FORM-2A ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE To, KBC GLOBAL LIMITED 2nd floor, Gulmohar status, above Business Bank, Samarth Nagar, Nashik-422005 Quality Assurance Certificate (Certificate No-for the Quarter Ending 31.03.2023) Subject: Certificate for quality of materials used and quality of Construction and workmanship for the Work of 5 Building(s) of the project Hari Kunj Mayflower having MahaRERA Registration Number: PS1600020249 being developed by KBC Global Limited. Sir, I, Mr. Kunal Pathare have undertaken an assignment of supervision of this real estate project. OUR RESPONSIBILITY Iam responsible for carrying out the work in accordance with that with development permission and as per the approved plan and submit certificate of supervision of work and to carry out material testing in-situ or in authorised laboratory and to ensure quality of work &workmanship as per prescribed specifications, &as per NBC and/or other relevant code of practice. |1] INPUT MATERIALS, FIXTURES & FITTINGS hereby certify that all Construction material, Fixtures and Fittings with regard to the flooring, Electrical, Sanitary Fittings, etc and amenities to be provided by the Promoter in the said project, building and the Apartment as are as per specifications mentioned in Annexure 'E, of Agreement to Sale. For those items, where no specification have been mentioned in Agreement of Sale, the Materials, Fixtures and Fittings used conform to the relevant BlS Standard / IS/ National Building Codes or as per Industry Standards. |2] WORKMANSHIP Ihereby certify that the work has been carried out under our supervision. Ifurther certify that workmanship and quality is satisfactory and up to the mark and the work has been acceptable within the permissible limits deviation as per relevant code of practice. (3] STRUCTURAL ENGINEER Promoters has engaged structural engineer Mr. Shailesh Dhumane having Licenses no 700085 dated 21.01.2021 having office at 7/8, Rajeev Enclave New Pandit Colony Nashik, cell no 9422045311. The structural design of buildings in this Project has been done under his supervision. The formwork and concrete mix design has been done as per IS 10262:2009 or as per other relevant codes as applicable. His periodic checks and certificates for STABILITY and SAFETY have been kept on record. |5] PRESERVATION OF RECORDS Record of all test results of this Project have been properly kept in the prescribed format and will be preserved at least up to the Defect LiabilĂ­ty Period or for the period as required by any other provision of Law. Please spccify deviation in quality of materials or any other item of work which were not conforming to the specifications as mentioned in Agreement of Salc. Yours faithfully, tkurleatorU Signature of igineer (Site Supervisor) Name: Mr. Kunal Pathare Qualification: License No (if any): Mobile No: 8554994762 Place: Nashik Agreed &Accepteq by: Signature gPrdmbter Name: Nresbtagumal Karda Date: 01/04/2023