AR. MANISH JADHAV ARCHITECTS 3, SURHUD SOCIETY, RAMDAS COLONY, CANADA CORNER, NASHIK – 2 PH.-(0253)3554219 CELL – 9422263711 Jadhav.manish744@gmail.com Annexure – A FORM 1 [ see Regulation 3] ARCHITECT’S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) To, Date 22/12/2023 Mr. Nitin Dayalal Kothari, 27, Swastik, Chauhan Nagar, Tapovan Road, Tapovan, Panchvati, Nashik – 422003 . Subject: Certificate of 96% Percentage of Completion of Construction Work of “MONSOON MIST” having Maha RERA Registration Number P51600019135 (Only Applicable after project Registration) being developed by Mr. Nitin Dayalal Kothari. Sir, I/ We Mr. Manish Prabhakar Jadhav have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of project name “MONSOON MIST” having Maha-RERA Registration Number P51600019135 being developed by Mr. Nitin Dayalal Kothari. Based on Site Inspection, with respect to the Layout / Each Number of Building / Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work Done is 96% for each of the Layout / Number of Building / Wing of the Real Estate Project is as per Table – A herein below and the percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Page 1 of 2 TABLE – A (To be prepared separately for each Layout / Building / Wing Number of the project) Building Name: - Monsoon Mist Building Number / Wing: - -- Date of RERA Registration: - 28 December 2018 RERA Registration Number: - P51600019135 Proposed Extension Date of 30TH JUNE 2024 Completion: - Sr. Tasks /Activity Percentage of No. (2) Actual Work (1) Done (3) 1 Excavation 100 % 2 Basement (If Any) --NA-- --NA-- 3 --NA-- number of Podiums (If Any) --NA-- 4 Plinth 100 % 5 Stilt Floor --NA-- --NA-- 6 FIVE number of Slabs of Super Structure 100 % 7 External & Internal Walls Brick Work, Internal Plaster, 90 % Floorings, Doors and Windows within each of the Flats/Premises. 8 Sanitary Fittings, Electrical Fittings within the each Flat/Premises. 70 % Staircases, Lifts Wells and Lobbies at each Floor level, Overhead 9 and 90 % Underground Water Tanks. The external plumbing and external plaster, elevation, 10 completion of terraces with waterproofing of the Building/Wing. 90 % Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to 11 conditions of environment /CRZ NOC, Finishing to entrance 0% lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate and complete project as per specifications in the Agreement of Sale. Any Other Activities. Page 2 of 2 TABLE-B Common areas (Internal and External Development Works) in respect of the Registered Phase / Project Number. Sr. Common areas and Proposed Percentage of Details (5) No. Facilities, Amenities (Yes/No) Actual Work done (1) (2) (3) (4) 1 Internal Roads & Footpaths YES 100 % In Progress 2 Water Supply YES 0% In Progress 3 Sewerage YES 0% In Progress (Chamber, lines, Septic Tank, STP). 4 Storm Water Drains NO --NA-- --NA-- 5 Landscaping & Number of FIVE YES 50 % In Progress Tree Plantation. 6 Street Lighting YES 100 % In Progress 7 Community Buildings NO --NA-- --NA-- 8 Treatment and disposal of YES 50 % In Progress sewage and sullage water. 9 Solid Waste Management NO --NA-- --NA-- & Disposal. 10 Water Conservation, YES 0% In Progress Rain water harvesting. 11 Energy management NO --NA-- --NA-- 12 Fire protection and Fire Safety NO --NA-- --NA-- Requirements. 13 Electrical Meter Room, Sub- YES 0% In Progress Station, Receiving Station. 14 Others (Option to Add more). -- Yours Faithfully, Agreed and Accepted by Ar. Manish P. Jadhav Signature of Promoter (License No.CA/2016/75326) Name: - M R. NITIN DAYALAL KOTHARI nd Date: 22 December 2023 Page 3 of 2