DESIGN SQUARE ASSOCIATES Hemant Pawar, Sandip Jagtap BUILDING PLANNER .INTEROR DESIGN LANDSCAPE Nashil:?-422002. Ph.: 9921383790 ARCHITECT'S CERTIFICATE Date: '2--c/11 /2..613 To M/S .SAIPRASAD BUILDERS & DEVELOPERS Thr. MR. G. V. YEOLE , SNEHPRASAD BUNGLOW, NEAR MARUTI MANDIR, KHUTWAD NAGAR, KAMATWADA, NASHIK. Subject: Certificate of Percentage of Completion of Construction Work of 01 No. of Building of the Project SHREE GANESH APARTMENT proposed to registered under MahaRERA situated on the Plot bearing P.No.07+08, S.No. 53/1/1 of Gangapur Shiwar, Dharmaji Colony, Shiwaji Nagar, Nashik demarcated by its boundaries P.No.09 to the North, 9.00 MW Road to the West, plot no.06 to the South, . P. No. 53 to the East, of Gangapur Shiwar Nashik,taluka Nashik, District Nashik, admeasuring 560.00 sq.mts. net plot area being developed by M/S SAIPRASAD BUILDERS & DEVELOPERS,Thr. MR. G. V.YEOLE . Sir, 1/ We Mr. S. M. JAGTAP ofM/s. Design Square Associates have undertaken assignment as Licensed Enginner of certifying Percentage of Completion of Construction Work of the 01 nos Building of the project SHREE GANESH APARTMENT proposed to be registered under Maha RERA situated on Plot bearing P.No.07+08, S.No. 53/1/1 of Gangapur Shiwar, Dharmaji Colony, Shiwaji Nagar, Nashik of taluka District Nashik, admeasuring 560.00 sq.mts. net plot area being developed by M/S SAIPRASAD BUILDERS & DEVELOPERS,Thr. MR. G. V. YEOLE. 1. Following technical professionals are appointed by Owner / Promoter :- (i) Mr. S. M. [agtap of M/s. Design Square Associates as Lic. Engineer registered no. 173 (ii) Mr.Ramesh Rampariya as Structural Consultant registered no . . (Hi) Shri Sunil Khankari_as Site Supervisor Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Itroject , I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project proposed to be registered under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Building /Wing Number 01Cto be prepared separately for each Building /Wing of the Project) Sr. No Tasks / Activity Percentage of work done 1 Excavation 100% 2 01 no of Plinth 100% 3 number of Podiums NIL 4 Stilt Floor 100% 5 05 number of Slabs of Super Structure 80% 6 Internal walls, Internal Plaster, 0% Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, 0% Electrical Fittings within the Flat/Premises 8 Staircases, Lifts Wells and lobbies at each 0% Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, 0% elevation, completion of terraces with waterproofing of the Building/Wing, 10 . Installation of lifts, water pumps, Fire Fighting Fittings 0% and Equipment as per CFO NOC, Electrical fittings to. Common Areas, electro, mechanical equipment, Compliance to' conditions of environment /CRZ NOC, Finishing to entrance Iobbv/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate TABLE-B Internal & External Development Works in Respect of the entire Registered Phase Sr.No Common areas and Facilities, Amenities Proposed Percentage Details (Yes/No) of Work done 1. Internal Roads & Foothpaths No NA Plot is from approved layout. 2. Water Supply Yes 0 3. Sewarage (chamber, lines, Septic Tank, STP) . Yes 0 4. Storm Water Drains Yes 0 5. Landscaping & TreePlanting Yes 0 Tree planting 6. Street Lighting No NA 7. Community Buildings No NA 8. Treatment and disposal of sewage and sullage Yes 0 Septic Tank water 9 Solid Waste management & Disposal No NA 10 Water conservation, Rain water harvesting Yes 0 Rah~water harvesting 11 Energy management No 0 12 Fire protection and fire safety requirements No NA 13 14 ~- Electrical meter room, sub-station, receiving station OthE;J;s ( Option t . l"'.$'~';~ Yes 0 Electrical meter Panel Iif