o Vijaya Consultants BUILDING BUILDING PLANNERS & DESIGNERS PLANNERS sth Floor, Sictdhi Pooja Business Square Behind Lele Hospital, Kulkarni Colony, o Sharanpur Road, Nashik - 422002. STRUCTURAL Ph.:0253 2574602, CONSULTANTS Email :- viiayaconsultants92T@gmail.com Er. ASHOK JAMDAR FORM 1 Date: 31/08 lziLt To, Yogeshwar Realty Shop No. t&2, Rajkamal Residency, Opp. Burkule Lawns, CIDCO, Nashik - 422009 Subject: Certificate of Percentage of Completion work of building name SHIVALIK SIGMA for Construction Work of 1 Building, situated on Plot No. 4 bearing S.No. 333/4 and Plot No. 5 bearing S.No. 333/5 demarcated by its boundaries (latitude and longitude of the end points) Open Space to the North, 9 Meter Road to the South, 30 Meter D.P. Road to the East, S.No. 328 to the West of Division Nashik, Village Pathardi, Taluka Nashik, District Nashik, PIN 422009 admeasuring 1155.93 Sq. Mtrs. Area being developed by Yogeshwar Realty. si f, l, Er. Ashok N. Jamdar have undertaken assignment as Architect of certifying Percentage of Completion of construction work of the project SHIVALIK SIGMA, situated on the Plot No. 4 bearing S.No. 333/4 and Plot No. 5 bearing S.No. 333/5, of Division Nashik, Village Pathardi, Taluka Nashik, District Nashik, PIN 422009 admeasurine 11.55.93 Sq. Mtrs. Area being developed by Yogeshwar Realty. 1. Following technical professionals are appointed by Owner / Promoter:- (i) Mr. Ashok N. Jamdar as Architect; (ii) Mr. Ashok N. Jamdar as Structural Consultant Based on Site lnspection, with respect to each of the Buildings of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate Project as registered vide number P51600021505 under RERA is as per table A herein below. The percentage of the work executed with respect to each of the major activity of the Building / Wing and Overall Percentage of the work done with respect to each Building / Wing is detailed in the Table B. Table A SHIVATIK SIGMA Sr.No, Tasks / Activity Percentage 1 Excavation 100 2 L number of Plinth 100 3 0 number of Podiums NA 4 1 Stilt Floor 100 5 8 number of Slabs of Super Structure 100 6 lnternal Walls, lnternal Plaster, Floorings within the Flat / Premises, Doors 100 and Windows to each of the Flat / Premises 7 Sanitary Fittings within the Flat / Premises, Electrical Fittings within the 100 Flat / Premises, 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 100 Staircases and Lifts, Overhead and Underground Water Tanks 9 External Plumbing and External Plaster, Elevation, Completion of Terraces 100 with Waterproofing of the Building / Wing 10 lnstallation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical Fittings to Common Areas, Electro, Mechanical Equipment, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of areas L00 appurtenant to Building / Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate. TABTE - B SHIVATIK SIGMA lnternal & External Development Works in Respect of the project Percentage Common Roads and Facilities, Proposed Sr. No. of Work Details Amenities (Yes/ttto) done 1 lnternal Roads and Footpaths No 0 NA 2 Water Supply Yes 100 Obtained From NMC Sewerage (Chamber, Lines, Septic 3 Yes 100 Septic Tank done Tank, STP) 4 Storm Water Drains No 0 NA 5 Landscaping and Tree Planting No 0 NA 6 Street Lighting Yes 100 By NMC 7 Community Buildings No 0 NA Treatment and Disposal of 8 No 0 NA Sewage and Salvage Water Solid Waste Management and 9 No 0 NA Disposal Water Conservation and Rain 10 Yes 100 Rain Water Harvesting done Water Harvesting L1 Energy Management No 0 NA 72 Fire protection and Fire Safety No 0 NA Requirements 13 Electrical Meter Room, Sub- Yes 100 Meter Box Provided Station, Receiving Station Yours Faithfuf '.\ .ll f i: ' -' ''" ' ",'," Er. Ashok N. Ja$i:daf ':.'.:.. .;.'t' "i"; ';':i"" Agreed & Accepted by. &ator. Signature of Promoter Name: Yogeshwar Realty Date:- 3LlO8l2O2L