rr. r(r j r ?:i.ll llt, 'ir, ,{. {/u ER. SAGAR S. SHAH - * Notes: 1. The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate /Completion Certificate. 2. As this is an estimated cost, any deviation in quantity required for development of the Real estate Project will result in amendment of the cost incurred/to be incurred. 3. All components of work with specifications are indicative and not exhaustive Annexure A List of Extra / Additional ltems executed with Cost (which were not part of the original Estimate of Total Cost) Ntt