-•r1 nlT IA R·I / I ArchDes askactrI Inte Prashant ThemArc itectsrs hite rior igne L e Muth ol Hosp ital, . F-2 First Floor, Hori Niwo s Build ing, Besid ® 1 op p. NMC Grou nd, Nos~ ik Road - 422 101 --■ • @) prast1 antarc hitect s@gm a1l.co m ~~) 98 nl 726;.,8 @l 025.1-7452658 ---- ·----- ------ -----· .r·-- ----- ··-·- -·· FORM1 ARCHITECT'S CERTIFICATE Date: 31/0 3/20 24 To, KBC GLOBAL LIMITED ~ ; 2nd Floor, Gulmohar Status above Business Bank, Samarth Nagar, Nashik - 422005 n of Construction Work of 1 Building of the Subject: Certificate of Percentage of Completio g MahaRERA Registration Number Project Hari Krishna Phase -IV havin al Limited. PS1 6000 2032 4 being developed by KBC Glob Sir, nt as Architect Certifying Percentage of I Prashant Themaskar have undertaken assignme of the Project Hari Krishna Phase -IV having Completion of Construction Work of 1 Building 4 being developed by KBC Global Limited. MahaRERA Registration Number P51 6000 2032 Q Based on the Site Inspection, with respect to the Layout / each Building/Wing of the date of this Certificate, the Percentage of Work aforesaid Real Estate Project, I certify that as on e- Estate Project under MahaRERA is as per Tabl Done for each of the Building/Wing of the Real e A herein below. The percentage of work exec uted with respect to each of the activity of entir Phase is detailed in Table-B. / I Archit~ct askarI Inter Prashant ThemArch s itect ior Desi gner s al, F-2 First Floor, Hal'i Niwos Buildin g, Beside Mutho l Hospit . or;P, NMC Ground . Nos~ik Road - 422 101 prast1 antarch itects(f t)gma1 l.com ({\) Y8:?2172658 (:~) 0253-24 52658 .----·-- --·---- ----·-- -··---- -· ', --- --- --- TABLE-A Build ing Numb er -1 Perce ntage of Actua l Work S. No. Tasks / Activity Done (As on date of the Certif icate) (3) (1) (2) 100 1. Excavation NA 2. Basem ents (if any) NA 3. Podiu ms (if any) 100 4. Plinth 100 5. Stilt Floor 100 6. Slab of Super Struct ure 85 7. Intern al Walls, Intern al Plaste r, Floorings, Doors, windo ws within Flats / Premi ses 30 8. Sanita ry Fittings within Flats / Premi ses 70 9. Staircases, Lift Wells & Lobbies at each Floor Level Overh ead and Under groun d Water Tanks 10. External Plumbing & Extern al Plaste r, Elevat ion, 95 Completion of Terrac es, with water proofi ng of the Building / Wing 11. Installation of Lifts, Water Pump s, Fire Fighti ng 50 Fittings and Equip ments as per CFO NOC, Electr ical Fittings, Mechanical Equip ments , Comp liance to condit ions of Enviro nment / CRZ NOC, Finish ing to Entran ce Lobby/s, Plinth Protec tion, Paving of Areas appur tenan t to Building/Wing, Comp ound Wall and all ~ther requir ement s as may be requir ed to compl ete ProJect as per specif ication s to Agree ment of Sale Any other Activity ' I Architects Prashant ThemaskarI Inter ior Designers Arch itect l Hospit ol ~) F-2, First Floor, Hori Niwos Building, Beside Mutha ' Opp. NMC Ground , Noshik Road - 422 101 ~\) 9822171.658 @) 025.l-245}.658 @) prast1antarchitacts(~gmail.com TABLE-B respect of the Registered Phase / Common Areas (Internal & External Development Works) in Project Number- Hari Krishna Phase IV Common Areas & Proposed Percentage of actual Details S. No. Facilities (Yes / Work Done NO) {As on date of Certificate) (3) (4) (5) (1) (2) 1. Internal Roads & Footpaths Yes 70 Water Supply Yes 80 2. Sewerage (Chamber, Lines, Yes 80 3. Septic Tank, STP) 4. Strom Water Drains Yes so & Tree Yes 0 5. Landscaping Planting Yes 0 6. Street Lighting NA NA 7. Community Buildings NA NA 8. Treatment & Disposal of Sewage and Sullage Water Yes 0 9. Solid Waste Management & Disposal Yes 0 10. Water Conservation / Rain Water Harvesting NA NA 11. Energy Management YES 0 12. Fire Protection & Fire Safety requirements Yes 0 13. Electrical Meter Room, Sub- Station, Receiving Station NA NA 14. Others - Recreational open space Yes 0 15. O_pen Parking Yours faithf~y, r itect: PRASHANT THEMASKAR Sig Lie Agre