RAVI AMRUTKAR ASSOCIATES architecture I interiors Ilandscape ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date 10th OCT,2019 To, The Padma Vishwa Oxyflow Via Siddhi Construction through Jagdish V. Kankrej Subject: Certificate of Percentage of Completion of Construction Work of 1 No. of Building(s)/1 Wing(s) of the SINGLE Phase of the Project [P51600020387] situated on the Plot bearing C.N. No/CTS No.lSurvey No. 35/5/2+3/ Final Plot No. 07 demarcated by its boundaries P no 06 to the North Sr no 34/4 to the South Open Space to the East 9 m wide road to the West of Division ~~"':IIK Village Anandwali Taluka NASHIK District NASHIK PIN 422 - 013 admeasuring ~ 'gq.mts. area being developed by JAGDISH V. KANKREJ. Sir, 1/ We ARSAURABH R. AMRUTKAR have undertaken assignment as Architect !Licensed Surveyor of certifying Percentage of Completion of Construction Work of the 1 Building(s)! 1 Wing(s) of the SINGLE Phase of the ProJect, situated on the plot bearing C.N. No! CTS No.lSurvey No 35/5/2+3/ Final Plot No. 07 demarcated by its boundaries P no 06 to the North Sr no 34/4 to the South Open Space to the East 9 m wide road to the West of Division NASHIK Village Anandwali Taluka NASHIK District NASHIK PIN 422 - 013 admeasuring 444.22 sq.mts. area being developed by JAG DISH V. KANKREJ . 1. Following technical professionals are appointed by Owner / Promoter :- (i) M/s/Shri/Smt. ARSAURABH RAVI AMRUTKAR as L.S. / Architect; (ii) MIs /Shri I Smt. STRUCTON DESIGNER (MR.CHOPDA) as Structural Consultant (iii) M/s /Shri / Smt. NOT APPLICABLE as MEP Consultant (iv) M/s IShri / Smt. NOT APPLICABLE as Site Supervisor Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project I certify that as on the date of this certificate, the Percentage of Work done I for each of the building/Wing of the Real Estate Project as registered vide number +91-9766444333 contact@raviamrutkarassociates.com yeolekar mala/college road,nashik-42200S P51600020387 under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A Building IWing Number 1 (to be prepared separately for each Building !Wing of the Project) Sr. Tasks IActivity Percentage of work No. done (2) (1) (3) 1 Excavation 100 % 2 o number of Basement(s) and Plinth 100 % 3 o number of Podiums 0% 4 Stilt Floor 100 % 5 5 number of Slabs of Super Structure 100 % 6 Internal Walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of 100 % the FlaVPremises. 7 Sanitary Fittings within the Flat/Premises, 0% Electrical Fittings within the FlaVPremises. 8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, 60 % Overhead and Underground Water Tanks. 9 The external plumbing and external plaster, elevation, completion of terraces with 60 % waterproofing of the Building/Wing. 10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, 0% mechanical equipment, Compliance to conditions of environment ICRZ NOC, Finishing RAVI AMRUTKAR ASSOCIATES architecture I interiors Ilandscape to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/wing, Compound Wall and all other requirements as may be required to obtain Occupation I Completion Certificate. TABLE-B -.. . Internal and External Development Wor1