Ar. Avinosh G. Kothowqde B.Arch, A.l.l.A. F.l.V cA/98/23341 Tel.: +91 98220 8-]823, +91 985099'l823 ovi noshk_o rch@yohoo. com FORM 1 Date: 15.03.20L9 To, Royal Buildcon Plot No. 22,"Vardan", Rameshwar Nagar, Kamathwada, Nashik - 422OtO Subject: Certificate of Percentage of Completion work of building name BtLIPATRA APARTMENT for Construction Work of 1 Building, situated on Plot No. 9 + 10 bearing Survey. No 77;lal2 demarcated by its boundaries (latitude and longitude of the end points) 12 Meter Road to the North, Adj. S'No. 994 (Part) to the South, Plot No. lL to the East, plot No. g to the West of Division NASHIK, Village NASHIK, Taluka NASHIK, District NASHIK, PtN 422009 admeasuringT4l Sq. Mtrs, Area being developed by ROyAL BU|LDCON. Sir, I Ar. Avinash Gangadhar Kothawade have undertaken assignment as Architect of certifying Percentage of completion of construction work of the project BILIPATRA APARTMENT for Construction Work of 1 Building, situated on the Plot No. 9 + 10 bearing Survey. 1751412, of Division NASHIK, Village NASHIK, Taluka NASHIK, District NASHIK, plN 422009 admeasurin gl47 Sq. Mtrs. Area being developed by Royal Buildcon. 1. Following technical professionals are appointed by owner / promoter:- (i) Shri Avinash Gangadhar Kothawade as Architect ; (ii) Shri Bhavesh Patel as Structural Consultant Based on Site lnspection, with respectto each of the Buildings of the aforesaid Real Estate project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building of the Real Estate project as registered vide number under RERA is as per table A herein below. The percentage of the work executed with respect to each of the major activity of the Building / Wing and overall Percentage of the work done with respect to each Building / Wine is detailed in the Table B. / Table A BILIPATRA APARTMENT Building Sr.No. Tasks / ectivity Percentage L Excavation 0 2 L number of Plinth 0 3 0 number of Podiums 0 4 1- Stilt Floor 0 5 5 number of Slabs of Super Structure 0 6 lnternal Walls, lnternal Plaster, Floorings within the Flat / Premises, Doors 0 and Windows to each of the Flat / Premises 7 Sanitary Fittings within the Flat / Premises, Electrical Fittings within the 0 Flat / Premises, 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 0 Staircases and Lifts, Overhead and Underground Water Tanks 9 External Plumbing and External Plaster, Elevation, Completion of Terraces 0 with Waterproofing of the Building / Wing 10 lnstallation of Lifts, Water Pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical Fittings to Common Areas, Electro, Mechanical Equipment, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of areas 0 appurtenant to Building / Wing, Compound Wall and all other 'requirements as may be required to obtain Occupation / Completion Certificate. \ TABLE - B BILIPATRA APARTMENT Building lnternal & External Development Works in Respect of the project Percentate Common Roads and Facilities, Proposed Sr. No. of Work Details Amenities (Yes/No) done L lnternal Roads and Footpaths No 0 NA Willobtain from NMC after 2 Water Supply Yes 0 completion Sewerage (Chamber, Lines, Septic Septic Tank, Will do before 3 Yes L00 Tank, STP) obtaining completion 4 Storm Water Drains No 0 NA 5 Landscaping and Tree Planting No 0 NA 6 Street Lighting Yes 0 By NMC 7 Community Buildings No 0 NA Treatment and Disposal of 8 No 0 NA Sewage and Salvage Water Solid Waste Management and 9 No 0 NA Disposal 10 Water Conservation and Rain No 0 NA Water Harvesting LL Energy Management No 0 NA L2 Fire protection and Fire Safety No 0 NA Requirements 13 Electrical Meter Room, Sub- Yes 0 No separate room Station, Receiving Station YoursFaithfully % -.a----.*-l 0 I Ar. Avinash Gangadhar Kothawade. B.Arch., A.l.l.A., F.l.V., cA|98.23341.