AR. MANISH JADHAV ARCHITECTS 3, SURHUD SOCIETY, RAMDAS COLONY. CANADA CORNER, NASHIK - 2 PH.-(0253)3554219 CELL - 9422263711 Jadhav.manish744@gmail.com Annexure-A FORM 1 [ see Regulation 3] ARCHITECT'S CERTIFICATE (To besubmitted at the time of Registration of Ongoing Projectand for withdrawal of Money from Designated AcOOunt) To, Date 08/03/2022 Mr. Nitin Dayalal Kothari, 27, Swastik, Chauhan Nagar, Tapovan Road, Tapovan, Panchvati, Nashik - 422003. Subject: Certificate of Percentage of Completion of Construction Work of Monsoon Mist situated in Mauje Pardevi Shiwar on the Plot bearing GATNo. / CTS / Survey No. 279/1/2 &: 30/3s/C-Part Final Plot No. 01 having Maha-RERA Registration Number PS1600019135 being developed by Mr. Nitin Dayalal Kothari. Sir, II We Mr. Manish Prabhakar Jadhav have undertaken assignment as Architect lLicensed Surveyor of certifying Percentage of Completion of Construction Work of project name Monsoon Mist having Maha-RERA Registration Number PS1600019135 being developed by Mr. Nitin Dayalal Kothari. Based on Site Inspection, with respect to the Layout I Each Number of Building / Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the SEVENTY Percentage of Work Done for each of the Layout / Number of Building / Wing of the Real Estate Project is as per Table - A herein below and the percentage of the work executed with respect to each of the activity of the entire phase is detailed inTable B. TABLE-A (To be nrenared separateb for each Lavout I BnildiDl!:I WlIU[Number of the Dtoiectl Building Name: - Monsoon Mist Building Number / Wing: - -- Date of RERA Registration: - 28 December 2018 RERA Registration Number: - P51600019135 Proposed Date of Completion: - 31 December 2023 Sr. Tasks / Activity Percentage of No. (2) Actual Work Done (1) (3) 1 Excavation 100% 2 Basement (If Any) --NA-- NA 3 --NA-- number of Podiums (If Anv) NA 4 Plinth 100% hvaG.uDay•.... Pager ofa 5 Stilt Floor -NA- -NA- 6 FIVE number of Slabs of SUDer Structure 100% External & Internal Walls Brick Work, Internal Plaster, Floorings, 7 Doors and Windows within each of the Flats/Premises. 50% 8 Sanitary Fittings, Electrical Fittings within the each FlatfPremises. 096 Staircases, Lifts Wells and Lobbies at each Floor level, Overhead and 9 6096 Underground Water Tanks. The external plumbing and external plaster, elevation, completion of 10 terraces with waterproofill2 of the Buildingjwing. 1096 Installation of lifts, water pumps, FIre Fighting Fittings and Equipment as per CPO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment ICRZ NOC, Finishing to entrance lobbyls, plinth 11 protection, paving of areas appurtenant to Building/Wing, 096 Compound Wall and all other requirements as may be required to obtain Occupation I Completion Certificate and complete project as per specifications in the .Aueement of Sale. Anv Other Activities. TABLE-B Common areas Ontemal and Bxteroal DeYeIopment Worb) in n!8pect of the Registel'edPbaae I Project Number . Sr. Common areas and Proposed Percentage of Details No. Facilities, Amenities (yes/No) Actual Work done (5) (1) (2) (3) (4) 1 Internal Roads & Footpaths YES 5096 In Proaress 2 Water Supply YES 096 In Progress 3 Sewerage YES 0% In Progress (chamber. lines. Septic Tank. STP). 4 Storm Water Drains NO -NA- -NA- 5 Landscaping & Number of FIVE Tree Plantation. YES 5096 In Progress 6 Street Lighting YES 5096 InProuess 7 Community Buildinu NO -NA- -NA- S Treatment and disposal of and sullue water. YES 20% In Progress 9 Solid Waste Management & NO --NA- --NA- Disposal. 10 Water Conservation, Rain water harvestina, YES 096 In Progress 11 Energy management NO --NA- NA 12 Fire protection and Fire Safety n • ements. NO --NA- -NA- 13 Electrical Meter Room, Sub- Station, Reeeivina Station. YES 096 InProgress 14 Lift YES 0% InProzress 15 Others (Option to Add more). -- Yours Faithfully, Agreed and Accepted by Promotor Name of R. MANIsH PRABHAKARJADHAV (License No. CA/2016/75326) Name: - MR. NmN DAYALAL KOTHARI Date: - _ Page 2 of a