Table A Building C – Wing D Percentage Sr. of work No Tasks /Activity done 1 Excavation 100 % 2 Plinth 100 % 3 Podium 0% 4 Stilt Floor 100 % 5 15number of Slabs of Super Structure 100 % Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and 6 Windows to each of the Flat/Premises 100 % Sanitary Fittings within the Flat/Premises, Electrical Fittings within the 7 Flat/Premises 100% Staircases, Lifts Wells and Lobbies at each Floor level connecting 8 Staircases and Lifts, Overhead and Underground Water Tanks 100% The external plumbing and external plaster, elevation, completion of 9 terraces with waterproofing of the Building/Wing, 100% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing 10 to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 100% TABLE-B Internal & External Development Works in Respect of the entire Registered Phase - Percentage Sr. Proposed of Work No Common areas and Facilities, Amenities (Yes/No) done Details Internal Paved Yes 100% 1 Internal Roads & Footpaths Driveways UGT Executed in Yes 100 % Gokuldham Project 2 Water Supply 01 Sewerage (chamber, lines, Septic Tank, 3 Yes 100% STP) Proposed 4 Storm Water Drains Yes 100% Proposed 5 Landscaping & Tree planting Yes 100 % Proposed 6 Street Lighting Yes 100% Proposed Club & Gymnasium Executed in 7 Community Buildings Yes 100 % Gokuldham Project 01 Treatment and disposal of sewage and Yes 100% 8 sullage water STP Garbage chute/ Yes 100% 9 Solid Waste management & Disposal NMC Ghantagadi Rain water Yes 100% 10 Water conservation, Rain water harvesting Harvesting Use of LED Yes 100% 11 Energy management Lighting Fire Fighting Yes 100 % System & Lighting 12 Fire protection and fire safety requirements arrester