VIJA Y ti. AMt:~UK STRUCTURAL & CONSULTING ENGINEERING e-mail:-aOllluNijay@amail.com. FLAT NO. 03, SURUD APARTMENT, NEAR RAMDAS GARDEN, CANADA CORNER, NASIDK - 5, MOBILE:- 8446433335 Annemre-B F'OIlM-2 [See Replation 3] ENGINEER'S CERTIFICATE (To be .......... !be...... ~ ........... ~OIIPIII Prqject ..... ilrwltbdrawal olMGaeyrr- 1)eeIp...... AaIaaDt- Prqject wile) To, Date 05/12/2022 Mr. Nitin DayalallCotbari, 27, Swutik, Cha1Jhan Napr, Tapovan Road, Tapovan, Panchvad, Nashik - 422003. Subject: Certificate of Cost Incurred for Development of project having Maha-ORA Registration Number P516ooo19135 which is named 88 Monsoon Mist situated at Mauje Pardevi Shiwar on the Plot bearing GAT No. / CIS / S. No. 279/1/2 • so/SS/C-Part. Final Plot No. 01 of DiviIion Nasbik WJap Pardevi Taluka Iptpuri Diatrict Nuhik PIN ~22402. admeuuring S,408.99 Sq. Mts. area being developed by Mr. Nitin Dayalal Kothari. Sir, 1. 1/ We Mr. Vijay B. Amesure have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project named Monsoon Mist haviDa Maha-RERA Re&istration Number P516ooo19135 being developed by Mr. N"rtin Dayalal1Cothari. 2. We have estimated the cost of Civil, MEP, and allied works required for the completion of the Buildin&(a) and proportionate completion of Internal • External work of the project as per specifications mentioned in agreement of sell. Our estimated cost calculations are based on the Drawinp / Plans made available to us for the project under reference by the Developer / Consultants. The scheduled of items and quantity required for the entire work as calculated by Mr. Vijay B. Amesure Quantity Surveyor* appointed by Developer / Bngineer. The aaaumption of the cost of material. labor and other inputs made by developer, and the site inspection carried out by us to ascertain / confirm the above analysis given to us. S. We estimate Total Eltimated Coat of completion of the buildin&(s) of the aforesaid project under reference 88 RI. 7.90,27.086/- (rataloiTUleA ..... B). The eat:imated Total Cost of project is with reference to the Civil, MEP and allied works required to be completion of the buildin&(a) and proportionate completion of internal and external works, 88 per specifications mentioned in the agreement of sell and for the purpose of obtaining occupation certificate / completion certificate for the buildiDg(s) / Wmp(s) / Layout / Plotted Development from the Town plan nina Department, Nasbik being the Pllnning Authority under whose jurisdiction the aforesaid project is being implemented. 4- The Estimated Cost Incurred till date is calculated at Rs. 6,70.91,659/- (rotaloiTUleA ...... ). The amount of Estimated Cost Incurred is calculated on the basis of input materials / services used and unit cost of the items. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the BuildiDg(s) and proportionate cOmpletion of internal and external works, as per specification mentioned in the agreement of sell of the project is estimated at Rs. 1,19.35.427 / - CI'otal ~TUleA_ .). 6. I certify that the Cost of the Civil. MEP and allied work for the building(s) and . proportionate intemal and external works, as per specifications mentioned in agreement hvaG.uDay... of sell of the aforesaid Project 88 completed on the date of this certificate is as given in Table A and B below: TABLE-A Building Monsoon Mist Br.No Particulars Amounts in INll (1) (2) l31 1 Total Estimated cost of the Building Monsoon Mist as on date of D.' tion is 28/12/2018. 7,90,27.086 2 Coat incurred 88 on 05 December 2022 (a.-taa ... lIIi.....alllIIIt) 6~t,6_59 3 Work done in Percentage EIGHTY-FIVE {. althelld---taail 8S" 4 Balance Coat to beIncurred" (IIIId aalltim.... Colt) 1110. '!I.I: 42'1 5 Cost Incurred on Additional/Pma Items as on Dot included in 0 the Estimated Cost ChbIe - C). TABLE-B Internal and External Development Works in ft of the_Rgistered Phase Sr. No Particulars Amounts in INll (1) (2) l31 1 Total Estimated cost of the Internal and External Development Works including amenities and Facilities in the layout as on date -NA- of"' . nis 2 Cost incurred as on date of Certificate (bMal aa the 1IIi-- alit). -NA- 3 4 Work done in Percentage ZERO (II aIdie lltillllted COlt). Balance Cost to be Incurred (..... aa ..... 1IedColt). 0" -NA- 5 Cost Incurred on Additional /Extra Items 88 on not included in the Estimated Cost crable- C). -NA- TABLE-C List of Extra 1Additional I Deleted Items considered in the Cost Br.No List of Extra / Additional/ Deleted Items Amounts in INll (1) (~ (3) 1 :I 3 Yours FaithCu!!Ytll\. . NITIN D. KU') t -LtJ"",. AWftlMi'~w.fR>Inotor P' JT~ - Proprietor ct&'l?; Name of Engineer MR. VUAYB. AMBsURE (License No. SELR 149) Name: - MR. NITINDAY~ Date: - _