VINAYAK PATIL & ASSOCIATES OLD GANGAPUR NAKA,GANGAPUR ROAD NASHIK FORM 1 ARCHITECT'S CERTIFICATE from Project and for withdrawal of Money (To be submitted at the time of Registration Ongoing of Designated Account- Building/Wing wise) Date: 15/03/2022 To Bhagwati Developers 9-Amibansi Heights, Ashwin Nagar, Cidco, Nashik-422009 of of Construction Work of 1 Building(s)/ Wing(s) Subject: Certificate of Percentage of Completion C.N. No/ CTS No./ the Krishna Pride Project situated on the Plot bearing Building /Phase of the boundaries (latitude and longitude of the Survey No. 316/3 Final Plot No.4+5+6 demarcated by its the East Plot No. 3 to the South 18 Mtr. D P Road to end points) 7.5 Mtr. Colony Road to the North Nashik District Nashik Nashik village Nashik taluka Plot No. 7, 8, 9 and 10 to the West of Division PIN 422009 admeasuring 3164.41 Sq. Mtrs. Area being developed by Bhagwati Developer P51600021476 Reference: MahaRERA Registration Number Sir, as Architect/ Licensed Surveyor of certifying I, Vinayak Patil have undertaken assignment Percentage of Completion of Construction Work of 1 Building(S)/Wing(s) of theKrishna Pride Building C. N. No/ CTS No. Survey No. 316/3 Final Plot No. / Phase of the Project, situated on the plot bearing 4+5+6 of Division Nashik village Nashik taluka Nashik District Nashik PIN 422009 admeasuring 3164.41 Sq. Mtrs. Area being developed by Bhagwati Developer 1. Following technical professionals are appointed by Owner/ Promoter M/s/ Shri/ Smt Vinayak Patil as L. S./Architect; (i) M/s/Shri/ Smt Ramesh Wagh as Structural Consultant M/s/Shri / Smt a s MEP Consultant (ii) (iv) M/s/Shri/ Smt as Site Supervisor Based on Site Inspection, with respect to each of the Building/ Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/ Wing ofthe Real Estate Project as registered vide number P51600021476 under RERA is as per table A herein below. The percentage of the work executed with respect to each of the major activity of the Building / Wing and Overal Percentage of the work done with respect to each Building /Wing is detailed in the Table B. Table A Sr.No Tasks/ Activity Percentage 1 Excavation 100% 2 Plinth 100% 3 RCC-6 out of 6 number of Slabs of SuperStructure 100% Masonry/ walls 100% Internal Plaster 100% 5 External Plaster, elevation 100% 6 100% Flooring within Flats/ Premises Premises 100% 8 Door and Windows to each of the Flat/ External plumbing down take lines,CP/ Sanitary Fitting 100% 9 within the Flats/ Premises-Electrical Fitting within the Flats/Premises, Electrical switches and wiring inside apartment 100% 10 100% 11 Painting Lobbies at eachFloor level 100% 12 Staircases, Lifts Wells and LiftsOverhead and Underground connecting Staircases and Water Tanks of the Building 100% 13 Completion of terraces with waterproofing Installation of lifts 100% 14 16 Fire Fighting Fittings and Equipment's as per CFO NOC NA 17 Electrical fittings to Common Areas, water pumps, electro 100% mechanical equipment's 18 Finishing of entrance lobby/s, paving of areas appurtenant 100% to Building, Compound Wall and all other requirements as may be required to obtain Occupation/Completion Certificate TABLE B Internal & External Development Works in Respect of the project S. No. Common Roads and Facilities, ProposedPercentageof Work Details Amenities (Yes/No) done 1 Side margin pavement NO NA Water Supply YES 100% Connectiontaken from NMC Sewerage (chamber, sewage lines), YES 100% As Per Plan Storm Water Drains Landscaping & Tree Planting NO NA 4 5 Common area Lighting YES 100% As Per Plan 6 Water conservation, Rain water YES 100% As Per Plan harvesting8 Fire protection and fire safety NO NA requirements Electrical meter room, sub-station, YES 100% As Per Plan 8 receiving station Yours Faithfully Ar.Vinayak Patil reeha Des (License No: OssY