SHREENATH DESIGN & ASSOCIATES 0.3-SHREESANMAN SOCIETYOLDGANGAPUR NAKA,GANGAPUR ROAD NASHIK FORM-2 (See Regulation 3] ENGINEER'Ss CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-Project wise) ToDate:15/03/2022 Bhagwati Developers 9, Amibansi Heights, Ashwin Nagar, Cidco, Nashik 422009 Work of 1 Subiect: Certificate of Cost Incurred for Development of Krishna Pridefor Construction Building(S/Wing(s) situated on the Plot bearing C. N. No / CTS No. / Survey No. 316/3 Final Plot No. 4+5+6 demarcated by its boundaries (latitude and longitude of the end points) 7.5 Mtr. Colony Road to the North Plot No. 3 to the South 18 Mtr. D P Road to the East Plot No. 7, 8, 9 and 10 to the West of Division Nashik village Nashik taluka Nashik District Nashik PIN 422009 admeasuring 3164.41 Sq. Mtrs. Area being developed by Bhagwati Developer Reference: MahaRERA Registration Number: P51600021476 Sir, Estimated Cost for the Subject Real ,Er. Vinayak Patil have undertaken assignment of certifying Estate Project proposed to be registered under RERA, being 1Building(s/Wing/s) of the Krishna Pride Building situated on the plot bearing C. N. No/ CTS No. Survey No. 316/3 Final Plot No. 4-5+6 of Division Nashik village Nashik taluka Nashik District Nashik PIN 422009 admeasuring 3164.41 Sq Mtrs. Area being developed by Bhagwati Developer 1. Following technical professionals are appointed by Owner / Promoter M/s/Shri/ Smt Vinayak Patilas L. S. / Architect; () (ii) M/s/ Shri/Smt Ramesh Wagh as Structural Consultant (ii) M/s/ Shri / Smt as MEP Consultant (iv) M/s/Shri / Smt as Quantity Supervisor* 2. We have estimated the cost of the completion to obtain Occupation Certificate / Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/ plans made available to us for the project under reference by the Developer and Consultant and the Schedule of times and quantity for the entire work as calculated by Er. Vinayak Patil quantity Surveyor* appointed by Developer/ Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs. 6,95,00,000/- The estimated Total Cost of project is with reference to the Civil, MEP, and allied works required to be completed for the purpose of obtaining occupation certificate/ completion certificate for the building's) from the Nashik Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs. 7,49,14,213/-. The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 5. The Planning cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate/ Completion Certificate from Nashik Municipal Corporation (planning Authority) is estimated at Nil. 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B Below. TABLE-A (To be prepared separately for each Building/ Wing ofthe Real Estate Project) Sr. No. Particulars Amounts 1 Total Estimated cost of the building/wing as on 05/07/2019 i.e. date of Registration is Rs.6,95,00,000/ 2 Cost incurred as on 30/09/2021 (based on the Estimated cost) Rs. 7,49,14,213/ 3 Work done in Percentage (as Percentage of the estimated cost) 100% Balance Cost to be lIncurred Nil[As the project is (Based on Estimated Cost) completed) 5 Cost Incurred on Additional/Extra Items as on Nil 30/09/2021 not included in the Estimated Cost (Annexure A) TABLE B (To be prepared for the entire registe red phase of the Real Estate Project) Amounts Sr. No. Particulars 1 Total Estimated cost of the Internal and External Development Works including amenities and Rs. 6,95,00,000/ Facilities in the layout as on 05/07/2019 i.e. date of Registration is 2 Cost incurred as on 30/09/2021 (based on the Estimated cost) Rs. 7,49,14,213/ 3 Work done in Percentage (as Percentage of the estimated cost) 100% 4 Balance Cost to be Incurred Nil (Based on Estimated Cost) (As the project is completed) 5 Cost Incurred on Additional / Extra Items as on 30/09/2021 not included in the Estimated Cost (Annexure A) Nil Yours Faithfully Er. Swal)E. Bhanage REENATHDESÍGN &ASSOCIATES Reg No- PEL24/6C0194 Signature of Engineer