AR. MAN ISH JADHAV ARCHITECTS 3, SURHUD SOCIETY, RAMDAS COLONY, CANADA CORNER, NASHIK - 2 PH.-(0253)3554219 CELL - 9422263711 Jadhav.manish744@gmail.com Annexure-A FORM 1 [ see Regulation 3] ARCHITECTS CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) To, Date 03/12/2022 Mr. Nitin Dayalal Kothari, 27, Swastik, Chauhan Nagar, Tapovan Road, Tapovan, Panchvati, Nashik - 422003. Subject: Certificate of Percentage of Completion of Construction Work of Monsoon Mist situated in Mauje Pardevi Shiwar on the Plot bearing GATNo. / crs / Survey No. 279/1/2 & 30/3s/C-Part Final Plot No. 01 having Maha-RERA Registration Number P51600019135 being developed by Mr. Nitin Dayalal Kothari. Sir, II We Mr. Manish Prabhakar Jadhav have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of project name Monsoon Mist having Maha-RERA Registration Number P51600019135 being developed by Mr. Nitin Dayalal Kothari. Based on Site Inspection, with respect to the Layout / Each Number of Building / Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the SEVENlY- FIVEPercentage of Work Done for each of the Layout I Number of Building / Wmg of the Real Estate Project is as per Table - A herein below and the percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A (To be prepared separately for each Layout I Building I Wing Number of the project) ilding Name: - Monsoon Mist .. ilding Number / Wing: - -- te of RERARegistration: - 28 December 2018 .RARegistration Number: - P51600019135 posed Date of Completion: - 31 December 2023 . Tasks /Activity Percentage of . (2) Actual Work Done .. _ (3) Excavation 100% Basement (If Any) --NA-- --NA-- --NA number of Podiums (If Any) -NA-- Plinth 100% hvaG.uDay ..... ,-- 5 Stilt Floor --NA-- --NA-- 6 J.1VE number of Slabs of Super Structure 100% I External & Internal Walls Brick Work, Internal Plaster, Floorings, 7 80% --. Doors and Windows within each of the Flats/Premises. 8 Sanitary Fittings, Electrical Fittings within the each Flat/Premises. 0% Staircases, Lifts Wells and Lobbies at each Floor level, Overhead and 9 Underground Water Tanks. 70% -. - The external plumbing and external plaster, elevation, completion of 60% 10 terraces with waterproofing of the Building/Wing. -- Installation oflifts, water pumps, Fire Fighting Fittings and Equipment as per CFONOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment ICRZ NOC, Finishing to entrance lobby/s, plinth 11 protection, paving of areas appurtenant to Building/Wing, ., 0% Compound Wall and all other requirements as may be required to obtain Occupation I Completion Certificate and complete project as per specifications in the Agreement of Sale. Any Other Activities. '--- TABLE-B Commonareas (Internal and External DevelopmentWorks) in respect of the Registered Phase I Project Number . Common areas and Proposed Percentage of Details Facilities, Amenities (Yes/No) Actual Work done (5) (2) (3) (4) ternal Roads & Footpaths YES 100% In Progress aterSupply YES 0% In Progress ewerage YES 0% In Progress hamber, lines, Septic Tank, STP). torm Water Drains NO --NA-- --NA-- n-dscaping& Number of FIVE YES 50% In Progress 'ree Plantation. treet Lighting YES 100% In Progress ommunity Buildings NO --NA-- --NA-- reatment and disposal of YES 50% In Progress w~e and sullage water. olid Waste Management & NO --NA-- --NA-- iSJ2Qsal. ater Conservation, YES in water harvesting. 0% In Progress nergy management NO --NA-- --NA-- ire protection and Fire Safety NO --NA-- --NA-- equirements. lectrical Meter Room, Sub- tatiQ_I.!z Receivinz Station. YES 0% In Progress ift YES 30% In Progress thers (Option to Add more). -- Yours Faithfully, N'~of~MANIsHl'RABIlAKARJADHAV (License No. CA/2016/75326) Name: - MR. Nl'I'1'N mY~ Date:- __ Page a of a