SHRIDHAR PUJARI Consu Iting Civii Engineer Mail ld: shridharpujari1967@gmailcom FORM -2 ENGINEER'S CERTIFICATE Date: 31/03/2020 To KBC Global Limited Znd floor, Gulmohar status, Above Business Bank Samarth Nagar, Nashik422005. Subyect Certificate of Cost incurred for Development of Work of 1 Building of the Project Hari Krishna Phase -IV having MahaRERA Registration Number: P51600020324 being developed by KBC Global Limited. Sr 1. IMr. Shridhar Pujari have undertaken assignment of Certifying Estimated Cost for Hari Krishna Phase -IV having MahaRERA Registration Number: P51600020324 (Only applicable after Project Registration) being developed by KBC Global Limited. 2. We have estimated the cost of Civil, MEP and Allied Works required for completion of the apartments &proportionate completion of internal &external works of the Project as per the specifications mentioned in the Agreement of Sale. Our estimated cost calculations are based on the Drawings/Plans made available to us for the Project under Reference by the Developers / Consultants. The Schedule of Items &Quantity required for the entire work as calculated by Shridhar Pujari Quantity Surveyor" appointed by the Developer/Engineer, the assumption of the cost of material, labour &other inputs made by the Developer, and the Site Inspection carried out by us to ascertain /confirm the above analysis given to us. SHRIDHAR PUJARI Consulting Civil Engineer Mail ldi shridharpujari1967O ynaileom 3 We estimate Total stimated Cost of comptetion of the aforesd Prngnet menrinnet under reference at Re. #,17,$2,000/- (Total of Table ALE) the time of Regartnn The estimated Total Cost of Project is with reference to fhe Col, MEP Aliet Woes completion of the apartments &praportionate completion of internal eternal wores as per the specifications mentioned in the Agreement of Sale toe the grarpna nf oltaining Occupatlon Certificate / Completion Certifcate for the Buildingts) / Wngts / Layout / Plotted Develapment from the NMC being the Panning Authrity under whose jurisdiction the aforesaid Project is heingimplementeti. 4. The Estimated Cost incurred till date is calculates to Rs. 1,22MMO/- (Tatal of Tatie A & B), The Amount of Estimated Cost Incurred is calculated on the batit of ingt materials / services used &unit cost of these items. 5. The Balance Cost of completion of the Civil. MEP &Allied Works for campletian of Apartments & praportionate completion of internal & eternal warks, per specifications mentioned in Agreement of Sale, of the aforesaid Project is estimatert at Rs. 6,94,84,510/- (Total of Table A&B). 6. I Certily that the cost of Civil, MEP& Allied Work for apartments propartionate Internal &external works, as per the specifications mentioned in Agreement of Sale, of the aforesald Project as completed on the date of this certificate is pven in Table A B below: TABLE -A Building A S. No. Particulars Amount (in Rs) 1, ToDrai Estimated Lost oT Euidink /Wing/Layout / Rs. 8,17,52,000/ Registration is Cost incurred as on date of Certilcate Rs. 1,22,67,490/ Work Done in Percentage (as Percentage of Estimated Cost) 1. Balance Cost to be incurred " ((based on Estimated Rs, 6.9484 51O/ Cost) Cost incurred on Additional /Extra Items not NA included stimated Cost (Table-C SHRIDHAR PUJARI Consulting Civil Engineer Mail ld: shridharpujari1967@gmailcom TABLE-B Internal &External Development Works in respect of Registered Phase S No. Particulars Amount (in Rs) Total Estimated Cast of Internal &External Rs57,22,640/ Development Works incuding amenities &facilities inthe Layout as on date of Registration is 2 Cost incurred as on date of Certificate Rs5,72.264/ Work Done in Percentage (as Perrentage of 10% Estimated Cost) Balance Cast to be incurred * ((hased on Estimated Rs51,50.376/ Cost) Cost incurred on Additional/Ektra Items not Ni incduded in the Estimated Cost (Table-C) Yours faithfully, Signatup& Nhme (IN BLOCK LETTERS) with Stamp of Engineer: MR. SHRIDHAR PUJARI Agry4 &Accepted b Sign