Ar. Toposyo Bendole Res:6, Blue BerryApartmenl, Bhavanjali Nagar, Off. Gangapur Road, Nashik-'l3. Contact : 9552592987, 0253 - 241 8080 Email : tapasyabendale@Yahoo.com Registration No. CA/2004133306 ARCHITECT'S CERTIFICATE Date:05.08.2021 To, IWS Shweta Infrastructure & Housing (I) Pvt. Ltd. Samraat Head Quarters, A33, Street-7, Satpur, Tal. & Dist. Nashik - 422007 Subject : Certificate of Percentage of Completion of Construglion Work of Samraat Gokuldham project 02, (Maha RERA Registration Number :P51600020375) Building C- Wing D of the Project situ;ted onS'urvey No.206l1/3lNashik Shiwar, demarcated by its boundaries (latitude and longitude of the end points)S.No .206llll+206ll/2 (20.020382,73.816811)to the North ,S.No206/2 Part (20.020050, 73-816961) to the East, ,(20.019817, iZSt1rcqto the South, Proposed S No 205/1lP Samraat Gokuldham Project 01 & 18M Road (20.020076,73.816645) to the West, Tal. & Dist. Nashik, pIN 422003 admeasuring 2890 Sq. Mt. area being developed by M/S Shweta Infrastructure & Housing (I) P\4 Ltd. Sir, I Ar. Tapasya H. Bendale, have undertaken assignment as an Architect of certiffing Percentage of Compleiion of Construction Work of Samraat Gokuldham Project 02, Building C- Wing D, of the froject situated on Survey No.206/1/3, Nashik Shiwar, admeasuring 2890 Sq. Mt. area being developed By IWS Shweta Infrastructure & Housing India Pvt.Ltd' 1. Following technical professionals are appointed by Owneri Promoter :- (i) Smt.Tapasya H. Bendale as Architect. (iil shri.Jayant Inamdar (sTRUDCOM,Pune) as Structural Consultant. (iiil Ski.Milind Shete (Milind Services, Nashik) as MEP Consultant. Estate Project, Based on Site Inspection, with respect to each of the Building / Wing of the aforesaid Real I certiff that as on the date of this certificate, the Percentage of Work done for each of the building/Wing exectrted with of the Real Estate project is as per table A herein below. The percentage of the work done respect to each of the activity of the entire phase is in Table B. H.B"I'11.Y.u.' t I 2004 ..#'li:tl Table A BuildingC-WingD Percentage Sr. of work No Tasks /Activify done I Excavation 100 0A 2 Plinth 100 % J Podium 0% 4 Stilt Floor tao % 5 lSnumber of Slabs of Super Structure 95% Internal walls, Internal Plaster, Floorings within FlatslPremises, Doors and Windows 6 to each of the Flat/Premises 40% 7 Sanitary Fittings within the FlaVPremises, Electrical Fittings within the Flat/Premises 0% Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and 8 Lifts, Overhead and Underground Water Tanks 0% The external plumbing and external plaster, elevation, completion of terraces with 9 waterproofing of the Building/Wing, 0% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per cFo Noc, Electrical fittings to common Areas, electro, mechanical equipment, compliance to conditions of environment /cRZ Noc, Finishing to entrance 10 lobby/s, plinth protection, paving of areas appurtenant to Building/wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certifi cate 0% ..-'ffi'htiltth., TABLE-B Internal & External Development Works in Respect of the entire Registered Phase - Percentage Sr. Proposed of Work No Common areas and Facilities, Amenities (Yes/1.{o) done Details Internal Paved I Internal Roads & Footpaths Yes 0% Driveways 30% UGT Executed in Gokuldham Project 2 Water Supply Yes 01 a J Sewerage (chamber, lines, Septic Tank, STP) Yes 0% Proposed 4 Storm Water Drains Yes 0% Proposed 5 Landscaping & Tree planting Yes 0% Proposed 6 Street Lighting Yes 0% Proposed 100 % Club & Gymnasium Executed in 7 Community Buildings Yes Gokuldham Proiect 01 Treatment and disposal of sewage and sullage 50% 8 water Yes STP 0% Garbage chute/ Ghantagadi Nashik Municiple 9 Solid Waste management & Disposal Yes corporation 0% Rain water 10 Water consenration, Rain water harvesting Yes Harvesting 0% Use Of CFL & LED 11 Energy management Yes Lighting 30% Fire Fighting System, Lighting 12 Fire protection and fire safety requirements Yes arrester Electrical meter room, sub-station, receiving 50% 13 station Yes Substation ready t4 Aggregate area ofrecreational open space Yes 0% Proposed 15 Open Parking Yes 0% Proposed Yours',*ililL AT. TAPASYA H. BENDALE. (cN2004/33306) Ar. Tapasya H.Bendale (Reg.No. CA I 2004 I 33306) 3