VIJAY B. AMESUR STRUCTURAL & CONSULTING ENGINEER E-maiI:-anaurvljayOgrnal.com FLATNO.os.IURUD8OCIETY,NEARRMIIMBGMDEN.CAlWMCORNER,M8HI(-"II08I.E·-~74D1,'4"'" FORM-2 [See ..... Iion s1 ENGINEER'S CERTIFICATE (TDbe ........ ltteilat................. ODFIDIProject ... _ ......... at..... fnllDD .................. wIIe) To, Mr. N"1tiD DayaJallCotbari, 27, Swutik, Cballhan Napr, Tapovan Road, TapcJVllll, Panchvati, Nubik - 422003. Subject: Certificate for quality of materiaI8 ued and quality of ConItmclion and workmanship for the Work of MODIOOD Mist No. of BaiJctiDl Two of the phue One of the Project situated in Maqje Pardevi Sbiwar Tal Iptpari Dist. Nuhik on the Plot 'beariIIi Survey No./GAT No. 279/1/2 and 30/SS/C-Part Pinal Plot No. 01 Hilla No. 04 demarcated by ita boundarieI24 Mil Road to the North 12 Mil Road to the South Plot No. 04 IkAmeuitJ Plot to the But 12 Mta Road to the West ofDivilicm Naahik ViIIap Pardevi Talub IptpuriDistrict Naahik PIN 422402 admeuuriDa 3,408.99 Sq. Mil. area beiDa developed 81 a project MODIOOn Mist by Mr. NitiD DayalalICotbari. Ref: MabaRERA aeptration Number P51600019135. Sir, I/We Mr. Vljay B.Amelare baveandertalrm tujpment ofcertif;yiDa Estimated Colt for the Subject Real ..... Project named Nirmal ParitApartment propoaed to be reaisterecl DDder Maha-RERA, A project MODIOOD Milt beina One BuDdin. of the One Phase aituated inMaqje Pardevi Sbiwar TaL IptpmiDiIt. Nubik on the Plot beariD& Survey No./GAT No. 2'/9/1/2 anclSO/SS/C-Part PInal Plot No. 01 Hilla No. 04 demarcated by ita bouncIariea 24 Mil Road to the North 12 Mti Road to the South Plot No. 04 &: AmeuitJ Plot to the But 12 Mil Road to the West of Division Nuhik ViDap Pardevi Ta1uka Iptpari DIItrid: Nubik PIN 422402 admeaurina 3,408.99 Sq. Mil. .. beiDa developed 81 aproject MODIOOJl Milt by Mr. N"1tin Dayalal Kothari. 1. P'oDowiDI tecJmieaI pro&eaional, are appointed by Owner / Promoter: - (I) M/8/Sbrl/Smt 'Uanj'b Jadbav 88 LS./ Architect; • (Ii) M/,/Shri/Smt VJjay B. Ameaure as Stnu:tural CoDsu1tant (iii) M/I/Sbri/Smt 88 MBP Consultant (iv) M/I/Sbri/Smt 8aDdip Jam 81 Quantity SUrveyor • 2. We haft estimated the c:oet of the mmpletioa to obtain Occupttiou Certificate/ Completion Certific:ate, of the ClvU, MBP and Allied works, oftha BuDcJiD&(l) of the project. Oar estimated c:oet ca1CUJatj01l8 are baaed on the DrawinpJplans made avaflable to us for the project UDder refereoce by the Developer and CoDaultanIl aDd the Schedule of items and quantity for the entire work 81 caJalJated by Mr. Vljay B. AmeIure Structural CoD8Ultant &:Mr. 8andip Jam as a quantity 8urVeJor appointed by Developer/EDgineer, and the III'Imption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by WL ~,~ hvac:.. 3- We estimate Total Bstimated Cost of completion of the building(s) of the aforesaid project under reference as Ra. 7,90,27,086/- rrotal of Table A and B). The estimated Total Cost of project is with reference to the Civil, MEl' and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from the Nashik Munieipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date iscalculated at Ra. 4,01,44,696/- rrotal of Table A and B). The amount ofBstimated Cost Incurred iscalculated on the base of amount of Total Bstimated C'AJst. 5. The Balance cost of Completion of the Civil, MEl' and.ADiedworb of the BuiJding(s) of the subject project to obtain Oc:cupation Certificate / Completion Catificate from Nashik J4unieipal Corporation being the panning Authority isestimated at Ra. 3,88,82,390 /- (Total ofTabieAand B). 6. I certify that the Cost of the CivU, KEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below: TABLE-A B • Monsoon Mist Sr.No Particulars Amounts in INR 1 1 5 ° TABLE-B Sr.No Particulars Amountsin INR. (1) (2) (~) 1 Total Bltimated COld: of the IntemalaDd Extemal Development Worb . • •• amea.ltiea aDd Fadlitia in the layOut as on date of'" • D -NA- 2 Cost incurred as on (baaed on the &timated cost). -NA- S Work done inPereenfa&e ZBRO(18 Percent8p of the esti.uted, cost). _(-NA-)0" 4 Balance Colt to be IDcIured (Baaed on F..stimated Cost). -NA- S Cost Incurred on AdditIonal {EIttraItems as on not included in the EItimated Cost (/-. Al. -NA- y£ ML VUAYB. AMBsuu (Liamse No.$f~J~'J)