Ar, Toposyo Bendole Res : 6, Blue Berry Apartment, Bhavanjali Nagar, Off. Gangapur Road, Nashik-13. Contact : 9552592987 , 0253 - 241 8080 Email : tapasyabendale@yahoo.com Registration No. CA/2004/33306 Annexure A FORM 1 , [See Regulation 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) Date:2.04.2022 To, M/S Shweta lnfrastructure & Housing (l) Pvt. Ltd. Samraat Head Quarters, A33, Street-7, Satpur, Tal. & Dist. Nashik - 422 007 Subject: Certificate of Percentage of Completion of Construction Work of Samraat Gokuldham Project 02, Building C- Wing D of the Project situated on Survey No.206/1/3, Nashik Shiwar,having Maha RERA Registration Number Maha RERA Registration Number:P51600020375 being Developed by M/S Shweta lnfrastructure & Housing (l) Pvt. Ltd. Sir, I / We have undertakbn assignment as Architect of Certifying Percentage of Completion of Construction Work of Samraat Gokuldham Project 02, Building C- Wing D having Maha RERA Registration Number P51600020375 being Developed by MiS Shweta lnfrastructure & Housing (l) Pvt. Ltd. Based on the Site lnspection, with respect to the Layout I each BuildingMing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the BuildingA/Uing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. ,M Ar. Tapasya H.Bendale (Reg.No. CA t 2004/ 33306) Table A Building C – Wing D Percentage Sr. of work No Tasks /Activity done 1 Excavation 100 % 2 Plinth 100 % 3 Podium 0% 4 Stilt Floor 100 % 5 15number of Slabs of Super Structure 100 % Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and 6 Windows to each of the Flat/Premises 100 % Sanitary Fittings within the Flat/Premises, Electrical Fittings within the 7 Flat/Premises 75% Staircases, Lifts Wells and Lobbies at each Floor level connecting 8 Staircases and Lifts, Overhead and Underground Water Tanks 100% The external plumbing and external plaster, elevation, completion of 9 terraces with waterproofing of the Building/Wing, 100% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing 10 to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 75% TABLE-B Internal & External Development Works in Respect of the entire Registered Phase - Percentage Sr. Proposed of Work No Common areas and Facilities, Amenities (Yes/No) done Details Internal Paved 1 Internal Roads & Footpaths Yes 25% Driveways 100 % UGT Executed in Gokuldham Project 2 Water Supply Yes 01 Sewerage (chamber, lines, Septic Tank, 85% 3 STP) Yes Proposed 4 Storm Water Drains Yes 100% Proposed 5 Landscaping & Tree planting Yes 80 % Proposed 6 Street Lighting Yes 0% Proposed 100 % Club & Gymnasium Executed in Gokuldham Project 7 Community Buildings Yes 01 Treatment and disposal of sewage and 100% 8 sullage water Yes STP 100% Garbage chute/ 9 Solid Waste management & Disposal Yes NMC Ghantagadi 90% Rain water 10 Water conservation, Rain water harvesting Yes Harvesting 80% Use of LED 11 Energy management Yes Lighting 100 % Fire Fighting System & Lighting 12 Fire protection and fire safety requirements Yes arrester 1O0o/o Substation in Electrical meter room, sub-station, receiving Gokuldham Project 13 station Yes 01 14 Aggregate area of recreational open space Yes 75% Proposed 15 Open Parking Yes 100o/o Proposed Yours Faithfully, AT. TAPASYA H. BENDALE. (cA/2004133306) w Gff: Irm*#:r#i*, Agreed & Accepted Signature of Promoter, Name: M/S Shweta I Dale:2.04.2022